Tender Value
₹30 L
EMD Value
₹30,000
Closing Date
31 Aug 2026, 7:00 pm6d left
Executive Engineer
Erection of HT LT TC MVCC line & maintenance Work for various schemes under Bhuj Rural 2 sdn
338401
739/06
Open
Power/Energy Projects/Products/Services
Works
Kutch
9 documents required · 9 mandatory
₹1,475
PGVCL
₹30,000
24 Aug 2026
24 Aug 2026
24 Aug 2026
31 Aug 2026
24 Aug 2026
2 Estimated cost in Rs. 30,00,000/-
3 Tender Fee in Rs. ( non-refundable) with 18 % GST 1475/-
Payment through
4 Earnest Money Deposit amount in Rs. (1% RTGS / NEFT or by
of Tender Amount) DD
On line ( e-tendering ) tender/ Off line Tender offer submission
5 last Date 31.08.2026 up to 17:00 hours only (This is mandatory )
6 Date & Time for pre bid meeting ( If Required) ----
Date of opening of On Line/ Off line Technical Bid at Date
7 01.09.2026 @ 11:00 hours (if possible)
Date of on line opening of On Line / Off line Price bid, Date
8 01.09.2026 @ 12:00 hours (if possible)
9 Validity of Bid 120 Days
Executive Engineer
Sr. No. Particulars Page No.
1 Tender Details Table No 1
2 SECTION I: INSTRUCTIONS TO THE BIDDER
3 SECTION II: Schedule A
General Instructions to the successful bidder
TERMS & CONDITIONS REGARDING
INDUSTRIAL LAWS AND OTHER RELATED
6 SECTION V: TAXES
7 SECTION VI: General Terms & Conditions
Annexures I to XI, BG Formats for EMD and,
SD, Agreement and Indemnity Bond Formats
9 SECTION VIII Schedule B
10 SECTION IX Technical Specifications
11 SECTION X Drawings
GENERAL INFORMATIOS FOR BIDDERS
The "PGVCL" shall mean The Executive Engineer Bhuj Division,
PASCHIM GUJARAT VIJ COMPANY LTD., having its corporate office at Nanamava Main Road,
Laxminagar, Rajkot. With expression shall unless repugnant to the context include its permitted assigns
or successor / authorized representatives.
The "Contractor" / Successful Bidders shall mean the Bidders, whose tender has been accepted
by the PGVCL for award of the contract and shall include his authorized representatives.
The "Engineer-in-Charge" shall mean the authorized officer of the PGVCL to act as Engineer-
in-Charge to supervise the work – for the purpose of the contract.
The "Specification" shall mean the tender forming a part of the contract along with Performa,
schedules and drawings.
The "Order" shall mean the official letter issued by the PGVCL, informing the bidder that his tender
has been accepted.
The "Contract" shall mean the agreement to be entered into by the PGVCL with the
contractor and shall include the commercial technical and general conditions, schedules,
drawings and any other conditions specifically agreed between the parties forming a part of
The "EMD" shall mean Earnest Money Deposit.
The "Contract Value" shall mean the total amount indicated in the contract agreement as per
The "Contract Value" shall mean the total amount indicated in the contract agreement as per
order placed by the PGVCL and calculated from the quantities indicated in the tender.
The "Completion Period" shall mean the period starting from the date of issue of "Order" and
required to complete the work in all respect.
The "Work" shall mean activities to carry out for the entire scope of this Tender.
“Inspector” shall mean the any person nominated by PGVCL from time to time to inspect
the works under the contract and/or duly authorized representative of the PGVCL “Letter of
Award” shall mean the official notice issued by the PGVCL notifying the contractor that his
bid has been accepted.
“Date of Contract” Shall mean the date on which Letter of award has been issued.
“Month” shall mean the calendar month day or days unless herein otherwise expressly defined shall
mean calendar day or days of 24 hours each.
“A Week” shall men the continuous period of seven days.
HT means High Tension
Electricity Rules: - All the works shall be carried out in accordance with latest rules under
Electricity Act-
Testing: - After completion of work execution required Tests are to be taken in presence of
Engineer in Charge whenever required.
Sign & Stamp of the Bidder
Definition of “Similar work” for overhead network: Erection of overhead electric Network up to
voltage level 22 KV
Definition of “Similar work” for underground network: Laying of HT / LT Underground Power
cable network for Distribution system.
2 PRE QUALIFICATION CRITERIA / ELIGIBLE CRITERIA FOR BIDDERS
Bidders fulfilling eligibility criteria as mentioned in section 1 Sr. no.
2.2. and having experience of erection & maintenance of overhead HT/LT lines,
Transformers, underground cable work, along with satisfactory work completion
certificate regarding execution of work, including work order outward number
along with its value, from order issuing authority, for last 3 (three Years) _ ending
last day of month previous to the one in which tenders are invited., of any
DISCOM of GUVNL or any Govt. / Private DISCOM of any state of India. The
work executed through open / advertised tender shall only be considered for
experience of work. The work done through limited tender shall not be considered
for experience.
These bidders will be considered as an experience bidder.
Bidders fulfilling eligibility criteria as mentioned in section 1 Clause No.2 and sub
clause No. 2.2 and not possessing any experience of erection & maintenance of
overhead HT/LT lines, Transformers, underground cable work can also
participate in tender for erection & maintenance of overhead HT/LT lines,
Transformers, underground cable work. These bidders will be considered as an
Following scan copy of documents are mandatory for the Bidders to be uploaded in PDF form with
bid and no physical documents to be submitted.
• The copy of the tender duly signed, stamped with company’s seal must be submitted along with the bid. All annexure of
tender filled in & signed with the bid.
• Attested copy of GST Registration No.
• Tender Fees & E.M.D. original Demand Draft in favor of PGVCL, Division Office, Bhuj.(Single Envelop).
• Solvency certificate issued from Any Nationalized/Schedule Bank amounting of 05 % sum equivalent of estimated cost
not older than 01 year
• Group Insurance copy of the insurance policy of the insured laborer’s under W.C. Act. Attested copy of contractor
vendor registration copy.
Sign & Stamp of the Bidder
3 INSTRUCTIONS FOR e TENDERING (ON LINE TENDERING) TO BIDDERS
Bidders willing to participate in tender will have to get themselves registered on website
www.nprocure.com
Bidders willing to participate in tender should have valid digital certificate / Digital
Signature as per Information technology Act 2000 using which they can sign their
electronic bids. Bidders can also procure the same from (n) code solutions, a division
of GNFC Ltd., who are licensed certifying authority by Govt. of India.
Download tender Documents from PGVCL web site up to date shown in the tender
For details regarding digital certificate and related training the below mentioned address may
(n) Code Solution A division of GNFC, 403, GNFC Info Tower, Bodakdev, Ahmedabad
Bidders who already possess valid Digital certificate need not procure a new digital certificate.
Bidders can prepare and edit their offers number of times before tender submission date
and time as mentioned in this tender details table no1. After tender submission date
and time, bidder cannot edit their offer submitted in any case. No written or online
request in this regard shall be granted.
Bidder shall submit their offer, i.e. Technical Bid as well as price bid in Electronic format
on website www.nprocure.com before the validity period mentioned in tender
details Table no1.
Offers submitted without digitally signed will not be accepted.
Offers only in physical form will not be accepted in any case.
4 UNDERSTANDING AND CLEARIFICATIONS ON DOCUMENTS AND
All interested parties are requested to understand this Tender Document in detail in order
to comply with PGVCL’s requirements including but not limited to the Tender
fees, EMD and deadlines, selection criteria, selection methodology, scope of
work, and minimum technical standards.
The Bidder is required to carefully examine the specifications and documents and fully
inform himself as to all the conditions and matters which may in any way affect the Work
or the cost thereof. If any Bidder finds discrepancies or omissions in the specifications and
documents or is in doubt as to the true meaning of any part, he shall at once request in
writing in advance before filling in the tender, within the time limit as per Table no 1, for
an interpretation / clarification by the PGVCL Bhuj Division office. Date:
Sign & Stamp of the Bidder
Then The PGVCL Bhuj Division office will issue interpretation and
clarifications as he may think fit of such interpretations and clarifications, the
Bidder may submit his bid but within the time and date as specified in the Table
no1. All such interpretations and clarifications shall form a part of the
specifications and documents, and accompany the bidder's proposal. In case of
difference of opinion about interpretation of specification etc. the decision of
Executive Engineer, Bhuj Division will be final and shall be binding to the
Verbal clarifications and information given by the PGVCL or his employee(s) or his
representative(s) shall not in any way be binding on the PGVCL.
All interested parties requested to strictly abide by all terms prescribed in this RFP
Document and provide accurate information to the best of their knowledge
without misleading PGVCL to be considered for participation in this Project.
Bidders should be in touch with websites https://pgvcl.nprocure.com &www.pgvcl.com
for information regarding revision / corrigendum / Amendment in the Tender
Document till due date of online / off line submission and thereafter. No separate
information shall be sent in this regards and also not publish in newspaper.
5 TENDER FEES (Non Refundable & Non-transferable)
Existing rate of GST will be levied on following tender fees as per GST Rules in force during
this Tender Period.
The Tender fees is payable, as per following Table, between the dates mentioned in Table
no 1 , by cash & DD or Banker’s Cheque if total amount of Tender fees plus applicable
no 1 , by cash & DD or Banker’s Cheque if total amount of Tender fees plus applicable
GST is less than Rs 10,000/- or only by Demand Draft (DD), if the said amount is more
than Rs 10,000/, in favour of the Paschim Gujarat Vij Company Limited payable at
Nationalized /Scheduled banks
Sr. No. Tender Amount Tender Fees in Present rate of Total Tender
Above Rs 5,00,000/- up
The tender fees once paid for tender document will not be refunded under any
circumstances or not transferred to other bidder.
Sign & Stamp of the Bidder
The Tender Fees is Non-refundable under Normal Circumstances. However, if
purchaser Company decides to scrap/cancel the Tender, by one or another reason,
in which Bidders are not responsible for cancellation/scarp of Tender fee without
GST amount may be refunded to bidder(s), at sole discretion of the Purchaser
6 EARNEST MONEY DEPOSIT (EMD)
The EMD payable, between the dates mentioned in Table no 1, by cash if total amount of
The EMD payable, between the dates mentioned in Table no 1, by cash if total amount of
EMD is less than Rs 10,000/- or by RTGS/NEFT, Demand Draft (DD) or Banker’s
Cheque, if the said amount is more than Rs 10,000/-, in favour of the Paschim Gujarat
Vij Company Limited payable at Bhuj of any Nationalized /Scheduled banks or by
Bank guarantee from any Nationalized/Scheduled nationalized bank decided by
Government of Gujarat time to time only. The EMD Amount is 1 % of the Tender
Estimated Cost.
The money receipts of payment of Tender fees and EMD or DD or BG for tender fees &
EMD should be submitted in sealed cover & this cover shall be clearly marked “Tender
fees & EMD Cover for Tender no. ” along with the name and stamp of bidder.
The EMD of all unsuccessful bidders except that of the successful bidder will be returned
after the award of the contract.
EMD of the successful bidder to whom a contract is awarded will be returned after the said
bidder pays the security deposit and signs the contract agreement.
If the successful bidder fails to submit a Security Deposit within 15 days from the date of
LOA of the contract or fails to sign the contract agreement then the EMD amount will
be forfeited in favour of PGVCL without any notice or and action for “Stop deal” will
be initiated as decided by tender inviting authority
No interest will be payable by the PGVCL on the above Deposit.
EMD can be exempted as per Industries & Mines Department, GoG New Purchase Policy
Resolution No. SPO/1095/2636(97)/CH dated 23.09.1997 for Small and Micro Scale
In cases, where EMD need not to be paid, valid exemption Certificates duly notarized has
to be produced/attached in place of EMD documents as per the Tender Terms and
The Micro and Small Scale Industrial (manufacturing) Units registered under Small Scale
Industries of Gujarat State and holding subsequent registration with NSIC/DGS&D,
Registration Certificates for the item under Tender will be eligible for exemption from
payment of EMD on submission of attested copies of their SSI (SSI/ MSME Part-II) &
NSIC/DGS&D Registration Certificates and Udhyog Adhar Certificate/Memorandum
in EMD Cover. The Certificates should indicate the manufacture/service/works of
items/work offered. This benefit of exemption will not be admissible if they take part in
the tender indirectly either through their dealers, agents, distributors or other
Tenders submitted without Earnest Money Deposit by the firms, who are not eligible for any
exemption, will be rejected without entering in to further correspondence in this regard
and no reference will also be made.
Sign & Stamp of the Bidder
7 In case of On line Tenders
Technical & Commercial Bid cover:
Following documents are mandatory and to be in submitted on line through sealed
cover. This cover should be clearly marked “Technical & Commercial Bid Cover for
Tender no. ” along with the name and stamp of bidder
1 The copy of the tender duly signed, stamped with company’s seal must be
submitted along with the bid. All annexure of tender filled in & signed with
2 Attested copy of GST Registration No.
3 Tender Fees & E.M.D. original Demand Draft in favor of PGVCL,
Division Office, Bhuj.(Separate Envelop).
4 Solvency certificate issued from Any Nationalized/Schedule Bank amounting
of 20 % sum equivalent of estimated cost not older than 01 year.
5 Group Insurance copy of the insurance policy of the insured laborer’s under
6 Attested copy of contractor vendor registration copy.
Commercial / Price Bid:( In case of off line tenders)
The bidder must clearly quote their rates in Schedule – B of this tender, in percentage above than,
below than or equal to, the tender rate in figure as well as in words. The bidder should
specify whether the quoted rates are with or without prevailing taxes, if applicable, in
force at that time, The bidder must work out the total price of their tender offered
accordingly and the total amount should be clearly written in words & figure, in case
accordingly and the total amount should be clearly written in words & figure, in case
of any discrepancy whatever written in words shall prevail. Company shall at liberty to
decide the matter as it deem fit.
In case of non SOR rate, Item wise rate should be mentioned and item wise rate will be consider for
the lowest party.
Sign & Stamp of the Bidder
Further bidders, for “On line tenders”, are requested to submit price – bid on-line only and not
to submit the price bid in physical form. This is mandatory. If price bid is submitted in
physical form, same will not be opened and only on-line submitted price bid will be
considered for evaluation. In On Line price Bid, GST is to be mentioned in separate
PGVCL reserves the right to reject any OR all tenders without assigning any reasons
8 In case of Off line Tenders
Technical Bid cover
All the documents as specified in Section I Sr. 1to no. 6. are mandatory and to be in
submitted on line only through sealed cover. This cover should be clearly marked
“Technical Bid Cover for
” along with the name and stamp of bidder Commercial / Price Bid cover:
All the documents as per Section 1 Sr. No. 8.2.2 & 8.2.3 are mandatory and should be
submitted in sealed cover. This cover shall be clearly marked “Commercial Bid Cover
for Tender no. _” along with the name and stamp of bidder
The bidder must clearly quote their rates in Schedule – B, attached with this tender, in
percentage above than, below than or equal to, the tender rate in figure as well as in
words. The bidder should specify whether the quoted rates are with or without
prevailing taxes, if applicable, in force at that time, The bidder must work out the total
price of their tender offered accordingly and the total amount should be clearly written
price of their tender offered accordingly and the total amount should be clearly written
in words & figure, in case of any discrepancy whatever written in words shall prevail.
