Tender Value
Refer Docs
Closing Date
8 Jun 2020, 9:00 amClosed
Executive Engineer Dhule Irrigation Division Dhule
Executive Engineer Dhule Irrigation Division Dhule Sinchan Bhavan Sakri Road Dhule
Preparation of detailed report of Emergency Action Plan and Dam Break Analysis in all respect as per Dam Safety Manual Chapter-8, Technical circular of MERI Nasik No.DSO/PB-4/1582 dated 16/11/2015 and as per the latest government guidelines. (Exclud
2020_TIDC_580044_1
DID E Quotation No.1 for 2020-2021
Open Tender
Consultancy
Item Rate
90 days
Dhule
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
Exempted
11 Jun 2020
29 May 2020
9 Jun 2020
29 May 2020
8 Jun 2020
29 May 2020
Collection of data as described in below Sr. No. a & b, required for Preparing & submitting report of computerized Emergency Action Plan (EAP) and Dam break Analysis / Study in as per Dam Safety Manual Chapter-8, Technical circular of MERI Nasik No.DSO/PB-4/1582 dated 16/11/2015 & as per the latest government guidelines complete in all respect as directed by the Engineer in charge at all stages. (The data collection is excluding River Travers Survey Work & it's drawing i.e. crosses section & L-Section of river per Km. etc. Soft copy of all the Traverse Survey data & Traverse Survey drawings etc. will be provided separately by the department which are also needs to be printed as per the requirement and get it attached in the EAP Report, in all respect as directed by the Engineer in charge at all stages.) a) All the technical, non technical staff, Assistants, Labors & vehicle required to collect the following data. 1) Introductory. 2) Responsibilities. 3) Emergency procedures, probable damage of live stock or property in the flood affected area. 4) Preventive actions. 5) Preparing all the village/wadi/pada/industrial area's boundary wise detailed drawings required for EAP. 6) Appendices as prescribed Dam Safety Manual Chapter – 8.
b) Feeding above data to computer, taking print out for proof reading & then final print out on 75 GSM A4 paper form, taking & printing photographs, maps, drawing wherever necessary with attractive cover design, indexing, paging & binding etc. in minimum 100 pages or as per actual requirement. Report should be submitted with all the recorded computer data in hard copies & a soft copy on CD/pen drive i) Initial Hard Copy
ii) Additional Hard Copy
Follow up of the submitted EAP Report in the office of various Government authorities of Water Resources Department, Submission of remark Compliance, Arranging meetings, presentations (PPT) & getting approval/Obtaining Clearance to the EAP report from Competent Authority, consulting and lisioning charges etc. complete in all respect as directed by the Engineer in charge at all stages.
Ashish S Waghchaure
Chetak Engineers
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .