Loading…
Loading…
Tender Value
₹1.3 Cr
EMD Value
₹1.3 L
Closing Date
16 Mar 2026, 5:00 pmClosed
Superintending Engineer, PR Circle, Krishna
Superintending Engineer, PR Circle, ZP Compound, Machilipatnam, Krishna
Package No.3 (4 Works) in Jaggaiahpeta Constituency Total Est.Cost Rs. 163.00 lakhs 1). Completion of incomplete of Anganwadi Building at Kakaravai village, Vatsavai (M) Est.Rs.8.00 lakhs 2) Construction of Sthree Shakthi Bhavan Building at Vatsavai (V)&(M) Est.Rs.80.00 lakhs 3) Construction of culvert in SC colony of Gopinenipalem village, Vatsavai (M) Est.Rs.25.00 lakhs 4) Construction of culvert on Muthyalamma temple road in Dabbakupalli village, Vatsavai (M) Est.Rs.50.00 lakhs
907018
NIT No 120/TO/2025-26, dt.21.02.2026 of Superintending Engineer, PR Circle, Krishna 3rd call
OPEN - NCB
Buildings
NTR, ANDHRA PRADESH
15 documents required · 14 mandatory · 1 optional
₹4,667
₹1.3 L
31 Mar 2026
28 Feb 2026
28 Feb 2026
Work 1 Completion of incomplete of Anganwadi Building at Kakaravai village, Vatsavai (M) Est.Rs.8.00 lakhs VRCC M 25 Design mix (Cement:fine aggregate: coarse aggregate) corresponding to Table 9 of IS 456 using 20- 10 mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including sales & other taxes on all materials including all operational, incidental and labour charges such as machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges, including centering, shuttering. etc., complete for finished item of work (APDSS No. 402) Including Overheads & Contractors Profit @ 13.615% etc.complete but exculding seigniorage charges & GST for Columns.
Work 1 VRCC M 25 Design mix (Cement:fine aggregate: coarse aggregate) corresponding to Table 9 of IS 456 using 20- 10 mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including sales & other taxes on all materials including all operational, incidental and labour charges such as machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges , including centering, shuttering. etc., complete for finished item of work (APDSS No. 402) Including Overheads & Contractors Profit @ 13.615% etc.complete but exculding seigniorage charges & GST for Roof beams.
Work 1 VRCC M 25 Design mix (Cement:fine aggregate: coarse aggregate) corresponding to Table 9 of IS 456 using 20- 10 mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including sales & other taxes on all materials including all operational, incidental and labour charges such as machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges ,including centering, shuttering. etc., complete for finished item of work (APDSS No. 402) Including Overheads & Contractors Profit @ 13.615% etc.complete but exculding seigniorage charges & GST for Roof slab 100mm thick.
Work 1 RCC M 25 Design mix (Cement:fine aggregate: coarse aggregate) corresponding to Table 9 of IS 456 using 20- 10 mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including sales & other taxes on all materials including all operational, incidental and labour charges such as machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges , including centering, shuttering. etc., complete for finished item of work (APDSS No. 402) Including Overheads & Contractors Profit @ 13.615% etc.complete but exculding seigniorage charges & GST for Lintels. Doors & Windows.
Work 1 RCC M 25 Design mix (Cement:fine aggregate: coarse aggregate) corresponding to Table 9 of IS 456 using 20- 10 mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including sales & other taxes on all materials including all operational, incidental and labour charges such as machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges ,Seigniorage charges including centering, shuttering. etc., complete for finished item of work (APDSS No. 402) Including Overheads & Contractors Profit @ 13.615% etc.complete but exculding seigniorage charges & GST for Sunshades (RCC)
Work 1 RCC M 25 Design mix (Cement:fine aggregate: coarse aggregate) corresponding to Table 9 of IS 456 using 20- 10 mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including sales & other taxes on all materials including all operational, incidental and labour charges such as machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges ,including centering, shuttering. etc., complete for finished item of work (APDSS No. 402) Including Overheads & Contractors Profit @ 13.615% etc.complete but exculding seigniorage charges & GST for Racks & Platforms (RCC)
Work 1 Masonry work in CM (1:8) prop with Flyash Cement solid blocks of size 290 x 225 x 140 mm for manufacturing of flyash solid blocks using flyash of 80 kgs, cement of 15 kgs. Gypsum of 5 kgs. and stone dust including cost and conveyance of all materials, labour charges, scaffolding and curing etc., complete with a compresive strength not lessthan 50 kg/sqm. Including Overheads & Contractors Profit @ 13.615% etc.complete but exculding seigniorage charges & GST for walls for Super structure.