Company shall at liberty to decide the matter as it deem fit.
In case of non SOR rate, Item wise rate should be mentioned and item wise rate will be
consider for the lowest party.
No deviation in terms & condition in Schedule-B and Technical
Specification will be entertained. All the documents related to this Tender shall be final
and binding to all the bidders. Any ignorance for this shall not relieve the contractor
from their contractual liability arising as per Tender documents.
9. The works referred herein shall cover the entire scope of the Tender.
10. The issuance of bid document would not mean that the bidder has qualified for the
bidding. Hence bidders should ensure themselves of their credentials before
submitting their offer.
11. Executive Engineer, PGVCL, Bhuj Division reserves the right to spread the order if
12. Does not anticipate change in the PGVCL ownership during the proposed period of
Sign & Stamp of the Bidder
13. AMENDMENT TENDER
At any time prior to the deadline for submission of bids, as mentioned in Table1,
PGVCL may, for any reason, whether at its own initiative or in response to a
clarification requested by a respective bidder, modify the bidding documents by
The amendment will be notified, only on PGVCL Website & n-procure website in case
of on line tender, PGVCL will bear no responsibility or liability arising out of
noncompliance of the same in time or otherwise.
Such amendments, clarification etc. shall be binding on the bidders and will be given due
consideration by the bidders while they submit their bids and invariably enclose
such documents as a part of the bid.
14. SUBMISSION OF TENDERS
Follow all the instructions narrated this tender document for submission and no any
further communication in the matter will be entertained.
The Bidders must ensure that all the Annexures are completely filled in their
tenders and the information called for is given in totality. A set of complete
tender documents is required to be submitted duly signed and stamped by
authority competent to sign on behalf of bidder on each page as a token of
unconditional acceptance to the conditions of various clauses of tender
documents. The bidder's bid and the documents attached there to shall be
considered for forming part of the contract documents.
For “On Line Tenders”
Tender Papers & Specifications may be down-loaded from Web site
https://pgvcl.nprocure.com (For view, download and on line submission) and
PGVCL web site www.pgvcl.com (For view & down load only).
The bidder has to follow instruction given in this section point no 4 to 7. Both these
covers, as mentioned in this section point no 6.2, 7.11, should be submitted in
one main cover, this cover shall be clearly marked “EMD Cover, Technical
_Commercial bid covers for Tender no. ” along with the name of the Bidder and
• This main cover (Tender fee & EMD) must be submitted physically, within time
limit as mentioned in table no 1 Sr. No. 8, by registered Post A.D. or Speed
Post only , “NO COURIER SERVICE OR HAND DELIVERY” will be allowed,
to following address:
Executive Engineer,
PASCHIM GUJARAT VIJ COMPANY LTD.,
Power House Compound,
Hospital Road, Bhuj
• Price bids to be submitted ON LINE only before time limit specified in “Tender
Details” Table no1 of this document.
Sign & Stamp of the Bidder
For “Off Line Tenders”
Tender Papers & Specifications may be down-loaded from PGVCL web site www.pgvcl.com (For
view & down load only).
The bidder has to follow instruction given in this section point no 4 to
8. All these three covers, as mentioned in this section point no 6.2, 7.11,
,should be submitted in one main cover, this cover shall be clearly marked
“EMD Cover, Technical , Commercial bid covers for Tender no.
” along with the name of the Bidder and his address.
This main cover must be submitted physically, within time limit as mentioned in
table no1, by registered Post A.D. or Speed
Post only, “NO COURIER SERVICE OR HAND DELIVERY” will be
allowed, to following address:
Executive Engineer,
PASCHIM GUJARAT VIJ COMPANY LTD.,
Power House Compound, Hospital Road, Bhuj
15. REJECTION OF TENDER:
The Bidders is expected to examine all instructions, terms, conditions, schedules and
other details called for in this specification and keep himself fully informed about
all which may, in any way, affect the work, or cost thereof. The bidder should
sign on each page of tender documents , as mentioned in Section 1 point no. 2.15,
failure to furnish the required information or submission of tender not as per the
specification will be at the Bidders risk may result in rejection.
The offer is liable summarily rejected if it contains.
a) Deviation/Addition/Alternations/Omissions in bidding schedules.
b) Deviation and contradictions to the terms and conditions specified in this
If any bidders firm or/and partner or proprietary firm anywhere in companies (PGVCL,
UGVCL, MGVCL, GETCO, DGVCL, GSEC) under GUVNL are under criminal
investigation for any kind of fraud for public and theft of material or/and with
handlings the material and any civil and/or criminal case pending at any stage
than offer of such bidder /firm will be out rightly rejected.
Bids submitted after the time and date fixed for the receipt of bids as set out in the Table
no1, shall be rejected.
Any deviation found in Data/Details/Documents between online offer (e-tendering) and
physically submitted documents of bidder, offer of the same shall be liable for
rejection at the discretion of PGVCL.
The Bidders shall specifically note that any over writing or corrections or manuscript in
the bid shall be ignored and will not be considered authentic unless same are
signed with Bidder's Stamp/Seal as mentioned in Section 1 point no.
Conditional bids shall not be accepted.
Sign & Stamp of the Bidder
DELAYED AND LATE TENDERS:
No tender shall be accepted/opened, as mentioned in the Table no 1, in any case
which are received after due date and time of the receipt of tender irrespective
of delay due to postal services of any other reasons and company shall not
assume any responsibility for late receipt of tender. Any correspondence in the
matter will not be entertained.
16. LANGUAGE OF THE TENDER
All information in the bid shall be in English. Information in any other language shall be
accompanied by its translation in English. Failure to comply with this may disqualify a
bid. In the event of any discrepancy in meaning, the English language copy of all
documents shall govern.
17. SIGNATURE OF BIDDER
The bid must contain the name, residence, address and place of business of the person or
persons making the bid and must be signed and sealed by the bidder with his
usual signature. The name of all persons signing should also be typed or printed
below the signature.
Bids by corporation/ company must be signed with the legal name of the corporation/
company by the President, Managing Director or by the Secretary or other person
or persons authorized to bid on behalf of such corporation/ company in the matter.
A bid by a person who affixes to his signature the word 'President', 'Managing Director'
'Secretary', 'or other designation without disclosing his principal will be rejected.
Satisfactory evidence of authority of the person signing on behalf of the Bidder shall be
furnished with the bid.
The Bidder's name stated on the tender shall be exact legal name of the firm.
Erasures or other changes in the bid documents shall be over the initials of the person
signing the bid.
The bidder should sign, as described above, on each page of tender documents & then
they have to submit this tender documents.
18. PRICE BASIS CURRENCY AND PAYMENTS
Bidder shall indicate bid prices in Indian Rupees only.
19. EFFECT AND VALIDITY OF TENDER
The bid should be kept valid for a period of 120 DAYS from the date set for opening
of the technical bid.
20. EVALUATION AND COMPARISION OF TENDERS
Generally the qualifying price bids, Bid price shall mean the bid price quoted by each
bidder in his bid for the complete scope of works including all duties and Taxes, will
be evaluated by the PGVCL to ascertain the best and lowest evaluated bid in the interest
of the PGVCL, for the complete works covered under these specifications and
Sign & Stamp of the Bidder
21. ARITHMETICAL ERRORS
Arithmetical errors will be rectified on the following basis:
If there is a discrepancy between words and figures, the amount in words will prevail.
If there is discrepancy between the unit price and the total price which is obtained by
multiplying the unit price and quantity, or between sub-total and the total price, the unit
or sub-total price shall prevail, and the total price shall be corrected. In case of
discrepancy between sub-total price obtained by adding various prices in the schedule
and the sub-total price indicated for that particular schedule, the sub-total obtained by
addition of various arithmetically corrected prices would be considered for evaluation.
However, the PGVCL shall be entitled to award the contract at the lowest of the prices
arrived at from various schedules, identified for that purposes, in the bid proposal
If the bidder does not accept the correction of the errors as above, his bid will be
22. AWARD OF CONTRACT
Notification of award of contract will be made in writing to the successful bidder by the
The contract will be awarded to the best qualified and responsive bidder offering the lowest
evaluated bid in conformity with requirements of these specifications and documents
and PGVCL shall be the sole judge in this regard and subject to the provisions of these
instructions to bidders and other terms and conditions detailed out in these documents
and specifications. A responsive bid is one which accepts all terms and conditions of
these specifications and documents without any modifications.
PGVCL Reserves the right to award separate contract to two or more parties in line with the
terms and conditions specified in the specification.
23. ADDITIONAL DOCUMENTS:
At the time of evaluation of tender PGVCL Bhuj Division office may ask bidder to
submit required documents other than mentioned in section I Point no 2.2, if required.
24. COMPLETION PERIOD
The contractual period for execution of the work stated in Schedule – B of this Tender
consist 365 Days. The commencement date of Order shall be Date of issue of the Order.
Sign & Stamp of the Bidder
GENERAL INFORMATION ABOUT THE BIDDER
(To be completely filled by the bidder)
1. Name of the Bidder
2 Postal Address
4 e-mail address & URL
Type of Company Partnership/ Private
Attach Proof of Company Registration along Proprietorship/
5 with a copy of the Partnership Deed/ Article of Limited/ Public Limited
Association and Memorandum of
Name and designation of the representative of the
6 Bidder to whom all reference shall be made to
expedite technical co-ordination.
7 Office Address
Stores Address where materials issued by PGVCL 2)
Store Documents to be submitted (Rental/PGVCL)
10 Last store visit: Date / By
11 Material register & Site register
12 Office Telephone/Fax no.
13 Office e-mail address
14 Permanent Account Number(PAN),
17 Labour License No.
18 Insurance Policy No. and for nos. of Nos. of Insured this
Labours in the name of bidder Labours policy
Insurance Policy No. and for amount for material in Amount Insured in this policy
the name of bidder
20 Solvency Certificate No.
21 Adhar Card No.(Optional)
It is certified that the information provided above is true to the best of my knowledge and belief. If any information
found to be concealed, suppressed or incorrect at later date, our tender shall be liable to rejected and our company
debarred from executing any business with PGVCL.
Sign & Stamp of the Bidder
1.0 For Underground Cable
1. Bidder has to maintain the records of allotted Cable Drum with actual Cable/Conductor
length. Cable length must be measured before laying. Cable joints are to be done as per
requirement only and length of cable must be utilized accordingly.
2. Cable is to be laid in Trench as per instructions of Engineer-in-Charge.
3. The trench excavation and filling–in shall be so executed that all walls, roads, sewers,
drains, pipes, cables, structures, places and things shall be reasonably secured against risk
of injury and shall be carried out to the satisfaction of the authorities concerned. However,
if any, damages to existing services made, Contractor shall arrange and pay for any
necessary repair, to make good the damages.
4. When the excavation of the trenches has been accurately executed, the contractor shall
inform engineer in-charge for approval. Lying of cables shall not be started until engineer
in-charge approves the trench.
5. All the related material for laying the cable in trench i.e. Half round RCC Pipes having
_both sides smooth surfaces, 25.4 mm thick, 152.4 mm inner diameter, 1000 mm long and
well cured and good quality; Sand from river bed, HDPE Pipes, GI Pipes and sundries
material if any (As per Schedule B) are to be supplied by Bidder at his own Cost. All such
material must be approved from concerned Engineer-in-charge before utilization and it
must be ISI marked where ever applicable.
6. Cable laying work must be executed as per prescribed in Schedule B. sand filling in
Trench must be done as mentioned in Schedule B. Megger test of Cable must be taken in
presence of Engineer-in-charge before laying and Bidder has to maintain separate Records
duly signed by Engineer-in-Charge for each results. After laying the Cable in trench it is
to be covered with half round pipe of RCC as prescribed in Schedule B and approved
sample. Each Half round Pipe must be marked with “PGVCL” with solid Red Colour on
7. Proper methodology of laying is to be adopted by the Bidder. Bidder has to lay Cable in
the stretch on small pulleys kept in the Trench so that it can be prevented from any
scratches on Cable. Drum must be fixed on Drum Machine while stretching and to be kept
on one end of Trench for smooth laying.
8. After completion of laying as above, remaining trench must be filled with sand. Leveling
with Road is to be done after complete sand filling. No any stones or any other debris are
to be utilized in filling of Trench. The contractor shall dispose of surplus material at his
9. A pre-warning PVC yellow tape 8-Inch wide and 300 microns thick (LDPE) shall also be
laid. The warning tape shall be printed in RED letter (IN ENGLISH AS WELL AS
GUJARATI) as “CAUTION: 11000 VOLTS PGVCL CABLE” and to be placed at about
300 mm To 450 mm depth from ground level along the route of cable.
Sign & Stamp of the Bidder
10. Trench route is to be made as per instructions of concerned Engineer-in- Charge and then
laying of cable in this trench accordingly.
11. Cable Laying with Mechanical Boring across the Road without disturbing the asphalt is
to be done instructions of concerned Engineer-in-Charge with prior approval and work is
to be executed as per Specifications in Schedule B only.
12. For Cable kit Make (Brand) Bidder has to submit any NABL accredited Lab Type test
certificate not older than Seven years and as per relevant IS 13573:2011 with latest
amendment if any along with sample before installation of cable kit at concern Division
office. GTP is to be submitted with Technical Bid.
13. If any Hard Rock area is encountered during the digging of Trench, Bidder must have all
the modernized equipment i.e. Erath Cracker JCB etc. to execute the required Trench.
Such area must be certified by a formation of Committee at Division Level headed by
Executive Engineer and to be executed in presence of Engineer-in Charge.
IS 1255-1983 is to be followed for the depth of trench in such area.
14. Route Markers are to be installed at every 100 Meters length as per specifications in
Schedule B The marker should incorporate the following relevant information:
1) The name of the Company – PGVCL.
2) Voltage – 11 KV Cable
3) Distance of cable from the marker
The interval should be maximum 50/100 meters (As per EIC instructions and
requirements) between two markers. It shall also be put at bends, curves, road crossing,
Cable Joints etc. of cable route as per requirement over and above specified distance.
15. Empty Drums are to be credited at PGVCL respective stores at Bidders cost and Risk after
successful completion and Execution of work. Otherwise Recovery will be proposed as
per Section V Clause No.
16. After Laying of Cable in Trench and filling of all type Cable Box and Joints, testing must
be carried out with help of Voltage Surge Testing Kit as per IE Act by applying 22 KV
for continuous Five Minutes and Cable must hold the satisfactory Results. Bidder must
have such testing facility. Following Pre commissioned Tests are also to be carried out.
a) Insulation Resistance of each cable drum length after laying and before jointing.
b) Before laying of cable, tests for detection of damage to outer sheath, if any.
c) After laying each cable with end termination shall withstand a voltage of 10 KV DC
for one minute between each phase to phase & phase to cable earth.
d) Test for 5 min. with system voltage applied between the conductor and the screen.
e) Continuity & Phase confirmation
Sign & Stamp of the Bidder
17. During the Execution if any deficit found in allotted material OR in case of any theft of
PGVCL allotted material, then PGVCL will recover the cost of such material from Bidder
as per the prevailing Market Rates
18. No any Advance Payment will be made after issuing of Order.
19. PGVCL will be not responsible and liable for the material supplied by the Bidder.
20. During Execution of work for Trench and Cable Laying authorized representative of
Bidder who is in knowledge of Engineer-in-Charge must remain present.
21. Bidder must have to submit the List of all related Equipment and Testing facility necessary
for the Tendered work while quoting the Bid.
22. PGVCL reserves the right to change/modify/alter/addition in condition in case of any
dispute and holds the power to decide the final verdict.
23. GST and cess as applicable as per prevailing rates are applicable to Bidder for this work.
24. In case of any Disputes, Superintending Engineer of Concerned area is the final Authority
to take any Decision.
25. Work may be required to be executed in any 66/132/220KV Sub-Stations also.
26. Necessary shutdown for connection/jumper of UG cable with existing network will be
provided as per availability or convenience of the PGVCL which shall be acceptable to
the contractor & contractor shall try to complete the work in minimum time.
27. All the sundries material like Clamps, Screws, nuts, bolts, nails etc. is at Contractor’s cost.
28. Work is to be performed as per Drawing No. PGVCL/Tech/UG cable/01/14-15 and
PGVCL/Tech/UG cable/02/14-15 are attached in Section XI.
For Overhead Line
1. Bidder has to maintain the records of allotted Conductor Drum with actual Conductor
length. Conductor length must be measured before Stringing.
2. E/o Poles must be according to RE Standards. Pole Pit, stringing installation of Fabrication
must be done as per standards and esthetically.
3. Earthing of Poles and Transformers must be as per Drawings and RE Standards. The Coal
and Salt composition must be followed as per rules. The Earth Pit must be kept at a
distance mentioned in Standard form the Pole. Earth Pit must be as per Drawing.
4. Concreting of Poles/Guys are to be carried out as per site situation and as per instructions
of Engineer –In-Charge.
5. Construction of Transformer Structure must be as per standard with all required
accessories like LA, Box and Fuse etc. 6. Delta Type Three Earthing are compulsory for
each Transformer Centre.
Sign & Stamp of the Bidder
7. All the jumpers at Shackle Points/DP Structures must be of “D” Type only.
8. Wherever required, Guarding as per standard must be done.
9. Pole Concreting: Whenever concreting of poles (PSC/RSJ) required, subdivision officers
has to submit the proposal to the division office with all justification before
commencement of work. Committee of Executive Engineer, DE Tech of Division office
has to verify the submitted proposal and decide whether concreting is required or not.
After the approval of committee work of concreting should be process as per
specification attached herewith.
10. Bidder must have records of each work carried out with every material inventory and
account thereof issued to him.
11. Bidder must have the well-drawn sketch of each work and to be submitted with Inventory
sheet within 15 Days of work completion.
12. All the fabricated material and Girder Poles must be painted with Coats of Silver Oxide
and without this work, work completion will not be accepted.
13. Pole Numbering must be completed within week time as per Engineer-in- Charge
14. Bidder must have proper pole accounting for the work carried out by him. He must have
the location details from where the poles are lifted and where these poles are utilized for
each work. A separate Register is to be maintained by him and details are required to be
submitted with Inventory and Sketch submission.
15. Necessary shutdown for connection/jumper of newly erected line with existing network
will be provided as per availability or convenience of the PGVCL which shall be
acceptable to the contractor & contractor shall try to complete the work in minimum
16. Successful Bidder must have ensured for that the safety Gadgets are issued to his Labour,
by him, and required regulations of Safety will be followed while carrying out the line
17. The Work for the erection of of Poles, Guys, Earthing, Transformer and Concreting,
Stringing and Guarding must be done as per attached Specifications and Drawings.
18. The material which is dismantled from site during the execution of work must be credited
to respective Divisional stores immediately after completion of work with complete
inventory and measurement details and length to weigh conversion calculations.
19. Any violation of Electricity Act 2003 Section No. 136 & 137, necessary action will be
initiated against the Contractor
20. In case of any Disputes, Superintending Engineer of Concerned area is the final
Authority to take any Decision.
Sign & Stamp of the Bidder
General Instructions to the successful bidders
1. Letter of Intent (LOI) / Letter of Acceptance (LOA) shall be issued to the successful Bidders
indicating the quantity allocated to them and the security deposit amount to be deposited by
them with PGVCL. Short listed Bidders will be required to deposit the requisite security
deposit within 15 days from issuance of LOI / LOA.
2. Security Deposit:
Security deposit will be accepted in Cash if the amount is less than Rs. 10000.00 and, if the
amount is more than Rs. 10000.00 then will be payable by Demand Draft (DD) OR
Banker’s Cheque OR Bank Guarantee (BG) from Nationalized / Scheduled Banks as
per Govt. GR No. EMD / 10 / 2014 / 570 /
DMO dated 01.04.15 will be acceptable. DD should be drawn on any
Nationalized /Scheduled banks in favour of Paschim Gujarat Vij Company
Ltd. payable at Bhuj or by Bank guarantee from any
Nationalized/Scheduled nationalized bank decided by Government of Gujarat time to
time only. Cheque will not be acceptable
The successful Bidders will be required to deposit the requisite security deposit within
days from the date of issuance of LOA of an amount equivalent to 5 % of the value of
the work to be allotted to him and as mentioned in LOA.
In case, if the Bank Guarantee is furnished / submitted, it should have a clear one time
validity till the completion of awarded work of this work order. Bank Guarantee for
interim period will not be allowed. Security Deposit shall be suitably extended time to
time as per requirement.
If by any reasons the completion period of this work order is extended, then supplier should
undertake to renew the Bank Guarantee at least one month before the expiry of the
validity failing which PGVCL will be at liberty to encase the same. CORPORATE
GUARANTEES NOT ALLOWED.
No interest will be paid on the Security Deposit.
In the event of awarding the order of additional quantity, the successful Bidders will be
required to deposit additional Security Deposit on prorate basis within two weeks of
the issuance of LOA for the additional order quantity.
In the event of failure to carry out work offered by successful Bidders and as accepted by
them while receiving the order within given time period, will lead to forfeiture of the Security
Deposit up to 100% and will lead to disqualification of the bidder to transaction business
with PGVCL for at least TWO years or the time duration as may be decided by the Managing
Director, PGVCL. Security deposit will be returned on after completion of awarded work.
Sign & Stamp of the Bidder
If the successful Bidders fails to pay security deposit within given time limit then the letter
of intent will stand cancelled. EMD amount will be forfeited in favour of PGVCL
without any notice or and action for “Stop deal” will be initiated as decided by tender
inviting authority.
3. SIGNING AGREEMENT
The successful Bidders will have to sign an agreement, within 15 days from the receipt of
LOI/LOA, on Stamp Paper of Rs 100/-as per Company’s rules in the prescribed form of
the P.G.V.C.L. attached with this Tender. The cost Rs.100.00 of the Stamp Paper will
have to be borne by the successful Bidders.
4. For the Tendered work, other than turnkey work, entire material will be issued by PGVCL.
Any other related material required to carry out work mentioned in Schedule A is to be
brought by Bidder. No any extra cost will be paid towards such material.
5. Successful Bidder has to follow all the rules and Regulations of Work Safety. Required
tools and Tackles for Safety are to be arranged by Bidder only.
6. Bidder is responsible to any type theft/damages of Company’s material and also
responsible to any type damages to any property and any kind fatal/non- fatal accidents to
anybody during the execution of work. Insurance of all workers is compulsory, who are
involved in Execution of Tendered work. There will be no any financial liabilities of
PGVCL for damage charges paid such way. Copy of valid Labour Insurance Policy in the
name of bidder is to be submitted with Tender Documents.
7. Rules and Regulations of PGVCL Works and Contracts Book are abided to Bidder.
8. Work must be completed in in specified Schedule narrated in the Tender. If concerned
Engineer not satisfied with quality of work, no any Time limit extension will be granted
and Penalty with applicable GST with cess as applicable and other taxes in force at that
time will be levied on delayed portion of work.
9. Agreement must be executed within 15 (Fifteen) Days from the date of issue of LOA.
Security Deposit (In form of DD/BG) and Insurance Policy is also to be submitted with
Agreement within this time limit i.e. 15 (Fifteen) Days.
10. Remaining material is to be credited at Respective Stores of PGVCL within a month after
completion of work.
11. Agreement and Indemnity Bond is to be executed on Rs. 100/- Stamp Paper and cost of
stamp paper is to be borne by Bidder. Solvency Certificate is to be submitted as per
PGVCL rules and Tender Condition.
12. Bidder is solely responsible for the material supplied by PGVCL.
13. Coal and Salt are to be brought by Bidder at his own expenses, for earthing work, and
work to be done as per PGVCL rules and RE specification for this work.
14. Work is to be carried out in presence of PGVCL authorized representative and to be duly
certified also.
15. No idle Labour charges will be paid by the PGVCL in case such occasion of idle Labour
arises, due to want of any materials or any other situations.
16. PGVCL have full rights to accept or reject the offer received against the Tender.
Sign & Stamp of the Bidder
17. Bidder has to submit the Performance Certificates under whom the similar kind of Tender
work has been executed. Such Certificates must not older than 3 Years from Date of
submission of the Bid. Such Certificate must be duly signed by Cadre Executive Engineers
and above only.
Sign & Stamp of the Bidder
TERMS & CONDITIONS REGARDING INDUSTRIAL LAWS AND OTHER RELATED
1. COMPLIANCES WITH LAW:
The Contract shall in all respects be interpreted in accordance with the laws in force in
India, including any such laws passed or made or coming into force during the period of
2. Wages to be paid at the time of payment etc.by the contractor
The successful bidder shall pay minimum prevailing rates per day, as may be specified here
after, or rates fixed under the Minimum Wages Act, whichever is higher. The wages of
every contract labour employed by him under this contract shall be paid by him before
the expiry of 7th day of the month irrespective of which the wages are payable i.e. wages
of a last month have to be paid by him in the first week of the next month). The contractor
shall have to make wages to his workers through bank only. The agency shall have to
submit the copy of a letter given to the Bank advising for crediting wages in individual
account of the workmen along with photocopy of the cheque showing total payment to be
made to all such workmen whose accounts are operated in that branch. (If there is more
than one Branch, the agency will have to submit separately for each branch.)
The successful bidder shall give his telephone number and address to the company so that
in case of labour trouble etc. the contractor can be contacted. The contractor shall
arrange to have his office outside the factory premises and the contractor shall keep
himself present through the work hours.
3. Persons below the age of 18 years shall not be deployed for the said work.
4. No female worker shall be employed in the night shift between 07.00 p.m. to 6.00 am.
5. Identity cards as prescribed under the factories Act/Shops and establishment Act (As the
case may be applicable) with Photo affixed thereto, for identification.
6. The successful bidder shall maintain a valid Labour license under the contract labour
(regulation and abolition) Act for employing necessary manpower required by them. In
absence of such license, the contract shall be liable to be terminated without assigning any
reason thereof.
7. The successful bidder shall at his own expenses comply with all labour laws and keep the
PGVCL indemnified in respect thereof. Some of the major liabilities under various labour
and industrial laws which the Contractor shall comply with below conditions.
Payment of contribution by way of employer's contribution towards provident fund,
administrative charges etc. at the rates made applicable from time to time by the
Government of India / Government of Gujarat or other statutory authority.
Payment of deposit in respect of each contract labour at the prevailing rate with the office
of the commissioner of labour as per the Contract Labour (Regulation and abolition)
License fee as prescribed under the contract labour (Regulation and abolition) Act rules
framed there under depending upon the number of workmen.
Sign & Stamp of the Bidder
Paid leave facility and wages as per the provision of the Factories Act at the rate of one day
for every 20 days of working.
Payment of retrenchment compensation, Notice pay and other liabilities as per industrial
Dispute Act. Any payment to the Contractor's employee arising out of any claim of
disputes under the Industrial Dispute Act 1947 or any other labour Laws.
Payment of compensation in case of accidental death or injury as per Employee's compensation
Maternity leave as per the provisions of the Maternity Benefit Act.
In case, PGVCL becomes liable to pay any wages or dues to any manpower deployed or any
government Contractor under any of the provisions of the Minimum wages act,
Payments of wages Act, Employee's compensation Act, Contract Labour regulation
abolition Act, Employee provident fund or any other law due to act of omission of the
Contractor, the PGVCL may make such payment and shall recover the same from the
successful bidder's Bill.
If the PGVCL is caused to pay under any law as a principal employer such amount as may
be necessary to cause of observe, or for non-observance of the provisions stipulated in
the notifications/byelaws/Acts/Rules/Regulations/ including amendments. If any, on
the part of the Contractor, the PGVCL shall have the right to deduct any money due to
the successful bidder under this contract or any other contract with the PGVCL
including his amount of security deposit for adjusting the payment. The PGVCL shall
also have right to recover from the Contractor any sum required or estimated to be
required for making good the loss or damage suffered by the PGVCL.
8. Employee's compensation fund and employer's liability insurance: - The successful bidder
shall cover all his employees under employee's compensation fund and under the liabilities
insurance. The Contractor will arrange insurance policies for arranging payment to his staff
injured / met with accident (Fatal / nonfatal) on duty of sufficient amount as per Labour
laws. In case of any such happening Contractor will be liable for any other payment to
workers / staff engaged as per existing rules. Contractor will not make any such payment
to the Contractor's staff or any compensation etc. during the pendency of the contract.
9. Following Salient features of some major laws are applicable to establishments engaged.
Employee PF and Misc. Provision Act
Payment of Gratuity Act
Maternity Benefit Act
Equal Remuneration Act
Payment of Bonus Act
Industrial Dispute Act
Industrial Employment (Standing orders) Act
Trade Union Act
Employees compensation Act
Contract Labour (Regulation and abolition) Act
Child Labour (Prohibition and regulation) Act
Inter-state migrant workmen's (Regulation of Employment and
conditions of service ) Act
Minimum wages Act
Payment of Wages Act
Factories Act 1948 Date:
Sign & Stamp of the Bidder
Shops and Est. Act
The Employees’ State Insurance Act and the scheme ,
The above are some of the major liabilities of the Contractor in addition to other
liabilities prescribed under the various labour laws, in force from time to time,
from statutory authorities like GOI-GOG, which the Contractor shall have to
10. It should be ensured that before commencing the said work, the successful bidder should
submit the details of their labourer such as a full name, address and age with proof and
subsequently changes of workers details are submitted accordingly.
11. The successful bidder shall employ adequate number of an experienced staff at site for daily
supervision and for maintenance of various register and records required under the law and
contract. No payment for supervision shall be admissible.
12. PGVCL does not accept any responsibility as Factory Act, Minimum Wages Act,
Workmen’s Compensation Act, Insurance Rules etc. or any other act, rules or regulations
that have to be observed by the contractor for carrying out the work.
13. The contract will be governed by the company as per works terms & conditions of the
14. EMPLOYMENT OF LABOUR:
Persons below the age of 18 years shall not be employed for the work. No female
worker shall be employed in the night shift between 07.00 p.m. and 06.00 a.m. next
Contractor shall maintain a valid labour license under the Contract Labour (Regulation
and abolition) Act for employing necessary manpower required by him. In the absence
of such a license, the contract shall be liable to be terminated without assigning any
reason thereof. Contractor should also employ qualified and experiences persons as per
requirement of Electricity Act and rules for carrying out supply and erection work
under this contract.
In case PGVCL becomes liable to pay any wages or dues to labour or any Government
agency under any of the provisions of the Minimum Wages Act, Payment of Wages
Act, Employee Compensation Act, Contract Labour Regulation Abolition Act,
Employee Provident Fund or any other law due to act of omission of the Contractor,
PGVCL may make such payment and shall recover the same from the Contractor’s
15. PROVIDENT FUND AND FAMILY PENSION SCHEME
The Contractor shall submit along with his bills (month wise) a Statement regarding
deduction against employees Provident Fund and Family Pension Scheme in respect of
each concerned employee The contractor's contribution and the workers’ contribution
towards Provident Fund and Family Pension Scheme shall be done at the rate made
applicable by the Government from time to time and deposited by the contractor with
Regional Provident Fund Commissioner, Rajkot.
Sign & Stamp of the Bidder
16. DEPOSIT LINKED INSURANCE SCHEME
The contractor shall have to deposit 1.2% of the wages in respect of employees who
are members of the Provident Fund as the contribution to the Deposit Linked Insurance
Scheme with Regional Provident Fund Commissioner, Rajkot.
17. ADMINISTRATIVE CHARGES
Administrative charges for maintaining Provident Fund Account shall be deposited by
the Contractor with Regional Provident Fund Commissioner, Rajkot at the rates
18. PAID LEAVE FACILITY
Paid Leave Facility at the rate of one day for every twenty days worked by the Contract
Labour shall be provided by the Contractor to his, workers. He shall maintain Leave
Records, Leave Cards for individual labourer which shall be duly verified, approved
and certified by the Authorized Officer of PGVCL. Remuneration for such leave period
shall be fully borne by the Contractor.
19. Workmen’s Compensation and Employer’s Liability Insurance
Insurance shall be affected for all the Contractor's employees engaged in the
performance of this contract.
20. Wages to be Paid & Time of Payment etc. by the Contractor
The Contractor shall pay minimum wages per day to his Labours/ Workers as per rates fixed
under the Minimum Wages Act. The wages of every Contract Labour employed by him
under this contract shall also be paid by him before the expiry of 7th day from the last
day of the month in respect of which the wages are payable (i.e. wages of a month have
to be paid by him in the first week of the next month).
Any default will result in cancellation of contact forthwith or else the Contractor shall be
punishable to the extent of Rs. 100/- for each day of default.
The Contractor shall give his Addresses, Telephone Number and etc. to PGVCL, so that, in
case of labour trouble etc. the Contractor can be contacted. The Contractor shall arrange
to have his office within working area and the contractor keep himself present
throughout the working hours.
The separate P.F. code issued from RPFC is required to be taken by the contractor and if it is
not taken, offer of the firm will not be considered. The attested documentary evidence
to be submitted along with the offer.
The contractors who are having separate P.F. Code No. from RPFC, it should be ensured that
all the contract labourers are covered under the provident fund scheme and employees’
pension scheme and their contributions are remitted regularly to the concerned RPFC.
The photo copies of the Chelan in this regard should be collected from the concerned
contractor and kept in the file of the concern contractor.
Sign & Stamp of the Bidder
The Bidder’s insurance liabilities pertaining to the scope of Works are detailed out in
Clauses titled Insurance Bidder’s attention is specifically invited to these clauses. Bid
price shall include all the costs in fulfilling all the insurance liabilities under the Contract.
28.1 The Contractor at his cost shall arrange, secure and maintain all insurance as may
be pertinent to the Works and obligatory in terms of law to protect his interest and
interests of the PGVCL against all perils detailed herein. The form and the limit of such
insurance as defined herein together with the under-writer in each case shall be
acceptable to the PGVCL. However, irrespective of such acceptance, the responsibility
to maintain adequate insurance coverage at all time during the period of Contract shall
be of Contractor alone. The Contractor’s failure in this regard shall not relieve him of
any of his contractual responsibilities and obligations. The insurance covers to be taken
by the Contractor shall be in the name of the Contractor. The Contractor shall, however,
be authorized to deal directly with Insurance Company or Companies and shall be
responsible in regard to maintenance of all insurance covers. Further the insurance
should be in freely convertible currency.
23. Any loss or damage to the equipment during handling, transportation, storage, erection,
putting in to satisfactory operation and all activities to be performed till the successful
completion of commissioning of the equipment shall be to the account of the
Contractor. The Contractor shall be responsible for preference of all claims and make
good the damages or loss by way of repairs and/or replacement of the equipment,
damaged or lost. The transfer of title shall not in any way relieve the Contractor of the
above responsibilities during the period of Contract. The Contractor shall provide the
PGVCL with copy of all insurance policies and documents taken out by him in
pursuance of the Contract. Such copies of documents shall be submitted to the PGVCL
immediately after such insurance coverage. The Contractor shall also inform the
PGVCL in writing at least sixty (60) days in advance regarding the expiry/cancellation
and/or change in any of such documents and ensure revalidation, renewal etc., as may
be necessary well in time.
24. The perils required to be covered under the insurance shall include, but not be limited
to fire and allied risks, miscellaneous accidents (erection risks) workman compensation
risks, loss or damage in transit, theft, pilferage, earth quake, riot and strikes and
malicious damages, civil commotion, weather conditions, accidents of all kinds, etc.
The scope of such insurance shall be adequate to cover the replacement/reinstatement
cost of the equipment for all risks up to and including delivery of goods and other costs
till the equipment is delivered at Site. The insurance policies to be taken should be on
replacement value basis and/or incorporating escalation clause. Notwithstanding the
extent of insurance cover and the amount of claim available from the underwriters, the
Contractor shall be liable to make good the full replacement/rectification value of all
equipment/materials and to ensure their availability as per project requirements.
Sign & Stamp of the Bidder
25. All costs on account of insurance liabilities covered under the Contract will be on
Contractor’s account and will be included in Contract Price, However, the PGVCL may
from time to time, during the pendency of the Contract, ask the Contractor in writing
to limit the insurance coverage, risks and in such a case, the parties to the Contract will
agree for a mutual settlement, for reduction in Contract price to the extent of reduced
premium amount. The Contractor, while arranging the insurance shall ensure to obtain
all discounts on premium which may be available for higher volume or for reason of
financing arrangement of the project.
26. The clause entitled ‘Insurance’ covers the additional insurance requirements for the
portion of the works to be performed at the Site.
27. The successful bidder will not be allowed to work after working hours except in special
28. The successful bidder has to engage required strength of skilled persons for execution
of work and proper supervisor to avoid complication and unnecessary delay to
complete work timely. The successful bidder will be solely responsible for labour
claims arising out of the labour employed for this job.
29. The successful bidder should furnish details of past experience of such job of similar
nature completed by him satisfactorily within the time limit in PGVCL will be
30. The successful bidder will be abide by and fulfil all the terms and provisions of the
“Tender and contract” for works as applicable and in case of any default there to the
PGVCL Company shall forfeit the S.D. or any other action as may be decided by
Executive Engineer Bhuj Division.
31. The successful bidder will certify that he has complied with the provisions of Industrial
& Labour Laws including PF Act, ESI Act etc. as may be applicable. Copy of challans
of PF related to be submitted along with bill.
32. The successful bidder will governed by the PGVCL general conditions of works
contract. The Booklet will be available in the concerned office in any working days. In
the event of placing order, the successful bidder will be bound to the terms & conditions
of the booklet. All the usual terms and conditions of the Company though the same
might have not been mentioned in this specification or contractor booklet will
applicable to this contract, and the decision of the Executive Engineer,Bhuj Division
shall be binding on the Contractor.
Sign & Stamp of the Bidder
TAXES and Duties: GST
1. The prices are excluding GST and Cess as applicable which will be paid extra on a given
taxable goods and/or services. The amount and % of GST and Cess as applicable should
clearly be indicated separately. (GST/Cess means all applicable Tax/Cess under GST Laws.
2. GST Laws means IGST Act, GST (Compensation to the State for Loss of Revenue) Act,
CGST Act, UTGST Act and SGSCT Act, 2017 and all related ancillary legislations).
3. The offers having price INCLUSIVE OF GST and Cess is likely to be rejected if the rate of
GST and Cess is not mentioned clearly unless the bidder has opted for Composition Scheme
under GST Act, which should be clearly indicated in the price bid. COMPANY may at its
discretion consider such offer with presumption of highest applicable rate of
VAT/GST/Cess prevailing when the price quoted is inclusive of GST and Cess.
4. If the Contractor has opted for the Composition scheme of GST, the same must be clearly
specified with valid Declaration & Certificate from Department. In the event of
withdrawal/cessation of the Supplier from Composition scheme during the tenure of the
contract, the rate mentioned in the price bid shall be final and any additional GST will have
to be borne by the tenderer. In no case additional amount towards tax or otherwise will be
paid / reimbursed to supplier/contractor. Further Statutory Variation clause will not be
applicable in case of Supplier / Contractor has opted for Composition Scheme under GST.
5. Contractor should charge GST in Invoice at the rate as agreed to/mentioned in acceptance
of tender only and any deviation in the same shall not be accepted. Further, any additional
liability of GST (later on due to wrong mentioning of GST rate, mis-interpretation of
HSN/SAC Code, etc.) over and above as charged in the invoice shall be borne by the
Supplier/Contractor. However, any refund received by the supplier / contractor on account
of GST charged from the company; such refund shall have to be passed on to the company,
along with interest if any. Such refund along with interest needs to be passed on suo-moto
by the contractor.
6. Further, the Company has a right to recover the amount of GST along with penal interest
at the rate of 15% per annum if GST charged is not paid/short paid to the government or
fail to upload the details or uploads inaccurate particulars on GSTIN portal by the Supplier
/ Contractor within the stipulated time limit.
In case, Govt. revises the rate of GST rate / Code during the tenure of the contract, the
provision of GUVNL’s statutory variation clause shall apply.
Sign & Stamp of the Bidder
7. INPUT TAX CREDIT BENEFIT
In the event of any statutory increase in the rate of Input Tax Credit and / or due to inclusion
of any other additional item of their inputs / input services under the ambit of the Input Tax
Credit provisions under the GST Act, subsequent to the date of submission of the offer, the
same should be passed on to COMPANY and you should inform such changes to
COMPANY from time to time. PGVCL’s GST Registration No.is 24AADCP1453C1ZZ
8. TAXES, PERMITS & LICENCES:
The Contractor shall be liable and pay all foreign taxes, duties, levies lawfully assessed
against the PGVCL or the Contractor in pursuance of the Contract. In addition the
Contractor shall be responsible for payment of all Indian duties, levies and taxes lawfully
assessed against the Contractor for his personal income & property only.
10. Income Tax -TDS
“Income-tax at source at the prevailing rate will be deducted from bills in accordance with
the provision of Income-Tax Laws and to that effect a certificate will be issued to the
contractor, however added as contractor has to submit separate invoice for supply parts item
as well as works part item separately, otherwise TDS will be deducted on entire invoice
11. Applicable welfare cess will be deducted from contractors each bill by PGVCL to pay
the same to the respective Govt. Department. Tax will be deducted as per applicable
statutory rules.
12. Statutory Deduction
Statutory deduction will be made as per applicable rules & rates for TDS, GST TDS,
welfare cess or any other taxes applicable time to time etc. All other statutory liabilities
towards this contract will be on your part.
11. STATUTORY VARIATION
Any statutory increase in the taxes subsequent to your offer if it takes place within the
contract period will not be considered except GST. No statutory variation will be given
for this work except GST. However, if any decrease takes place within/after the
contractual delivery date, the advantage will have to be passed on to PGVCL.
12. The Contractor shall be fully responsible for deducting the P.F. of the employees/labour
Working under him as per statutory regulations and depositing the same with the
concerned authorities.
13. The Contractor shall comply with the relevant laws of India.
The Contractor shall be liable for and shall indemnify the Employer against all losses,
expenses or claims arising in connection with the death of or injury to any person
employed of the Contractor or his subcontractors for the purposes of the Works.
Sign & Stamp of the Bidder
GENERAL TERMS AND CONDITIONS for successful bidders
The successful bidder shall be deemed to have carefully examined all the papers, drawings,
etc. attached & if has any doubt as to the meaning of any portion of any condition /
specification, etc. he shall before signing the contract submit the particulars thereof to
PGVCL in order that such doubts are removed.
The successful bidder shall not, without the consent in writing of PGVCL, transfer, assign
or sublet the work under this contract or any substantial part thereof to any other party.
The execution of work should be commenced as per the instruction of the Engineer In Charge
as per actual requirement and should be completed within the time limit thereafter.
PGVCL may at any time by notice in writing to the successful bidder either stop the work
altogether or reduce or cut it down. If the work is stopped altogether, the Bidder shall
only be paid for work done. If the work is cut down the Bidder shall not be paid for the
work as so cut down, but in neither case shall be paid any compensation what so ever
for the loss or profit which he might have made if he had been allowed to complete all
the work included in the contract.
Notices, Statements and other communications sent by PGVCL through registered post or
telegram or telex or any other way of communication to the successful bidder at his
specified address shall be deemed to have been delivered to the successful Bidder. The
work shall be carried out by the successful bidder with prior approval of PGVCL. Work
carried out without PGVCL’s approval shall not be accepted and the PGVCL shall have
right to reject it and to recover the cost from the successful bidder. He will be liable
against all losses, expenses or claims arising in connection with the death of or injury
to any person employed by the successful bidder or his subcontractors for the purposes
The successful bidder shall be responsible for any damage to the equipment during transit
due to improper or inadequate packing, handling, loading and unloading. The cases
containing easily damageable material shall be very carefully handled. Adequate
protection must be provided for outdoor storage at site in tropical humid climate,
wherever necessary. The successful bidder without any extra cost shall supply any
material found short inside intact store area.
If the successful bidder neglects to execute the work with due diligence and expedition or
refuses or neglect to comply with any reasonable orders within two days’ notice given
in writing to the successful bidder and if he fails to comply with the notice, then in such
a case PGVCL shall be at liberty to get the work or any part of it, executed through any
other agency/Bidder in the manner and on the terms it thinks proper. If the cost of
executing the work as aforesaid shall exceed the balance due to the Bidder, and the
Bidder fails to make good the deficiency, PGVCL may recover it from the Bidder in
any lawful manner.
Sign & Stamp of the Bidder
PGVCL shall have at all reasonable time access to the works being carried out by the Bidder
under this contract and stores where material issued by PGVCL is stored. All the works
shall be carried out by the Bidder to the satisfaction of PGVCL.
The quantities mentioned in the accompanying schedule B are only approximate same may
decrease or increase. The PGVCL reserves the right for revising or omitting any of the
quantities. The actual work executed by the successful bidder will be calculated at the
rate given in the contract schedule of the rates binding to the successful bidder.
No higher rate or revised rate will be application for the work, if work is held-up/closed due
to whatever so reasons.
Price shall not be changed subject to any upward/downward revision on any account
whatsoever through the period of contract.
All other general terms and conditions as prevailing in the PGVCL shall be applicable to this
The successful bidder has to co-ordinate and co-operate fully with Engineer In Charge and for
execution of the works.
Either successful bidder or successful bidder’s authorized person should contact our Engineer
In Charge as well as Division Office, Bhuj daily for the availability of materials required
for this work, failing to which this work order shall be terminated without giving any
The successful bidder has to maintain site register covering all aspects of material
received/utilized/dismantled for day to day work and has to obtain signature of
Engineer in Charge.
In case of any dispute doubt, the decision of Superintending/Executive Engineer Bhuj
Division shall be unchallengeable and final, which will be binding to the contractor.
Security Deposit (without any Interest) will be refunded after completion of guaranteed period
All legal complication of disputes is subject to Bhuj jurisdiction only.
A fresh and valid solvency certificate to the extent of 20% of the ordered value will have to
be produced by the contractor and party has to submit attested copy of solvency
certificate to the company before commencing of work.
The successful bidder will be solely responsible for any accident/damage either to equipment
or any human being during the time of execution of work.
Prior institution in writing for starting the job will be given by PGVCL for the work.
The successful bidder will have to make his own arrangement for required all kinds of tools,
tackles, required for the execution of work.
The cost of damages, if any will be recovered from the successful bidder’s bill. The assessment
of which will be done by Engineer In Charge in consultation with division office, and
his sole discretion and his decision shall be binding to the successful bidder and shall
be considered as final and unchallengeable.
Sign & Stamp of the Bidder
The successful bidder will have to give indemnity bond to PGVCL against any possible claim
of compensation for damage to Contractor’s equipment or staff or any of third parties
during the execution of work as per attached format.
The successful bidder will have to complete entire work, as mentioned in Schedule-B of
contract awarded to him, as per directive and instruction of Engineer In Charge. If he
fails to do so entire work will be carried out at the risk and cost of Contractor.
The contractor must engage sufficient knowledgeable person round the clock, exclusively for
execution of work.
Specification in any items mentioned in tender are subject to change without any prior notice
and binding to the contractor.
The PGVCL shall deduct the Income-Tax and other taxes as per prevailing rules of all relevant
Govt. Authorities from the bill.
If the work is required to be carried out during fix outage then the successful bidder has to
deploy adequate man power, material, tools etc. well in advance and has to complete
the entire work during this specific outage period only, failing to which Company shall
be at liable to deduct the amount of revenue loss due to prolong outage.
The tender include all minor accessories and items of work which may not have been
specifically mentioned in the specification / Schedule etc. but are essential for
completion of work. The contractor will not be eligible for any extra payment in respect
of such minor accessories and item of work.
The successful bidder shall not refuse to execute the work order at any time and it will be his
sole responsibility to execute and complete this work as per the instruction of Engineer
For shortage of any materials issued by the PGVCL for the work, recovery shall be made from
you, on the basis of prices of the materials (prevailing on the date of settlement of
materials account) plus 15% supervision charges.
The successful bidder has to carry out all the works in accordance with revised and latest
provision under I.E. Rule Act made there under and as per instruction of Engineer In
All the materials issued by PGVCL shall be transported to the work site on same day and to
be preserved in safe custody failing to which PGVCL shall initiate Police action.
Similarly as per instruction of Engineer In Charge, you have to credit the material at
PGVCL store without any loss of time failing to which PGVCL shall initiate Police
Any delay causing extension of outages shall be successful bidder’s responsibility and
appropriate amount (in term of Rupees) as decided by
Executive Engineer, Bhuj Division shall be
recovered from successful bidder’s bill as a penalty with applicable GST.
No tools, tackles, manpower, crane facilities etc. will be provided by the PGVCL.
The contractor has to follow all labour laws, safety rules and regulations. The PGVCL does
not take any responsibility in case of accident or injury to the workers. The safety,
security of men, materials and equipment shall be sole responsibility of the contractor.
Sign & Stamp of the Bidder
The compliances of all Central / State Govt. Rules, safety and insurance rules etc. and that of
local body is a must condition for the successful bidder.
The successful bidder shall specifically note that PGVCL will not pay any extra amount
towards any type of claim except for the description indicated in Schedule –A. The
party has to carry out all other additional required activities / work as directed by
Engineer In Charge which is not mentioned in Schedule but required to be completed
as per the site condition and for this work no extra payment shall be made by PGVCL.
The contractor should employ as a Supervisor with sufficient qualification and experience
who could supervise the execution of work throughout. He should always be present
The contractor shall be responsible for breakages, losses and a theft of material during transit
or erection after the materials issued from the stores till the completion of work and is
taken over by the PGVCL.
As regard damages to the materials, equipment, successful bidder himself will be responsible.
If there is any compensation to be paid in respect of “WORKMAN” Compensation Act
or any other statutory provisions, the same will be paid by contractor directly. If he
thinks fit, he may take necessary insurance covering at his cost.
The successful bidder shall co-operate with the PGVCL for taking measurement etc. as early
as possible and he shall fulfil the entire requirement which is necessary to finalize the
The competent authority can delete any item in schedule of the tender if he feels that the rate
quoted by the contractor for the item is abnormally high when compared to the
estimated rates.
The successful bidder shall not refuse to execute this work order at any time and it will be his
sole responsibility to execute and complete this work as per the instruction of Engineer
The erection work should be carried out according to the specification as per instructions
and programmed laid out by the Engineer in charge. Contractor has to ensure safe
shifting and erection of all accessories / equipment as per standard norms.
The Bidder shall not display the photograph of the work and shall not take advantage through
publicity of the work without written permission of PGVCL.
The inspection as mentioned in above clause No. 6 of this section by PGVCL’s representative
shall not relieve the successful bidder from full responsibility of completing the work
confirming to the requirement of this contract.
Under the Contract, the Contractor shall be responsible for loss or damage to the line and
Electrical Equipment until the successful completion as defined elsewhere in the Bid
All demurrage, wharf age and other expenses incurred due to delayed clearance of the material
or any other reason shall be to the account of the Contractor.
Sign & Stamp of the Bidder
The law applicable to the contract shall be the laws in force in India. The courts of Rajkot
shall have exclusive jurisdiction in all matters arising under the contract.
2 PRICE EVALUATION:
No price preference shall be given on any account. All tenders must be submitted firm price
basis (Inclusive of all Taxes) and lowest evaluated bid in the interest of the PGVCL, for the
complete works covered under these specifications and documents.
If more than one party is to be considered for placement of order, they will have to match
their end cost with end cost of L-1 technically acceptable bidder. PGVCL (tender Inviting
Authority) may go to the L-2, L-3 and so on depending upon the requirement. If PGVCL
(tender Inviting Authority) feels that there is lack of serious competition or any other reasons,
PGVCL (tender Inviting Authority) may negotiate with the L-1 party. PGVCL’s (tender
Inviting Authority) decision shall be final and binding on all the parties.
3 QUANTITY DISTRIBUTION
For Erection & Maintenance work of HT/LT/TC:
The Contractors whether non-experienced / New or experienced / Regular who have
confirmed /fulfilled pre eligibility criteria, as mentioned in Section 1 Sr. No. 2 , will
only be considered for price evaluation. PGVCL will not consider the, price bid of
any contractor who does not confirm / fulfil the eligibility criteria as mentioned in
Section 1 Sr. No
While placing the order, the quantity distribution to each new contractors / new firms shall be
restricted up to 30 % of the tender amount/Qty. for all such new bidders provided the
price of New contractor is lower than the regular/experienced contractor. New
contractor / new firm will be considered as a regular contractor only after full filing
experience criteria as mentioned in Bidders qualifying criteria as per point no. 2 in
The new contractor will be asked to match the L-1 prices of the new contractor only and the
Regular contractor has to match the L-1 price of the Regular/experienced contractor
But if there are no Regular contractor OR if the rate of Regular contractor is
very high, the above condition no. 2.11 shall be suitably relaxed by PGVCL.
L-1 regular contractor however will get heavy weight age in order placement.
For laying of Under Ground Cable work:
While placing the order, the quantity distribution to each new contractors / new firms, Section
1 Sr. No. 2, shall be restricted up to 10 % of the tender amount/Qty. for all such new
bidders provided the price of new contractor is lower than the regular/experienced
contractor. New contractor / new firm will be considered as a regular contractor only
after full filing experience criteria as mentioned in Bidders qualifying criteria as per
point no. 2 in Section I.
Sign & Stamp of the Bidder
The new contractor will be asked to match the L-1 prices of the
new contractor only and the Regular contractor has to match the L- 1 price of the
Regular/experienced contractor only. But if there are no Regular contractor OR if the
rate of Regular contractor is very high, the above condition no. 2.21 shall be suitably
relaxed by PGVCL. L-1 regular contractor however will get heavy weight age in order
placement. The Contractors who have confirmed /fulfilled pre eligibility criteria will
only be considered for price evaluation. PGVCL will not consider the price bid of any
contractor who does not confirm / fulfil the eligibility criteria. L-1 regular contractor
however will get heavy weight age in order placement.
4 IDENTIFICATION OF SITE:
Details of each location shall be made available through Executive Engineer of each concerned
Divisions under above locations. The planning for each location has to be prepared in
consultation of the Deputy Engineer of the concerned Sub Division under whose control the
work is allocated. The work must be carried out under Supervision of concerned S/dn Head or
Authorized Staff appointed by SDO.
5. ALLOTMENT OF MATERIAL AND ITS STORAGE
Required material for the work as per Schedule shall be allotted from any store Centres of
PGVCL jurisdiction and successful bidder has to take delivery from these stores at his own
6. Contractor will be issued only 3 (Three) Sub work orders at a time. He will be issued Fourth
Sub Work Order only after the submission of Inventory sheet with sketch and material account
statement for any of the three previously issued Sub Work Orders.
7. TAKING DELIVERY AND INSURANCE:
The contractor has to keep all materials in safe custody and transport to the respective sites and
will be fully responsible for any damage to or loss of all materials at any stage during
transportation or erection till taking over by PGVCL
The Contractor has to open site store/s (Maximum Two Nos.) and ensure for safe custody of
all the stored materials at his own cost. Material which is to be allotted by PGVCL is to be
carted, loaded and unloaded at Bidder’s cost and risk from PGVCL’s respective Stores.
PGVCL must have access to such Store/s at any time of Day thought the contractual period
and Contractor will cooperate for verification of such store/s and Inventory accounting.
Failing to which actions may be initiated after issuance of required Notice to the Contractor.
Store address/s is to be mentioned in the “General information about the Bidder” under
Section I of this Tender.
The Contractor shall have total responsibility for the entire materials stored, loose, semi
assembled and/or erected by him at site in his custody. The Contractor shall make suitable
security arrangements at his own cost to ensure the protection of all materials, equipment
and works from theft, fire pilferage and any other damages and loss. It shall be the
responsibility of the contractor to arrange for security till the works are finally taken over
Sign & Stamp of the Bidder
STORAGE-CUM-INSURANCE:-
The contractor shall take suitable storage-cum-erection insurance cover at his cost to the extent
of 100 % cost of materials, which are required to complete the work. Contractor shall have to
take comprehensive insurance policy equivalent to the Order Value against any loss, damage,
theft, pilferage, fire etc. for the complete period of storage, erection and commissioning up to
the time of taking over by PGVCL. The Contractor shall deal directly and pursue the claim with
the Insurance Company and shall be responsible in regard to maintenance of all insurance
coverage as well as for settlement of claim. The proof of insurance policy taken by the successful
Contractor shall be furnished to Engineer-In-Charge. In absence of the above insurance policy,
R.A. Bill payment will be withheld.
In the event of any damage, theft, loss, pilferage, fire etc., Contractor will be responsible to
lodge, pursue and settle all the claims with the Insurance Company for all items, materials and
the PGVCL shall be kept informed about it. Contractor shall replace the lost / damaged materials
/ items promptly irrespective of the settlement of the claims by underwriter and ensure that the
work progress is as per agreed schedule. The loss, if any, such replacement will have to be borne
by the Contractor and PGVCL will not entertain any claim / representation in this regard.
However it will be contractor's responsibility to insure the entire project is taken over by the
8. Account of material issued:
The successful bidder shall have to maintain accurate day to day item wise account of use
of issued materials which shall be got checked from time to time by the Engineer In
Charge of the Company. The contractor will be responsible for custody and preserving
the issued materials till the work is hand over by the contractor after completion.
The successful bidder has to maintain site register, covering all the daily details of material
receipt and utilization, progress of work etc. This register shall be checked and signed
by Engineer In Charge/Deputy /Executive Engineer, Sdn/Division during the site visit
as per requirement and exigency of work if deem fit.
After completion of the work against each Sub Work Order, all the surplus materials issued
by the PGVCL shall be returned by you to the respective divisional /Regional stores
only at contractor’s cost. Such Material Shall not be credited in S/Dn store.
9. Work Completion Period:
In the event of placement of order, successful bidder shall have to complete the ordered work
within 365 Days from the Date of issue of Work Order.
Time limit of each sub work order should not be maximum up to 30 Days.
8.3 WORKING DAYS: -
In case, it is not possible for the successful bidder to continue the work either due to
heavy rains or other reasonable causes, such facts should be immediately brought to
notice of the Engineer In Charge. If the reasons for stopping the work are genuine the
Engineer In Charge may ask the successful bidder to start the work again as per
condition. The period of such stoppage will not be considered as a part of working days
moreover the successful bidder cannot claim compensation for such stoppage.
Sign & Stamp of the Bidder
9.4 PROGRESS OF WORK
You will have to submit fortnightly progress report regularly in duplicate to Engineer
In Charge and Executive Engineer, Bhuj Division. If found that the work is
unsatisfactory or not progressing as per schedule then any action would be taken by the
PGVCL as may deemed fit to see that work is completed at the risk and cost of
contractor. The completion time allowed for each Sub work Order shall be strictly
9. Time limit extension will be given, as per Clause No. 12 of this section, if material is not
supplied in time and in any case of objection not cleared in time. But if materials given in
time and there is no any objection, then no time limit extension will be granted and penalty
with applicable GST with Cess will be imposed as per rules.
11 CHANGE OF QUANTITY:
During the execution of the Contract, the PGVCL reserves the right to increase or decrease
the quantities of items under the Contract but without any change in unit price or other
terms & conditions. Such variations unless otherwise specified in the accompanying
GCC and/or Technical
Specifications, shall not be subjected to any limitation for the individual items but the
total variations in all such items under the Contract shall be limited to the extent of 30%
(Thirty Percent) of the contract price by way of suitable amendment to the contract.
The Contract price shall accordingly be adjusted based on the unit rates available in the Contract
for the change in quantities as above. The base unit rates, as identified in the Contract shall
however remain constant during the currency of the Contract, In case the unit rates are not
available for the change in quantity, the same shall be subjected to mutual agreement.
As this is an EPC contract, engineering work will be done by the Contractor.
Responsibility of material will be that of the contractor.
12. Penalty with GST:
Penalty with GST is levied on the time limit of Sub Work Orders. If the work is not
completed within the scheduled period as prescribed in Sub Work Order, penalty with
GST and cess as applicable at the rate of 0.5 % per week or part thereof on delayed
portion subject to maximum up to 10 % of the sub work order Value with GST and
cess as per applicable rate. This will be deducted from the bills payable either against
this contract or any bank guarantee or any other amount payable under any other
contract with the PGVCL. For Penalty calculations or Time limit Extension, following
points are to be observed.
Start Date of Sub Work Order for Penalty Calculation will be the Day/Date on which
the first material is issued against the Sub Work Order.
If material is not available in respective stores then “NO STOCK” stamping by Store In-
charge/Store Keeper must be taken against the particular item by the contractor.
In Case of non-availability of Material, contractor must visit the respective store every
fortnight and no stock material details are to be submitted to respective Executive
Engineer and concerned SDO.
TLE of Sub work order can be granted on the basis of above such documents produced by
Sign & Stamp of the Bidder
Time limit Extension must be given as per F & A Letter No. PGVCL/F&A/5083/14-06-2017
and PGVCL/F&A/745/11-06-2018.
At the time of submission of Bill against SWO, all such Documents are to be submitted by
contractor for waiver of Penalty if applicable.
Time limit of Annual Work Order should be maximum up to 365 Days.
During the execution of Work, if Contractor/Labour are found violating OR Braking the
Safety rules and Regulations, then Engineer-in-Charge will serve the warning Notice
on first Instance. On second Instance the amount of Fine will be Rs. 500.00 or 0.1 %
of amount of SWO (Whichever is high) with GST and cess. Even If after above two
instances, still Contractor found breaking of Safety Rules and Regulations then
Procedures for Stop dealing must be initiated against him as per rules and regulations.
13. Payment terms shall be as follows:
Payment will be made against Invoice value and shall be paid against actual execution. The bills
should be submitted in Duplicate to respective Executive Engineer, Division Office, Bhuj
along with following documents:
• Measurement Report of each site by PGVCL authorized inspection Officer (not below
the rank of Deputy Engineer)
• Material Accounting for work duly certified by Engineer-in-charge
• Work Completion Certificate duly signed by Contractor for which the Bill is submitted.
• Copy of Insurance Policy against the Material equivalent to the Order Value as per
Tender Condition No. No.7 under this Section.
• Contractor must submit the above documents within Fifteen (15) Days from the actual
date of completion of work to respective S/dn Office.
• DOP is to be followed for Payments against the Work Orders.
R.A. Bill shall be paid by the PGVCL, if it satisfy with the output of works otherwise only
final bill shall be paid.
The time limit for the work may be reduced and contractor should make all his efforts to
complete the work within stipulated time limit as may be given by the Engineer In
Charge depending upon emergency of work.
14 FORCE MAJEURE:
Force Majeure means any circumstances beyond the control of the parties including:
War and other hostilities, (whether war be declared or not), invasion, act of foreign
enemies, mobilization, requisition or embargo;
Rebellion, revolution, insurrection, military or usurped power and civil war;
Ionizing radiation or contamination by radioactivity from any nuclear fuel or from any
nuclear waste from the combustion of nuclear fuel, radioactive toxic explosive,
or other hazardous properties of any explosive nuclear assembly or nuclear
components thereof;
Riot, commotion or disorder, except where solely restricted to employees of the
Neither party shall be considered to be in default or in breach of his obligations under
the Contract to the extent is that performance of such obligations prevented by
any circumstances of Force Majeure that arise after the date of the Notification
Sign & Stamp of the Bidder
If either party considers that any circumstances of Force Majeure have occurred which
may affect performance of his obligations he shall promptly notify the other
Upon the occurrence of any circumstances of Force Majeure, the Contractor shall
endeavour to continue to perform his obligations under the Contract so far as
reasonably practicable. The Contractor shall notify the Engineer-in-Charge of the
steps he proposes to take including any reasonable alternative means for
performance, which are not prevented by Force Majeure. The Contractor shall
not take any such steps unless directed so to do by the Engineer-in-Charge.
If circumstances of Force Majeure have occurred and shall continue for a period of
180 days, notwithstanding, the Contractor may by reason thereof, having been
granted an extension of Time for Completion of the Works, either party shall be
entitled to serve upon the other, 30 days’ notice to terminate the Contract. If at
the expiry of the period of 30 days Force Majeure shall continue, the Contract
shall terminate.
15 TESTING & COMMISSIONING:
The successful bidder will ensure that completion of execution of work i.e. all works
connected with line having been completed correctly as per Indian Electricity Rules &
procedure. Any extra cost involved due to incompleteness of work or bad workmanship
found out subsequently shall be set right with and by you at your own cost.
16 HANDING OVER OF ASSET
After successful completion of the lines and Transformers or any other electrical
equipment the entire newly created network is to be handed over to the concern
Deputy Engineer of PGVCL. The handing over note covering the details of all
the materials used and total work executed must be signed jointly by the bidder
and PGVCL Engineer. Copy of handing over note must be attached along with
The contractor shall arrange to hand over the complete work immediately on completion
of entire work.
If some material/Item is not installed/fixed for allotted work and as per SOR by
contractor due to non-availability of particular item/material for long period of time and
TLE cannot be approved for that work beyond certain time limit Or such item if not
required to be installed at particular location, then Recovery is to be made as mentioned
below for not carrying out that work from SWO issued for that work.
Empty Wooden Drum (Assorted Sizes) : Rs. 450.00 per Drum
All work other than above must be completed by contractor and No any other Recovery
should be made other than above Work.
Sign & Stamp of the Bidder
18 CONTRACT QUALITY ASSURANCE:
The Bidder shall include in his proposal the Quality Assurance Program containing the overall
quality management and procedures which he proposes to follow in the performance
of the Works during various phases as detailed in relevant clause of the General
Technical Conditions.
At the time of Award of Contract, the detailed Quality Assurance Program to be followed for
the execution of the Contract. PGVCL reserve the right to inspect the work at any stage
of contract i.e. during the execution and after the execution of work.
The Bidder shall clearly specify the list of sub-vendors from whom the bought out items (if
any) are being supplied. Such details shall be accompanied by their list of previous
supplies made performance reports etc. However, in case of orders are placed, specific
approval shall be obtained from the PGVCL for the vendor supplied materials. The
quality assurance program shall be furnished for each material separately for approval.
19 TERMINATION OF CONTRACT ON PGVCL’S INITIATIVE
In case of any type of misappropriations, cheating or intention of cheating, frauds,
irregularities, malpractice, etc. the Managing Director PGVCL reserves the right to
cancel the order without giving reasons thereof and forfeit the security deposit.
The PGVCL reserves the right to terminate the Contract either in part or in full due to reasons
other than those mentioned under clause entitled ‘Contractor’s Default. The PGVCL
shall in such an event give fifteen (15) days’ notice in writing to the Contractor of his
decision to do so.
The Contractor upon receipt of such notice, as per point no.19.2 above, shall discontinue the
work on the date and to the extent specified in the notice, make all reasonable efforts
to obtain cancellation of all orders and Contracts to the extent they are related to the
work terminated and terms satisfactory to the PGVCL, stop all further sub-contracting
or purchasing activity related to the work terminated, and assist PGVCL in
maintenance, protection, and disposition of the works acquired under the Contract by
the PGVCL. In the event of such a termination the Contractor shall be paid
compensation, equitable and reasonable, dictated by the circumstances prevalent at the
time of termination.
If the Contractor is an individual or a proprietary concern and the individual or the proprietor
dies and if the Contractor is a partnership concern and one of the partners dies then
unless the PGVCL is satisfied that the legal representatives of the individual Contractor
or of the proprietor of the propriety concern and in the case of partnership, the surviving
partners, are capable of carrying out and completing the Contract the PGVCL shall be
entitled to cancel the Contract as to its in completed part without being in any way
liable to payment of any compensation to the estate of deceased Contractor and/or to
the surviving partners of the Contractor’s firm on account of the cancellation of the
Contract. The decision of the PGVCL that the legal representatives of the deceased
Contractor or surviving partners of the Contractor’s firm cannot carry out and complete
Sign & Stamp of the Bidder
Contract shall be final and binding on the parties. In the event of such cancellation the
PGVCL shall not hold the estate of the deceased Contractor and/or the surviving partners
of the estate of the deceased Contractor and/or the surviving partners of the Contractor’s
firm liable to damages for not completing the Contract.
20 ARBITRATION:
Any question, dispute or difference whatsoever arises between PGVCL and Bidder, in
connection with this agreement except as to matters, the decision for which has been
specifically provided, either party may forthwith give to the other notice in writing of
existence of such questions, dispute, difference and the same shall be referred to the
sole arbitration of a person nominated by Managing Director, PGVCL. This reference
shall be governed by Indian Arbitration Act prevailing at the time of dispute and the
rules made there under. The award in such arbitration shall be final and binding on all
the parties. Work under the agreement shall continue during the arbitration proceedings
unless the PGVCL or the Arbitrator directs otherwise.
The technical information, drawings, specifications and other related documents forming
part of the enquiry or Contract are property of PGVCL and shall not be used for any
other purpose, except for the execution of the contract. All rights related to the technical
specifications, drawings and records are reserved by PGVCL only and no part or partial
should be reproduced, copied or alter without prior permission to PGVCL in writing. In
the event of the breach of this provision, PGVCL can claim the damages caused by such
22 Stop Dealing:
Bidder/Contractor shall be put under Stop Deal due to following reasons.
Has submitted fake, false or forged documents/certificates
Has revised/withdrawn price bid after opening of Techno:
commercial bid, until and unless it is sought for
Has refused to accept Letter of Acceptance/Purchase
Order/Work Order after the same is issued by the Company within the validity period
and as per agreed terms and conditions
Has committed breach of contract or has failed to perform a
contract or has abandoned the contract
Has failed to provide suitable expertise for the work as per
prescheduled program
Has failed to submit all the necessary Test reports/documents within time schedule / as per
Company's time limit, as mentioned in the LOA, if the Letter of Acceptance (LOA) is
placed subject to submission of type reports / documents to the firm.
Has indulged in construction and erection of defective works.
Has substituted materials In lieu of materials supplied by the Company or has not returned or
has short returned or has unauthorised disposed of materials/ documents/ drawings/
tools or plants or equipment supplied by the Company
Has involved in malpractices such as bribery, corruption,
fraud, canvassing and pilferage
Has unauthorised obtained official company information or
copies of documents, in relation to the Tender/Contract Date:
Sign & Stamp of the Bidder
Has failed to follow the stipulated mode of communication, if specified by the tendering
authority/ purchaser.
Any other ground for which in the opinion of the Company
makes it undesirable to deal with the Firm, and
In case the State Government directs the Company to place a
firm in stop dealing/ banned for business dealing/ blacklisting
The firm, stop deal and/or banned for business dealing and/ or blacklist by GUVNL or any
subsidiary Companies of GUVNL shall be considered as a stop deal and/ or banned for
business dealing and/ or blacklisting for all Companies.
23. Effect of putting a proprietor/firm for Stop dealing/Banned for business dealing
The proprietor/all the partners/directors of the stop deal/ banned for business dealing/
blacklisting firm shall also be considered for stop deal/ banned for business dealing.
Once the name of the firm and/ or proprietor/ partner/ director of the firm appears in
the list of Stop dealing / Banned for business dealing in
any Company of GUVNL and its Subsidiary Companies,
(i) No enquiry shall be issued to a firm.
(ii) No bids / tender shall be considered for evaluation and the bid submitted by
the Firm shall be returned.
Action to be taken, when a Firm and/or proprietor/ partner/ director of the firm is put on Stop
dealing/ Banned for business dealing by GUVNL or any of its subsidiary Companies,
during tender process: -
(i) Before opening Technical bids, the bid submitted by the Firm will be
treated as “Disqualified Bid” and automatically stand as “Rejected Bid”
at the time of scrutiny of Preliminary / Technical Bid.
(ii) After opening Technical bid but before opening the price bid, the price
bid of the Firm should not be opened and the bid submitted by the Firm
will be treated as “Disqualified Bid” and automatically stand as
“Rejected Bid” at the time of scrutiny of Technical Bid.
(iii) After opening of price bid, the offer of the Firm should be ignored and
will not be further evaluated. The Firm will not be considered for issue
of order even if its price is the lowest. In this situation, the next lowest
bidder shall be considered as L1.
(iv) The BG/EMD submitted by the Firm with tender should be returned
after obtaining confirmation from GUVNL and its other subsidiary
Companies that there are no outstanding dues recoverable from the firm.
If a Firm is put on Stop dealing / Banned for business dealing in one Company and is already
executing work and/ or Letter of Acceptance/ purchase order awarded to them by
another Company, then the firm should be allowed to complete such awarded work /
Sign & Stamp of the Bidder
The amount of EMD/SD/ any payment against supply withheld at the instance of GUVNL or
any of its subsidiary Companies shall be appropriated against the dues recoverable from
the firm by GUVNL or any of its subsidiary Companies. EMD/ SD/ PG in the form of
bank Guarantee shall be encashed and appropriated.
The Stop dealing/ Banned for business dealing shall be Firm- specific and when a Firm is put
on Stop dealing/ Banned for business dealing, all the manufacturing works of the Firm
shall be on Stop dealing/ Banned for business dealing for GUVNL and its Subsidiary
Companies & for all Services of the Firm.
If the Firm placed on Stop Dealing/ Banned for business dealing is a Proprietary Concern,
then all the Concerns of the same Proprietor shall also be considered to be on Stop
Dealing/ Banned for business dealing.
The Board of Directors of the concerned Company may however, if he considers it to be in
the interest of the Company, remove the ban in respect of any specific Service from
any Contractor for that Company only.
24. Every bidder should, at the time of submission of bid, give a declaration as per
Annexure VI attached with this Tender, that bidder and/or proprietor/ partner/ director
of the firm has not been placed on Stop dealing / Banned for business dealing /
blacklisting by GUVNL and it’s any Subsidiary Companies.
25. JURISDICTION:
All questions, disputes, or differences arising under out of or in connection with
Tender/Contract if concluded shall subject to the exclusive jurisdiction of the Court
under whose jurisdiction the place from which Tender/Acceptance if Tender is issued,
is situated i.e. respective Location’s Court.
