Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.7 LQualified 125 FOUR STOREY TAGOGE GARDEN VISHAL MARKET NEW DELHI DELHI 110027 UDYAM DL 11 0019018 | WEST DELHI | DELHI | 110027 | ₹6.7 L | L1 | Qualified MSE, MII, Category: General |
| 2 | L2₹7.1 LQualified | ₹7.1 L | L2 | Qualified MSE, MII, Category: General |
| 3 | L3₹7.5 LQualified | ₹7.5 L | L3 | Qualified MSE, MII, Category: General |
| 4 | Disqualified 4 343 1 PLOT NO 51 SARVODAYA NAGAR COLONY MEERPET HYDERABAD TELANGANA 500097 UDYAM TS 09 0180927 | RANGA REDDY | TELANGANA | 500097 | - | - | Disqualified MII |
| 5 | Disqualified 2692 98 PVT NO 33 FIRST FLOOR RAJ MARKET ROSHAN PURA NAI SAARAK CHANDNI CHOWK CENTRAL DELHI DELHI 110006 UDYAM DL 01 0058090 | NORTH DELHI | DELHI | 110006 | - | - | Disqualified MSE, MII, Category: SC |
Tender Value
Refer Docs
EMD Value
Exempted
Closing Date
27 Mar 2026, 9:00 amClosed
REFILLING OF HFC 227EA GAS 1
1
2
3
3 HEPTA FLURO PROPANE
ZERO ODP
STORED PRESSURE
GAS
CONVENTIONAL GAS RELEASE PANEL WITH BATTERY BACKUP AND CROSS ZONING FACILITY 2-ZONE WITH FIRE EXT AUTOMATIC MINI INTUITIVE FK-5-1-2 300GM SS SP RED 79 C WITH NRV
MS CONTAINER STRAP FOR MOUNTING AND FIXING THE AGENT CONTAINERS TO THE WALL
UL CONTAINER STRAP FOR MOUNTING AND FIXING THE AGENT CONTAINER TO THE WALL
VALVE ASSEMBLY AND ARRANGEMENT FOR SUPERVISORY SWITCH CONNECTION FOR MONITORING CYLINDER PRESSURE
A PRESSURE GAUGE WITH A SAFETY BURST DISC AND A SAFETY CAP 25 BAR
PRESSURE GAUGE CUM SWITCH FOR MONITORING THE CYLINDER PRESSURE 0-60 BAR
22.50 BAR SWITCH POINT PRESSURE SWITCH WASCO SWITCH POINT 5BAR 72.5 PSIG IMP WITH FIRE EXT AUTOMATIC WM FK 5-1-12 4KG
HYDRO STATIC PRESSURE TEST 50 BAR
INVERTED BAKER TEST
HELIUM LEAK DETECTION TEST
EPOXY POWDER PAINTING
DISMANTLING
COMMISSIONING CHARGES
CONVENTIONAL OPTICAL SMOKE DETECTOR WITH DOUBLE DUST TRAP CHAMBER DESIGN
OPTIMIZED PERFORMANCE USING INTERNAL ALGORITHM
CENTRAL LED FOR 360 STATUS VISIBILITY
COMPILES TO EN 54-7 STANDARD
CONVENTIONAL RATE OF RISE HEAT DETECTOR
HEAT ALARM THRESHOLD TEMPERATURE 58 C CENTRAL LED FOR 360 STATUS VISIBILITY
COMPLIES TO EN 54-7 STANDARD AND APPROVED BY LPCB
VDS
INSTALLATION AND DELIVERY CHARGES
8862036
GEM/2026/B/7130129
Two Packet Bid
REFILLING OF HFC 227EA GAS 1,1,1,2,3,3,3 HEPTA FLURO PROPANE, ZERO ODP, STORED PRESSURE, GAS,CONVEN
Andhra Pradesh; Visakhapatanam
Total value wise evaluation
BOQ
4 documents required · 4 mandatory
3 yrs
₹4 L
50%
Exempted
Yes
27 Apr 2026
6 Mar 2026
27 Mar 2026
| Item No | Item Title | Qty | Unit | Consignee | Delivery (days) |
|---|---|---|---|---|---|
| 1 | REFILLING OF HFC 227EA GAS 1,1,1,2,3,3,3 HEPTA FLURO PROPANE, ZERO ODP, STORED PRESSURE, GAS | 60 | KG | MIHIR_SAHOO1 | 90 |
| 2 | CONVENTIONAL GAS RELEASE PANEL WITH BATTERY BACKUP AND CROSS ZONING FACILITY 2-ZONE WITH FIRE EXT AUTOMATIC MINI INTUITIVE FK-5-1-2 300GM SS SP RED 79 C WITH NRV | 1 | Nos | MIHIR_SAHOO1 | 90 |
| 3 | MS CONTAINER STRAP FOR MOUNTING AND FIXING THE AGENT CONTAINERS TO THE WALL | 2 | Nos | MIHIR_SAHOO1 | 90 |
| 4 | UL CONTAINER STRAP FOR MOUNTING AND FIXING THE AGENT CONTAINER TO THE WALL | 2 | Nos | MIHIR_SAHOO1 | 90 |
| 5 | VALVE ASSEMBLY AND ARRANGEMENT FOR SUPERVISORY SWITCH CONNECTION FOR MONITORING CYLINDER PRESSURE, A PRESSURE GAUGE WITH A SAFETY BURST DISC AND A SAFETY CAP 25 BAR | 1 | Nos | MIHIR_SAHOO1 | 90 |
| 6 | PRESSURE GAUGE CUM SWITCH FOR MONITORING THE CYLINDER PRESSURE 0-60 BAR, 22.50 BAR SWITCH POINT PRESSURE SWITCH WASCO SWITCH POINT 5BAR 72.5 PSIG IMP WITH FIRE EXT AUTOMATIC WM FK 5-1-12 4KG | 1 | Nos | MIHIR_SAHOO1 | 90 |
| 7 | HYDRO STATIC PRESSURE TEST 50 BAR, INVERTED BAKER TEST, HELIUM LEAK DETECTION TEST, EPOXY POWDER PAINTING, DISMANTLING, COMMISSIONING CHARGES | 1 | Nos | MIHIR_SAHOO1 | 90 |
| 8 | CONVENTIONAL OPTICAL SMOKE DETECTOR WITH DOUBLE DUST TRAP CHAMBER DESIGN, OPTIMIZED PERFORMANCE USING INTERNAL ALGORITHM, CENTRAL LED FOR 360 STATUS VISIBILITY, COMPILES TO EN 54-7 STANDARD | 1 | Nos | MIHIR_SAHOO1 | 90 |
| 9 | CONVENTIONAL RATE OF RISE HEAT DETECTOR, HEAT ALARM THRESHOLD TEMPERATURE 58 C CENTRAL LED FOR 360 STATUS VISIBILITY, COMPLIES TO EN 54-7 STANDARD AND APPROVED BY LPCB, VDS | 1 | Nos | MIHIR_SAHOO1 | 90 |
| 10 | INSTALLATION AND DELIVERY CHARGES | 1 | Job | MIHIR_SAHOO1 | 90 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
bid_8862036.pdf
GEM_BID
rfpsow_2026-01-20-16-15-16_59f6bd2b152bc075b58e6b512aa3b0b3.pdf
BOQ
boq_2026-01-20-16-15-16_45e33eecd418e896dc017f67ad045c61.csv
BOQ
RFPSOW_3bef9062-f883-4741-84321768906302519_MIHIR_SAHOO1.pdf
OTHER
list-of-categories-where-trials-are-allowed_1712126171.pdf
OTHER
gtc.pdf
OTHER
RFPSOW_3bef9062-f883-4741-84321768906302519_MIHIR_SAHOO1.pdf
GEM_OTHER • 1.00 MB
list-of-categories-where-trials-are-allowed_1712126171.pdf
GEM_OTHER • 0.52 MB
gtc.pdf
GEM_OTHER • 0.70 MB
Download all tender documents and submit your bid