Work 1 Providing impervious coat to exposed RCC roof slab surface with CM(1:3), 20mm thick with 1kg of water proof compound per bag of cement laid over roof when it is green including cost and conveyance charges of all materials excluding seigniorage charges and including all operational, incidental and labour charges for mixing mortar, laying, rendering smooth and thread lining, curing, rounding off junctions of wall and slab etc,, complete for finished item of work , Including Overheads & Contractors Profit @ 13.615% etc.complete but exculding seigniorage charges & GST
Work 1 Supply and fixing of Meadium Sal Wood Door of size 1.05 x 2.10 Mts. Including cost and conveyance of all materials, furniture, fittings and labour chargets. etc., complete.Including Overheads & Contractors Profit @ 13.615% etc.complete but exculding GST
Work 1 Supply and fixing of Medium Sal Wood Door of size 0.90 x2.10 Mts. Including cost and conveyance of all materials, furniture, fittings and labour chargets. etc., complete. Including Overheads & Contractors Profit @ 13.615% etc.complete but exculding GST
Work 1 Supply and fixing of Medium Sal Wood frame with Medium Sal Wood shutters Window fully pannelled of size 122 x 1.37 mts with all specificatied fixtures as per approved design including cost and conveyance of all materials, furniture, fittings and labour chargets. etc., complete.Including Overheads & Contractors Profit @ 13.615% etc.complete but exculding GST
Work 1 Supply and fixing of Medium Sal Wood frame with Medium Sal Wood shutters Window fully pannelled of size 0.75 x 0.91 mts with all specificatied fixtures as per approved design including cost and conveyance of all materials, furniture, fittings and labour chargets. etc., complete.Including Overheads & Contractors Profit @ 13.615% etc.complete but exculding GST
Work 1 Plastering with CM (1:5) 12mm thick including cost and conveyance of all materials and all labour charges.Including Overheads & Contractors Profit @ 13.615% etc.complete but exculding seigniorage charges & GST
Work 1 Celing Plastering with CM (1:5), 8 mm thick in single coat using screened sand including cost and conveyance of all materials like cement, sand, water etc., to site, all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, curing as directed by Engineer-in-charge etc Including Overheads & Contractors Profit @ 13.615% etc.complete but exculding seigniorage charges & GST
Work 1 Plain Cement Concrete corresponding to M5 grade as per IS 456 equivalent to (1:5:10) proportion nominal mix (cement: fine aggregate: Coarse aggregate) using 40mm size Hard Blasted Granite (IS383, 1970) metal from approved quarry including cost and conveyance of all materials like cement, sand, coarse aggregate, water etc. to site, including all operational, incidental, and labour charges such as mixing, laying and ramming concrete in layers in position not exceeding 15cm, finishing top surface, curing concrete, etc., complete (APSS No. 402) Including Overheads & Contractors Profit @ 13.615% etc.complete but exculding seigniorage charges & GST
Work 1 Flooring with Vertified tiles of 1st quality, set over base coat of cement mortar (1:8), 12 mm thick over CC bed already laid or RCC roof slab, including neat cement slurry of honey like consistency spread @ 3.3.kgs per sqm & jointed neatly with white cement paste to full depth mixed with pigment of matching shade, including cost and conveyance of all materials like cement, sand water and tiles etc., complete for finished item of work. Including Overheads & Contractors Profit @ 13.615% etc.complete but exculding seigniorage charges & GST
Work 1 Cost and supply of HYSD bars including cost and conveyane of work spot and fabrication charges to steel like cutting rods, tying grills in position including cost of wire etc., complete,Including Overheads & Contractors Profit @ 13.615% etc.complete but exculding seigniorage charges & GST
Work 2 Construction of Sthree Shakthi Bhavan Building at Vatsavai (V&M) Est.Rs.80.00 lakhs Earth work excavation for foundations and depositing on bank for all lifts and with an initial lead of 10m including all operational, incidental, labour charges such as shoring ,sheeting, planking, strutting, etc. complete for finished item of work including seigniorage excluding dewatering charges etc as per SS - 20 B (APSS 308).
Work 2 Filling with sand in trenches, sides of foundation and basement with intial lead in laers not exceeding 15cm thick, consolidating each deposited layer by watering and ramming including cost and conveyance of water to work site and all operational, incidential, labour charges, hire charges of T&P etc,. complete for finished item of work (APSS NO.309 and 310).
Work 2 Plain Cement Concrete corresponding to M7.5 grade as per IS 456 equivalent to (1:4:8) proportion nominal mix (cement: fine aggregate: Coarse aggregate) using 40mm size Hard Blasted Granite (IS383, 1970) metal from approved quarry including cost and conveyance of all materials like cement, sand, coarse aggregate, water etc. to site, including all operational, incidental, and labour charges such as mixing, laying and ramming concrete in layers in position not exceeding 15cm, finishing top surface, curing concrete, etc., complete for Foundations (APSS No. 402)
Work 2 VRCC M25 Supply and placing of the Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER/MIXER with 20-10mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregated (sand) coarse aggregate, water etc., tosite and including sales & othr taxes on all materials includign all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc., complete but excludign cost of steel and its fabrictaion chrages for finished item of work (APSS No. 402) with minimum cement content as per IS code from standard suppliers approved by the department includign pumping, centering, shuttering, laying concrete, vibrating, curing Including Overheads & Cotractors Profit @13.615/100etc., complete but excluding cost of steel and its fabrication charges for finished item of work for Footings
Work 2 VRCC M25 Supply and placing of the Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER/MIXER with 20-10mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregated (sand) coarse aggregate, water etc., tosite and including sales & othr taxes on all materials includign all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc., complete but excludign cost of steel and its fabrictaion chrages for finished item of work (APSS No. 402) with minimum cement content as per IS code from standard suppliers approved by the department includign pumping, centering, shuttering, laying concrete, vibrating, curing Including Overheads & Cotractors Profit @13.615/100etc., complete but excluding cost of steel and its fabrication charges for finished item of work for Pedestral
Work 2 VRCC M25 Supply and placing of the Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER/MIXER with 20-10mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregated (sand) coarse aggregate, water etc., tosite and including sales & othr taxes on all materials includign all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc., complete but excludign cost of steel and its fabrictaion chrages for finished item of work (APSS No. 402) with minimum cement content as per IS code from standard suppliers approved by the department includign pumping, centering, shuttering, laying concrete, vibrating, curing Including Overheads & Cotractors Profit @13.615/100etc., complete but excluding cost of steel and its fabrication charges for finished item of work for Plinth Beams
Work 2 VRCC M25 Supply and placing of the Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER/MIXER with 20-10mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregated (sand) coarse aggregate, water etc., tosite and including sales & othr taxes on all materials includign all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc., complete but excludign cost of steel and its fabrictaion chrages for finished item of work (APSS No. 402) with minimum cement content as per IS code from standard suppliers approved by the department includign pumping, centering, shuttering, laying concrete, vibrating, curing Including Overheads & Cotractors Profit @13.615/100etc., complete but excluding cost of steel and its fabrication charges for finished item of work for Columns Ground Floor
Work 2 VRCC M25 Supply and placing of the Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER/MIXER with 20-10mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregated (sand) coarse aggregate, water etc., tosite and including sales & othr taxes on all materials includign all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc., complete but excludign cost of steel and its fabrictaion chrages for finished item of work (APSS No. 402) with minimum cement content as per IS code from standard suppliers approved by the department includign pumping, centering, shuttering, laying concrete, vibrating, curing Including Overheads & Cotractors Profit @13.615/100etc., complete but excluding cost of steel and its fabrication charges for finished item of work for Lintels:
Work 2 VRCC M25 Supply and placing of the Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER/MIXER with 20-10mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregated (sand) coarse aggregate, water etc., tosite and including sales & othr taxes on all materials includign all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc., complete but excludign cost of steel and its fabrictaion chrages for finished item of work (APSS No. 402) with minimum cement content as per IS code from standard suppliers approved by the department includign pumping, centering, shuttering, laying concrete, vibrating, curing Including Overheads & Cotractors Profit @13.615/100etc., complete but excluding cost of steel and its fabrication charges for finished item of work for Sunshades
Work 2 VRCC M25 Supply and placing of the Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER/MIXER with 20-10mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregated (sand) coarse aggregate, water etc., tosite and including sales & othr taxes on all materials includign all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc., complete but excludign cost of steel and its fabrictaion chrages for finished item of work (APSS No. 402) with minimum cement content as per IS code from standard suppliers approved by the department includign pumping, centering, shuttering, laying concrete, vibrating, curing Including Overheads & Cotractors Profit @13.615/100etc., complete but excluding cost of steel and its fabrication charges for finished item of work for Roof Beams:
Work 2 VRCC M25 Supply and placing of the Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER/MIXER with 20-10mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregated (sand) coarse aggregate, water etc., tosite and including sales & othr taxes on all materials includign all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc., complete but excludign cost of steel and its fabrictaion chrages for finished item of work (APSS No. 402) with minimum cement content as per IS code from standard suppliers approved by the department includign pumping, centering, shuttering, laying concrete, vibrating, curing Including Overheads & Cotractors Profit @13.615/100etc., complete but excluding cost of steel and its fabrication charges for finished item of work for Roof Slabof 125mm thick
Work 2 VRCC M25 Supply and placing of the Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER/MIXER with 20-10mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregated (sand) coarse aggregate, water etc., tosite and including sales & othr taxes on all materials includign all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc., complete but excludign cost of steel and its fabrictaion chrages for finished item of work (APSS No. 402) with minimum cement content as per IS code from standard suppliers approved by the department includign pumping, centering, shuttering, laying concrete, vibrating, curing Including Overheads & Cotractors Profit @13.615/100etc., complete but excluding cost of steel and its fabrication charges for finished item of work for Waist Slab of 175mm thick:
Work 2 Filling with useful available excavated earth (excluding rock) with a lead of 50 m in trenches, sides of foundations with initial lead in layers not exceeding 15cm thick, watering and ramming including cost and conveyance of water to work site and all operaitonal, incidental, labour charges, hire charges of T&P etc., and overheads & contractors profit complete for fnished item of work (APSS NO.309&310)
Work 2 Plain Cement Concrete corresponding to grade as per IS 456 equivalent to (1:6:10) proportion nominal mix (cement: fine aggregate: Coarse aggregate) using 40mm size Hard Blasted Granite (IS383, 1970) metal from approved quarry including cost and conveyance of all materials like cement, sand, coarse aggregate, water etc. to site, including all operational, incidental, and labour charges such as mixing, laying and ramming concrete in layers in position not exceeding 15cm, finishing top surface, curing concrete, etc., complete for Foundations (APSS No. 402)
Work 2 Supply and placing of the PCC M20 Grade Nominal Mix Concrete corresponding to Table 9 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (fine sand(unscreened)) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402)with minimum cement content as per IS code from standard suppliers approved by the department including pumping, centering, shuttering, laying concrete, vibrating, curing etc. complete but excluding cost of steel and its fabrication charges for finished item of work.
Work 2 Masonry work in CM (1:6) prop with Flyash Cement solid blocks of size 290 x 225 x 140 mm for manufacturing of flyash solid blocks using flyash of 80 kgs, cement of 15 kgs. Gypsum of 5 kgs. and stone dust including cost and conveyance of all materials, labour charges, seiniorage charges, scaffolding and curing etc., cpomplete with a compresive strength not lessthan 50 kg/sqm for walls for Basement
Work 2 Masonry work in CM (1:8) prop with Flyash Cement solid blocks of size 290 x 225 x 140 mm for manufacturing of flyash solid blocks using flyash of 80 kgs, cement of 15 kgs. Gypsum of 5 kgs. and stone dust including cost and conveyance of all materials, labour charges, seiniorage charges, scaffolding and curing etc., cpomplete with a compresive strength not lessthan 50 kg/sqm for walls for Superstructure Walls
Work 2 OrnamentalPlastering with CM (1:5)20mm thick including cost and conveyance of all materials and all labour charges etc., complete for superstructure -10Sqm
Work 2 Plastering with CM (1:5) 12mm thick including cost and conveyance of all materials and all labour charges etc., complete for superstructure -10Sqm
Work 2 Flooring with vitrified tiles of 1st quality, set over base coat of cement mortar (1:8), 12 mm thick over CC bed already laid or RCC roof slab, including neat cement slurry of honey like consistency spread @ 3.3.kgs per sqm & jointed neatly with white cement paste to full depth mixed with pigment of matching shade, including cost of all materials like cement, sand water and tiles etc., complete, for finished item of work, but excluding the cost of conveyance of all materials.
Work 2 Providing skirting to internal walls to 15 cm height/risers of steps with Vitrified tiles length equal to flooring stones, set over base coat of CM (1:5) 12 mm thick with cement slurry of honey like consistency spread at the rate of 3.30 kgs per sqm and jointed with white cement paste mixed with pigment of matching shade to full depth, including cost of all materials like stone, cement, sand and water etc., complete excluding seigniorage charges, etc., complete for finished item of work
Work 2 Flooring with ceramic tiles, set over base coat of cement mortar (1:8), 12 mm thick over CC bed already laid or RCC roof slab, including neat cement slurry of honey like consistency spread @ 3.3.kgs per sqm & jointed neatly with white cement paste to full depth mixed with pigment of matching shade, including cost and conveyance of all materials like cement, sand water and tiles etc., complete, excluding seigniorage charges, etc., complete for finished item of work
Work 2 Dadooing to walls with coloured glazed tiles 1st. quality of any size of brand as approved by Engineer - in - charge and set over a base coat of CM (1:5), 12mm thick and neat cement paste at the rate of 3.3 Kg/Sqmt. and jointed with white cement paste mixed with pigment of matching shade including cost and conveyance of all materials like cement, fine sand (screened), water, tiles, etc. to site, sales and other taxes on all materials, C921 such as mixing of cement mortar, laying in position, curing, lift charges etc., complete excluding seigniorage charges for finished item of work (APSS No.701 & 707)
Work 2 Supply and fixing of Flush Door shutter of size 1.20 x 2.10mt with block board type with teak veneer on one face and commercial ply on another face-30 mm thick (conforming to IS:2202 of shubdwara), with frame made of well seasoned sal Wood scantlings of size 100 x 75mm including cost and conveyance of all materials and labour charges including Overheads & Cotractors Profit @13.615%etc. complete as per specifications (APSS NO.1001 & 1002)
Work 2 Supply and fixing of Flush Door shutter of size 1.05 x 2.10mt with block board type with teak veneer on one face and commercial ply on another face30 mm thick (conforming to IS:2202 of shubdwara), with frame made of well seasoned sal Wood scantlings of size 100 x 75mm including cost and conveyance of all materials and labour charges including Overheads & Cotractors Profit @13.615%etc. complete as per specifications (APSS NO.1001 & 1002)
Work 2 Door Frame section of 45x75 MM . The two Vertical members are to be joined together with the horizontal member using 8x50 MM long MS Star full thread screws to be used with reverse forward speed control hand drilling machine. The ready/assembled door frame is fixed to the wall using hold fast or bolt fasteners. A minimum of 4 No.s of screws to be provided for each vertical member & minimum 2no.s for horizontal member.