Sign & Stamp of the Bidder
Annexures/BG/Agreement/Indemnity Bond
TIME SCHEDULE FOR COMPLETING THE WORK
(To be completely filled by the Bidder)
Name of the Bidder
Item Time required for work Mentioned in Tender
1 Labour work for Laying of
Underground cable and E/o HT
LT Line and Transformers and
Sign & Stamp of the Bidder
Annexure – I Details of work experience in last three
years (To be completely filled by the Bidder)
Company with full Ref. & Work
Sr. address, Details of order
Work Description date of the Order
No. phone, fax and order Value
name of contact
• Copies of MAJOR Work orders along with Work completion certificates should be attached with
this information.
• If necessary, separate sheet may be used to submit the information
Sign & Stamp of the Bidder
Details of Pending Orders as on Bidding Date (To be
completely filled by the Bidder)
Company with full Ref. & Work Reason for non-
Sr. address, Work completion with
date of the Order
No. phone, fax and Description Certification of
name of contact Order issuing Authority
• Copies of Resumes and appropriate certifications should be attached with this information.
• If necessary, separate sheet may be used to submit the information.
Sign & Stamp of the Bidder
(Strike off whichever is not applicable)
This is to declare that Mr. /Ms. , employee of
PGVCL at (place), is related to our
(designation & name).
This is to declare that none of the Proprietors/ Partners/ Directors are having any relatives employed or
working with Paschim Gujarat VijCo.Ltd.at any of its offices or its parent Department i.e. Energy &
Petrochemicals Dept., Govt. of Gujarat.
Date: Sign. & Stamp of the Bidder
DEVIATION SHEET
Any deviations offered from the terms and conditions of the Offer should be clearly specified below in
this sheet. If there are no deviations offered, it should be clearly mentioned on this page.
Deviation offered to
Chapter No, Clause No. of the Deviation offered
tender document
Sign & Stamp of the Bidder
Annexure – V List of Onsite Testing Facility (For the
work of Laying of HT/LT Underground Cable)
(To be completely filled by the Bidder)
Sr. Name of equipment Date of purchase Date of calibration Utility
Sign & Stamp of the Bidder
Sub: -UNDERTAKING IN REGARD TO STOP DEAL/BLACK LIST THEREOF
Ref: - Tender No: PGVCL/
All bidders will have to furnish the following undertaking duly filled in signed and stamped for
each quoted item of the tender along with the Technical Bid.
signatory of M/s hereby certify
that M/s is not stop
deal/black listed by GUVNL and or any subsidiary companies viz.
PGVCL/UGVCL/DGVCL/PGVCL/GSECL/GETCO for the tendered item.
Seal & Signature of the Tenderer/Firm
LIST OF TYPE TESTS REPORTS SUBMITTED WITH THE TECHNICAL BID
(For the work of Laying of HT/LT Underground Cable)
(Not Older than 7 Years)
Type Test Tests Carried Rating & Type / Name of the test Results Of
Sr. No Conducted
Report No. & out at (Name of Designation of the Tests.
Date Laboratory) Item / Equipment
Sign & Stamp of the Bidder
List of Performance Certificate:
Name of the Authority by whom
Sr. No. Reference No. & Date Details of items
certificate is issued
Sign & Stamp of the Bidder
Details of Fatal/Non-Fatal Accidents Occurred To the Contractor Labours during Last Five Years
Sr. Type Of Accident Fatal/Nonfatal Affected Brief Reason for the
No. (Electrical/Mechanical) Labour/s Accident
Sign & Stamp of the Bidder
Sub: -UNDERTAKING IN REGARD TO ANY PENDING CRIMINAL CASE FOR FRAUD OR
MISHANDALING OF MATERIAL
Ref: - Tender No: PGVCL/
I/We authorized signatory of M/s hereby declare we will provide nos of labours to carry
out this tenders scope of work. We are having Labour Insurance Policy No. for nos. of our
labours. We declare that, as mention below table, we are having following safety gadgets of our
own and they all are in good condition.
Seal of the Firm Signature of the Tenderer with Designation
List of Safety Gadgets Owned by Bidder
List of Safety Gadget Unit owned by
2 Earthing Rod No
4 Safety Belt No
5 Hand Gloves for LT Pair
6 Hand Gloves for HT Pair
7 Other safety items
Sign & Stamp of the Bidder
On Firm’s Letter Head
CERTIFICATE – “A”
I/We authorized
signatory of M/s.
hereby certify that
M/s. is not related with other firms who have submitted tenders for the same items under
this inquiry / Tender.
• Seal of the Firm Signature of the Tenderer
• Place: With Designation
E.M.D. BANK GUARANTEE FORMAT
FOR TENDER NO.: ……………………………..…….
(Bank Guarantee on Non-Judicial Stamp Paper of Rs.100/-)
WHEREAS M/s. (Name & Address of the Firm) having their registered office at
(Address of the firms Registered
office) (hereinafter called the ‘Tenderer’) wish to participate in the tender No.
(Supply/ Erection/Supply & Erection Work) (Name of the material/equipment/Work) for
Paschim Gujarat Vij Company Ltd. and WHEREAS a Bank
Guarantee for (hereinafter called the “Beneficiary”) Rs. (Amount of EMD) valid till
(Mention here date of validity of this Guarantee which will be 5 (FIVE) months beyond
initial validity of Tender’s offer) which is required to be submitted by the tenderer along with the
We, (Name of the Bank and address of the Branch giving the Bank
Guarantee) having our registered office at (Address of Bank’s registered office) hereby give this
Bank Guarantee No. dated and hereby agree unequivocally and
Unconditionally to pay immediately on demand in writing from the Paschim Gujarat Vij Company Ltd.
or any officer authorized by it in this behalf any amount not exceeding Rs. (Amount of E.M.D.),
(Rupees (In words) to the said Paschim Gujarat Vij
Company Ltd. on behalf of the Tenderer.
We (Name of the Bank) also agree that withdrawal of the tender or part thereof by the Tenderer within
its validity or Non submission of Security Deposit by the Tenderer within one month from the date
tender or a part thereof has been accepted by the Paschim Gujarat Vij Company Ltd. would constitute
a default on the part of the Tenderer and that this Bank Guarantee is liable to be invoked and encashed
within its validity by the Beneficiary in case of any occurrence of a default on the part of the Tenderer
and that the encashed amount is liable to be forfeited by the Beneficiary.
This agreement shall be valid and binding on this Bank up to and inclusive of
(Mention here the date of validity of Bank) and shall not be
terminable by notice or by Guarantor change in the constitution of the Bank or the firm of Tenderer
Or by any reason whatsoever and our liability hereunder shall not be impaired or discharged by any
extension of time or variations or alternations made, given, conceded with or without our knowledge
or consent by or between the Tenderer and the PGVCL. “Notwithstanding anything contrary
contained in any law for the time being in force or banking practice, this Guarantee shall not be
assignable, transferable by the beneficiary (i.e. GUVNL or Subsidiaries). Notice or invocation by any
person such as assignee, transferee or agent of beneficiary shall not be entertained by the Bank. Any
invocation of the Guarantee can be made only by the beneficiary directly.”
NOTWITHSTANDING anything contained hereinbefore, our liability under this guarantee is
restricted to Rs. (Amt. of E.M.D.) (Rupees
) (In words). Our Guarantee shall remain in force till (Date of validity of
the Guarantee). Unless demands or claims under this Bank Guarantee are made to us in writing on or
before (Date of Validity of the Guarantee), all rights of Beneficiary under this Bank Guarantee shall
be forfeited and we shall be released and discharged from all liabilities there under:
Please Mention here Complete Postal Signature of the Bank’s Authorized Signatory
Address of the Bank with Branch Code, with
Telephone and Fax Nos. Official Round Seal.
NAME OF DESIGNATED BANKS:
• All Nationalized Banks including Public Sector Banks IDBI Bank Ltd.
• Private Sector Banks authorized by RBI to undertake the state Government business, which are (i)
Axis Bank (ii) ICICI Bank (iii) HDFC Bank
• Co-operative Banks and Commercial Banks and recognized/notified by Government of Gujarat
Note: The Banks shall be the Banks recognized / notified by the Finance Department, Government
of Gujarat (GoG) from time to time.
FORM OF BANKER’S UNDERTAKING (For SD)
(Bank Guarantee on Non-Judicial Stamp Paper of .100/-)
We, Bank of hereby agree unequivocally and unconditionally to pay
immediately on demand in writing from the Paschim Gujarat Vij Company Ltd. or any Officer
authorized by it in this behalf any amount up to and not exceeding (in words) Rupees
to the said Paschim
Gujarat behalf of M/s. who
have entered into a contract for the
supply/works specified below
L.O.A. No. dated .
This agreement shall be valid and binding on this Bank up to and inclusive of and
shall not be terminable by notice or by change in the constitution of the Bank or the firm of Contractors
/ Suppliers or by any other reasons whatsoever and our liability hereunder shall not be impaired or
discharged by any extension of time or variations or alterations made, given conceded or agreed, with
or without our knowledge or consent, by or between parties to the said within written contract.
“Notwithstanding anything contrary contained in any law for the time being in force or banking
practice, this Guarantee shall not be assignable, transferable by the beneficiary (i.e. GUVNL or
Subsidiaries). Notice or invocation by any person such as assignee, transferee or agent of beneficiary
shall not be entertained by the Bank. Any invocation of the Guarantee can be made only by the
beneficiary directly.”
“NOTWITHSTANDING” anything contained herein before, our liability under this guarantee
is restricted to Rs. (Rupees only). Our
guarantee shall remain in force until (Date of validity of the Guarantee). Unless demands or claims
under this Bank Guarantee are made to us in writing on or before (Date of validity of the
Guarantee), all rights of Beneficiary under this Bank Guarantee shall be forfeited and we shall be
released and discharged from all liabilities there under:
Please Mention here Complete Postal Address Signature of the Bank’s
of the Bank with Branch Code, Telephone and Authorized Signatory with
Fax Nos. Official Round Seal.
NAME OF DESIGNATED BANKS:
• All Nationalized Banks including Public Sector Banks IDBI Bank Ltd.
• Private Sector Banks authorized by RBI to undertake the state Government business, which are
(i) Axis Bank (ii) ICICI Bank (iii) HDFC Bank
• Co-operative Banks and Commercial Banks and recognized/notified by Government of Gujarat
Note: The Banks shall be the Banks recognized / notified by the Finance Department,
Government of Gujarat (GoG) from time to time.
This agreement is made at the day of month Year between the Paschim Gujarat
Vij Company Ltd. &
(hereinafter referred to as “the Contractor “which expression shall unless excluded by or repugnant to
the context included its successors or permit assigns) of the one part and the Paschim Gujarat Vij
Company Ltd. Having its Regd. and Corporate Office at Laxminagar, Off Nanamava Road, Rajkot,
360004 (hereinafter called “The Company” which expression shall unless excluded by or repugnant of
the context include its successors of assigns) of the other part.
Whereas the aforesaid Company has accepted the tender of the aforesaid contractor for the work of
as per Company’s LOA No. , Dated , hereinafter
called “The works and more particularly desorbed enumerated or referred to in the specifications, terms
other letters and schedule of price which for the purpose of identification have been signed by The
Superintending Engineer/Executive Engineer,
Circle/Division, PGVCL on behalf of the Company, a list where of is made out in the schedule here
under written and all of which said documents are deemed to form part of this contract and include in
the expression “The works “wherever herein used, upon the terms and subject to the conditions
hereinafter mentioned.
And whereas the Company has accepted the tender of the contractors for the Maintenance & Erection
of HT / LT Line & T/C and Underground cable up on the terms and subject to the conditions herein
1.) The contractors shall do and perform all works and things in this contract mentioned and
described or which are implied therein of therefore respectively or are reasonable necessary for
the completion of the works as mentioned and at the time in the manner and subject to the terms
conditions and stipulation contained in this contract and in consideration of the due provision,
executions, construction and completion of the works agreed to by the contractors as aforesaid
the company both hereby covenant with the contractor to pay all the claims of money as and
when they become due and payable to the contractor under the provisions of the contract such
payment to be made at such times in such manner as is provided by the contract.
2.) The conditions and covenant stipulation here in before in this contract are subject to and
without prejudice to the right of the company to enforce for delay and or any other rights
whatever including the right to reject and cancel on default or breach by the contract of the
conditions and the covenant as stipulated in the general conditions specifications form Or
tender schedule drawing etc. attached
with the Company LOA No. , Dated
3.) The Contractor will strictly follow the safety Rules and Regulations during the execution of
aforesaid work. The Contractor will also provide all required Safety Gadgets to his Supervisors
and labours to execute the work mentioned in Tender. On violating or breaking the Safety
Rules and Regulations, and if Supervisors/Labours are found without Safety Gadgets, “The
Company” reserves the right to take actions as per the terms and conditions mentioned in
Tender without any prejudice.
4.) The Company reserves the right to terminate the Contract either in part or in full due to reasons
other than those mentioned under clause entitled ‘Contractor’s Default’. The PGVCL shall in
such an event give fifteen (15) days’ notice in writing to the Contractor of his decision to do
5.) The Contractor upon receipt of such notice shall discontinue the work on the date and to the
extent specified in the notice, make all reasonable efforts to obtain cancellation of all orders
and Contracts to the extent they are related to the work terminated and terms satisfactory to the
Company, stop all further sub-contracting or purchasing activity related to the work terminated,
and assist “The Company” in maintenance, protection, and disposition of the works acquired
under the Contract by the Company. In the event of such a termination the Contractor shall be
paid compensation, equitable and reasonable, dictated by the circumstances prevalent at the
time of termination.
6.) If the Contractor is an individual or a proprietary concern and the individual or the proprietor
dies and if the Contractor is a partnership concern and one of the partners dies then unless “the
Company” is satisfied that the legal representatives of the individual Contractor or of the
proprietor of the propriety concern and in the case of partnership, the surviving partners, are
capable of carrying out and completing the Contract “the Company” shall be entitled to cancel
the Contract as to its in completed part without being in any way liable to payment of any
compensation to the estate of deceased Contractor and/or to the surviving partners of the
Contractor’s firm on account of the cancellation of the Contract. The decision of the Company
that the legal representatives of the deceased Contractor or surviving partners of the
Contractor’s firm cannot carry out and complete the Contract shall be final and binding on the
parties. In the event of such cancellation the Company shall not hold the estate of the deceased
Contractor and/or the surviving partners of the estate of the deceased Contractor and/or the
surviving partners of the Contractor’s firm liable to damages for not completing the Contract.
The contract value extent of supply delivery dates, specifications as other relevant matters may be
altered by mutual agreement and if so altered shall not be deemed or constructed to mean and to effect
or alter other terms and conditions of the contract and the contract so altered or revised shall be and
shall always be deemed to have been subject without prejudice to and stipulation.
In witness where of the parties here to have set their hands and seal this day and month year first above
1. Signed sealed and delivered by for and on
Behalf of the presence of name and address.
2. Signed sealed and delivered by for and on behalf Of The Paschim Gujarat Vij
In consideration of the PASCHIM GUJARAT VIJ COMPANY LTD., herein after known as the
COMPANY having given contract for the work of
per A/T No. , dated and all future contract that may be awarded to me in the next one year and in
terms of the condition in clause 33 of the COMPANY’s tender and contract for work.
