Loading…
Loading…
Opening company profile
Loading company metrics, contact preview, and tender history.
Public records across all portals
No organisation data
Try another outcome or period.
No state data
Try another outcome or period.
REFILLING OF HFC 227EA GAS 1, 1, 2, 3, 3 HEPTA FLURO PROPANE, ZERO ODP, STORED PRESSURE, GAS, CONVENTIONAL GAS RELEASE PANEL WITH BATTERY BACKUP AND CROSS ZONING FACILITY 2-ZONE WITH FIRE EXT AUTOMATIC MINI INTUITIVE FK-5-1-2 300GM SS SP RED 79 C WITH NRV, MS CONTAINER STRAP FOR MOUNTING AND FIXING THE AGENT CONTAINERS TO THE WALL, UL CONTAINER STRAP FOR MOUNTING AND FIXING THE AGENT CONTAINER TO THE WALL, VALVE ASSEMBLY AND ARRANGEMENT FOR SUPERVISORY SWITCH CONNECTION FOR MONITORING CYLINDER PRESSURE, A PRESSURE GAUGE WITH A SAFETY BURST DISC AND A SAFETY CAP 25 BAR, PRESSURE GAUGE CUM SWITCH FOR MONITORING THE CYLINDER PRESSURE 0-60 BAR, 22.50 BAR SWITCH POINT PRESSURE SWITCH WASCO SWITCH POINT 5BAR 72.5 PSIG IMP WITH FIRE EXT AUTOMATIC WM FK 5-1-12 4KG, HYDRO STATIC PRESSURE TEST 50 BAR, INVERTED BAKER TEST, HELIUM LEAK DETECTION TEST, EPOXY POWDER PAINTING, DISMANTLING, COMMISSIONING CHARGES, CONVENTIONAL OPTICAL SMOKE DETECTOR WITH DOUBLE DUST TRAP CHAMBER DESIGN, OPTIMIZED PERFORMANCE USING INTERNAL ALGORITHM, CENTRAL LED FOR 360 STATUS VISIBILITY, COMPILES TO EN 54-7 STANDARD, CONVENTIONAL RATE OF RISE HEAT DETECTOR, HEAT ALARM THRESHOLD TEMPERATURE 58 C CENTRAL LED FOR 360 STATUS VISIBILITY, COMPLIES TO EN 54-7 STANDARD AND APPROVED BY LPCB, VDS, INSTALLATION AND DELIVERY CHARGES
REFILLING OF HFC 227EA GAS 1, 1, 2, 3, 3 HEPTA FLURO PROPANE, ZERO ODP, STORED PRESSURE, GAS, CONVENTIONAL GAS RELEASE PANEL WITH BATTERY BACKUP AND CROSS ZONING FACILITY 2-ZONE WITH FIRE EXT AUTOMATIC MINI INTUITIVE FK-5-1-2 300GM SS SP RED 79 C WITH NRV, MS CONTAINER STRAP FOR MOUNTING AND FIXING THE AGENT CONTAINERS TO THE WALL, UL CONTAINER STRAP FOR MOUNTING AND FIXING THE AGENT CONTAINER TO THE WALL, VALVE ASSEMBLY AND ARRANGEMENT FOR SUPERVISORY SWITCH CONNECTION FOR MONITORING CYLINDER PRESSURE, A PRESSURE GAUGE WITH A SAFETY BURST DISC AND A SAFETY CAP 25 BAR, PRESSURE GAUGE CUM SWITCH FOR MONITORING THE CYLINDER PRESSURE 0-60 BAR, 22.50 BAR SWITCH POINT PRESSURE SWITCH WASCO SWITCH POINT 5BAR 72.5 PSIG IMP WITH FIRE EXT AUTOMATIC WM FK 5-1-12 4KG, HYDRO STATIC PRESSURE TEST 50 BAR, INVERTED BAKER TEST, HELIUM LEAK DETECTION TEST, EPOXY POWDER PAINTING, DISMANTLING, COMMISSIONING CHARGES, CONVENTIONAL OPTICAL SMOKE DETECTOR WITH DOUBLE DUST TRAP CHAMBER DESIGN, OPTIMIZED PERFORMANCE USING INTERNAL ALGORITHM, CENTRAL LED FOR 360 STATUS VISIBILITY, COMPILES TO EN 54-7 STANDARD, CONVENTIONAL RATE OF RISE HEAT DETECTOR, HEAT ALARM THRESHOLD TEMPERATURE 58 C CENTRAL LED FOR 360 STATUS VISIBILITY, COMPLIES TO EN 54-7 STANDARD AND APPROVED BY LPCB, VDS, INSTALLATION AND DELIVERY CHARGES
1 more tender is hidden. Create a free account to unlock the full tender history, filters, and exports.
This profile is built from what portals disclose publicly. Since several states never release bidder lists or quoted prices, it likely understates the company’s true footprint. A tender is counted as won when the company either received the award or stood L1 at financial bid opening, even if the formal award is still pending. TenderKart compiles these public records independently and has no association with any government portal, buyer, or bidder.