I residing at by this Bond bind myself responsible for and shall pay compensation to my workmen
payable under the workmen’s compensation ACT – 1923 (viii of 1923) hereinafter called the said Act
for death or injuries caused to the workmen engaged by this presents, if such compensation is paid by
the COMPANY as principal under such sub-section (1) of section 12 of the said Act on behalf of me,
to pay such amount of compensation on demand within 48 hours to the COMPANY that it might have
to spend as legal and other incidental charges in defending any suit or action arising out of the death of
injuries in regard to compensation paid to the workmen or heirs of the deceased workmen.
Now the condition of the above written Bond is such that any suit of action arising out of the death or
injuries to the workmen engaged by me. During the execution of work of said contract and all future
contracts that may be awarded to me in the next one year is filed by the worker against the COMPANY,
I shall imbrues to the
COMPANY such sum that the COMPANY is required to spend as legal and other incidental charges
in defending such suit or action and also the amount that may be ordered to be paid to the worker / or
his heirs as compensation and that the above written bind shall remain in full force and virtue till the
COMPANY is required to defend such suit or action filed by the workers and or heirs against the
COMPANY. Further it is applicable on death of contractor himself also. No any compensation will be
claimed by legal heirs of contractor.
Signature of the Executant
Technical Specifications
TECHNICAL SPECIFICATIONS FOR THE WORK TO BE CARRIED OUT For erection work
KV and L.T. Distribution lines and Transformer Centres
The work should be strictly as per specifications and approved designs of the PGVCL. The inferior
and unsatisfactory work is liable for rejection and to be rectified at the cost of contractor. The work
will have to be carried out as per programmed laid down by department and under the entire instruction
of engineer-in-Charge and contractor should employ supervisor who could supervise the works through
out and he should remain present on site. No tools & Tackles will be supplied by the department.
(A) Erection of HT and LT Lines:
Site clearing and tree branches trimming which come in the way of line will be done by the
contractor at his cost. The Company will assist the contractor in getting necessary permission for
tree cutting etc. Any claim for compensation in above respect will have to be borne by contractor.
(B) Fixing: Pole Position:
The Points of pole structures, guys and earthing will be fixed by the department and will be shown
to the contractor. He should adhere to these locations in all circumstances unless directed by the
department to make any change. The Poles from One site to other site or at proposed locations must
be carted by loading on Tractor or Hand-Cart. The Poles shall not be carted by toeing/Dragging
with Tractor or Cart or with any other means.
(C) Pole setting:
Where poles are set in good solid ground the depth of pit shall be 1/6th of the height of the pole and
for grounds of any other nature. The pit must be size of 2 X 2 X 5 feet. The poles and guys must not
be set at the edge of cuts/at shore/embankment where the soil is liable to be washed or eroded out
of such setting should be avoided. While back filling, earth must be packed tight and in no case
earth be dumped to greater depth more than four inches without being rammed, hard before the next
layer is thrown in. Extra earth should be packed around the poles and rammed.
The cost of damage done to the pole during erection will be recoverable from the contractor. No
pole, which is out of plumb or out of alignment shall be accepted. The pole will be in his safe
custody till erected and he is liable to compensate to the Company the full cost of pole along with
supervision charges, if the pole is broken during erection, or stolen from his custody. He should be
able to render full account of the poles entrusted to him whenever the Supervising Officer demands
to scrutinizes the same.
(D) Erection of Complete single Pole Structure
Erection of single pole structure comprises of shifting of pole from the stacking place in the village,
excavation of pit, erection in position (with base plate where required), of 8/10 meter PSC poles /
to 13 meter Steel Pole or any other suitable pole, fitting of clamps and cross arms and fabricated
materials, fixing of caution board, anti-climbing device etc. complete as per drawing and
specification inclusive of painting, numbering. Generally vertical formation will be used on each
pole. However horizontal formation will have to be used in special circumstances as per instruction
at Engineer in change.
Sign & Stamp of the Bidder
(E) Double Pole (D. P.) Structure
Double poles structure such as for HT line tapping, Railway crossing, any other HT/LT or telephone
line crossing, terminal structure for distribution transformer centre comprises of Excavation suitable
pits and refilling of earth, erection in position of two Nos. of 8/10 meter PSC poles / 9 to 13 meter
Steel Pole or any other suitable pole, fitting of clamps, cross arms, bracing cross arm bracing etc.
as per drawing/ standards with mounting D.O. fuses/A.B. switches/HT metering equipment’s etc.,
painting, Pole numbering, fixing of caution Board and anti-climbing devices.
The D.P. must be properly aligned and must be in plumb. Special structure if included will be erected
as per drawing supplied. Each Shackle Points must have “D” type Jumpers only.
(F) Stringing of conductors
This includes stringing of stranded and solid bare conductor with fitting of necessary HT/LT pin
and strain insulators, binding on insulators, jumpers, the jointing in HT line will be done by twisting
sleeve joints as per standard practice. Care must be taken in handling the conductor to protect against
cuts, scratches or kinks. The conductor must not be drawn over rough or rocky ground, when it is
liable to be damaged. AAA/ACSR conductors must be drawn on wooden or aluminium pulley only.
Wastage and cutting should be avoided as far as possible. Not more than 3 % sag will be accepted
in the materials account. The sag and spans will be maintained as per drawing/standard. The cross
arms insulators must be so fixed that neither tilts nor bands from position. The sagging should be
uniform for all conductors and uneven sagging will not be allowed. The ground clearance to be
maintained as per IE Rules 2010 Clause No. 58 as mentioned below.
For lines of voltage not exceeding 650 Volts 5.8 Meters
Across a street
For lines of voltage exceeding 650 Volts but not
exceeding 33 kV
For lines of voltage not exceeding 650 Volts 5.5 Meters
street For lines of voltage exceeding 650 Volts but not
exceeding 33 kV
If bare - 4.6 Meter
Elsewhere than For lines of voltage up to and including
along or 11,000 Volts
street For lines of voltage exceeding 11,000 Volts but
not exceeding 33 kV
An overhead line shall not cross over an existing building as far as possible and no building
shall be constructed under an existing overhead line.
Where an overhead line of voltage not exceeding 650 V passes above or adjacent to or
terminates on any building, the following minimum clearances as per IE Rules 2010 Clause
No. 60 from any accessible point, on the basis of maximum sag, shall be observed, namely:-
(i) for any flat roof, open balcony, varandah roof and lean-to-roof and Pitched Roof
(a) When the line passes above the building a vertical clearance of highest part of building
immediately under such line 2.5 meters from the highest point,
(b) When the line passes adjacent to the building a horizontal clearance of 1.2 meters from the
Sign & Stamp of the Bidder
(ii) Where an overhead line of voltage exceeding 650 V passes above or adjacent to or terminates
on any building, the following minimum clearances as per IE Rules 2010 Clause No. 61 from
any accessible point, on the basis of maximum sag, shall be observed, namely:-
(a) when the line passes having voltage 650 V and up to and including 33000 V above the
building a vertical clearance of highest part of building immediately under such line
meters from the highest point,
(b) When the line having voltage 650 V and up to and including 11000 V passes adjacent to the
building a horizontal clearance between nearest Conductor and any part of such building on
the basis of maximum deflection of wind must be
(iii) Minimum clearances in meters between lines crossing each other as per IE 2010 Clause No.
Nominal System 110-132 kV
1 Low and Medium 2.44 3.05 4.58 5.49
In case of illegal construction / structure on the line under erection, the same is to be put in
written notice to the Engineer-In-charge.
(G) Erection of Stay Set:
The erection of stay set comprises of anchor rod, turn buckle, eye bolt and excavation of suitable
pit size of 2 X 2 X 5 foot, fixing of stay clamp on pole, binding of GI stay wire. The stay insulators
must be inserted in the stay wire on all stays as per drawing. The wrapping of the Guy wire strands
at both ends the stay insulator must be even and must presents neat appearance and good
workmanship. No stay should be left loose but should be tight and straight to withstand in say
cyclone or sand storm, the item includes refilling of earth and painting of fabrication material. If
stays are not required to be concreted, a pre casted cement concrete block will be supplied by the
department from his division store which the contractor will have to transport at his own cost to
the site of work and will have to use for fixing of anchor rod at site.
A pits of 2 X 2 X 5 foot is to be dig about 4 foot away from the pole on which earthing is required to
be carried out. The earthing pipe/earthing plate/earthing coil supplied by the company shall be used as
per specification and drawing. GI wire no. 8 SWG for earthing should be bolted with earthing
pipe/earthing plate/earthing coil. G. I. Wire must be passed through PVC rigid Pipe which must be
buried at least 0.5 Meter in ground and to be kept 2.0 Meters above ground along the Pole. The earthing
are to be done at place as indicted in the pole schedule or as selected by the field Engineer. The coke
and salt will have to be supplied by the contractor at his cost. Erection of earthing should be carried
out under the supervision of the Engineer in charge or nominated Supervisors. At least 20 KG of salt
and 20 KG of coal per earth on alternate layers (as per drawing) will be used by contractor. No amount
will be paid if the work is not done in accordance with these specification.
The guarding will have to provide at crossing of lines, telephone line crossing, road crossing and any
accident prone places as indicated by the Engineer in Charge. The work comprises of fixing of guard cross
arms, eye bolts, guard cradle as per design, GI cross lacing wires complete. Any special type of guarding
if required will be designed by the department. Binding cross arms must be used where the HT line crosses
the road. The ground clearance, line to line clearances etc. to be maintained as per IE Rules 2010 69 and
70. The poles for road crossing may be concreted as instructions of the Engineer In- charge. The work has
to be carried out as instructions of the Engineer In-charge. Date:
Sign & Stamp of the Bidder (J)
Painting and Numbering:
Rail poles and girder poles shall be given one coat of approved red-lead paint and two coats of
approved aluminium paint. All fabricated material will also be painted with two coats of approved
aluminium paint and there should be sufficient interval between every coat of painting in order to
allow for drying. The bolts and must shall be dipped in anticorrosive oil before insertion. The
lower portion of steel poles up 3 foot above ground level shall be cleaned of all dust and rust. This
surface should be given a base coat of red lead and an additional coat of black bituminous paint
before inserting in the ground. The good quality paint will be supplied by the contractor and should
be of I.S.I mark and will be got approved from Executive Engineer, prior to starting work.
Name of the feeder and pole number has to be written on all the poles in English/Gujarati as per
instruction of Engineer In-charge. The colour of back ground and name/number must be of contras
colour. Prior to apply Colour for Numbering on P.S.C poles, it should be properly cleaned and all
accumulations of earth, dirt etc.
should be removed.
(K) Concreting:
Unless Specified concreting is to be done for Girder Poles/Guys only. No any PSC Pole/Guys to
be concreted without any special reason. The Concreting of PSC Poles must be approved by
concerned Executive Engineer prior to execution as per Tender Condition mentioned under
Section III Clause No. 2 and sub clause No. 8. Certificates for special Reason and approvals must
be submitted with detail Bill.
Cement concrete for any pole / stay should be carried out as per specification given by Engineer
In-Charge as and where required. Concreting should be with one part of cement, two part of
specified quality sand and four parts of well burnt Brice bats (1:2:4). The mixture should be
prepared on GI sheet and should be free from the dust. Cement, river sand and metal should be
used by contractor at his own cost. The finishing coat of cement plaster shall be applied on outer
surface Concreting and boxing for smoothness.
The normal size of concreting of pole shall be 2 X 2 X 2 Feet (0.226 cmt) & that for stay 2 x 2x
Feet (0.113 cmt). In case of Boxing for pole, it shall be 18” dia. x 3 feet (h) (2’ above and 1' below
ground) (0.15 cmt).
(L) Distribution Transformer Centre:
The distribution transformer centre (10 KVA to 200 KVA) will be of outdoor type on two poles
structures as per standard drawing and 5 KVA Transformers are to be on Single Pole. This work
include erection of special two pole structure as per Item No. 2 and fixing of all fabricated material
for support of line, L.A., HG Fuse/AB Switch, Transformer, LT Dist. Box, cable wiring, anti-
climbing devices etc. The works includes of transportation and hoisting of transformer, numbering
and painting of all fabricated materials. For transformer having capacity of 100 KVA and above
MS channel shall be utilize which will be supplied by the company. Three Earthing are to be
provided on each Transformers.
1) Earthing of LA on One side.
2) Earthing of all Metal Parts from Top angle and Transformer Body and Dist. Box on other side.
3) For neutral, two separate Earth wire on both side of Transformer and to be common at ground.
All three earthing are to be done as in Delta Formation as shown in the attached Drawing. All
earthing wires are to be connected by proper size of lug and bolted at each earthing points properly.
The Earthing of Transformer Body must be done with lug only.
Sign & Stamp of the Bidder
Looping or winding with Earthing Bolt on Transformer Body is not allowed. Earthing wire Lugs
are to be brought by Contractors. No any extra cost will be paid for this material.
Extra payment for hard soil or rock is payable as per SOR as per committee report to be formed to
decide hard soil or rock which shall consists of Concerned SDO, Deputy Engineer (Tech) and
Executive Engineer.
The cost of damage done to the transformer while erection/Transportation is recoverable from
Before starting the work (new, alteration or addition) and during the works the contractor must
obtain line clear wherever necessary for the concerned officer of this office of other Office. For
any damage done to the Men, Materials and/or property due to non-observance of rules, the
contractor will be solely responsible.
Sign & Stamp of the Bidder
Check-list for Work Cross Verification
Sr. No. Check list for work as per specification Comment
1 Pole pit up to mark
2 Pole earthing with pipe end buried under ground
3 MS Fabrication as per drawing
4 Structure Alignment (Pole/DP), Pole facing
5 Pin Insulator bottom nut tightened
6 MS Fabrication painted with Red oxide + silver oxide coat
7 Proper stringing
No unsafe crossing and crossing with guarding/AB cable at road /
9 No double power on any structure
Proper Clearance as per norms with nearby structures, buildings,
Providing proper earthing in transformer(3 Nos. separate) and HT
line pole as per specification
Earthing wire of Transformer centre must be provided through
proper size of lugs
13 Tightening of Guy-set
14 S/S set as per drawing
15 Proper rating of DO fuse with alignment
Lightening arrester fixing with proper jumpering and earthing
17 Separate Delta earthing for DTC
Proper laying of incoming/outgoing LT cable from distribution box
to service pole of LT line
19 D-type jumpers
20 Breather in DTC
Arcing horns with "as is" clearance and position on transformer
22 Pole number painting
23 MCB of DTC must be properly installed
24 Nut-Bolt as per requirement and fastening with washer
25 Separate pole & earthing pits
26 Coal & salt as per specification for earthing
27 Credit of Conductor scrap
28 Credit of Scrap other materials
Name of scheme : Location/Feeder :
Cross verified by (Name, Design., Office) :
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
Tender 739 06.pdf
REVISED RATE.pdf
Bid.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].