Work 2 Providing and fixing 28 -30 MM thick solid Wood Polymer Composite(WPC) single extruded door shutter with 3MM top and bottom rigid layer with an overall density of 750kg/Cum. It will be fixed to the frame using 3 inch /4 inch hinges. A minimum of 4 hinges will be required for fixing the door with the frame
Work 2 Providing and fixing factory made uPVC white colour sliding glazed windowupto 1.50 m in height dimension comprising of uPVC multi-chamberedframe with in-built roller track and sash extruded profiles duly reinforcedwith 1.60 ± 0.2 mm thick galvanized mild steel section made from rollforming process of required length (shape & size according to uPVCprofile), appropriate dimension of uPVC extruded glazing beads and uPVC extruded interlocks, EPDM gasket, wool pile, zinc alloy (whitepowder coated) touch locks with hook, zinc alloy body with single nylonrollers (weight bearing capacity to be 40 kg), G.I fasteners 100 x 8 mmsize for fixing frame to finished wall and necessary stainless steel screwsetc. Profile of frame & sash shall be mitred cut and fusion welded at allcorners, including drilling of holes for fixing hardware's and drainage ofwater etc. After fixing frame the gap between frame and adjacent finishedwall shall be filled with weather proof silicon sealent over backer rod ofrequired size and of approved quality, all complete as per approved drawing& direction of Engineer-in-Charge inclusive of cost of Single / double glass panes, wire mesh and silicon sealent . Note: For uPVC frame and sash extruded profiles minus 5% tolerancein dimension i.e. in depth & width of profile shall be acceptable.Variation in profile dimension in higher side shall be accepted. But no extra payment on this account shall be made, Three track three panels sliding window with fly proof SS wire mesh (Two nos. glazed & one no. wire mesh panels) made of (small series) frame 92 x 44 mm & sash 32 x 60 mmboth having wall thickness of 1.9 ± 0.2 mm and single glazingbead of appropriate dimension (Area of window upto 1.75 sqm).
Work 2 Painting to New walls with two coats of Plastic Emulsion paint of superior quality of approved brand and shade over base coat of cement primer grade -I making three coats in all to give an even shade after thoroughly brushing the surface to remove all loose powdered materials, including cost and conveyance of all materials, including cost and conveyance of all materials, cost of brushes, water to site, etc., sales & other taxes, all operational, incidental and labour charges such as scaffolding charges, lift charges, curing etc., complete for finished item of work in all floors for Walls.(APSS No. 911) in All Floors for exterior walls
Work 2 Painting to New walls with two coats of Plastic Emulsion paint of superior quality of approved brand and shade over base coat of cement primer grade -I making three coats in all to give an even shade after thoroughly brushing the surface to remove all loose powdered materials, including cost and conveyance of all materials, including cost and conveyance of all materials, cost of brushes, water to site, etc., sales & other taxes, all operational, incidental and labour charges such as scaffolding charges, lift charges, curing etc., complete for finished item of work in all floors for Walls.(APSS No. 911) in All Floors for interior walls
Work 2 Painting to New wood work with two coats of ready mixed synthetic enamel paint first quality all shades to give an even shade over base coat Primer with Luppam finishing after thoroughly brushing the surface to remove all remains including cost and conveyance of all materials to site, sales & other taxes, all operational, incidental and labour charges etc., complete for finished item of work.(3 coats) (APSS No. 1201 & 1212).in All Floors
Work 2 Cost and supply of MS Grills including cost and conveyance to work spot and fabrication charges of steel like cutting rods, welding grills placing in position etc., complete.
Work 2 Cost and supply of HYSD bars including cost and conveyance of work spot and fabrication charges fo steel like cutting rods, tying grills placing in position including cost of binding wire etc., complete.
Work 2 Providing 110 mm Dia ISI marked PVC down water take pipes with single socket , 2.5mm thick 4.0 kg/sq.cm pressure of ISI marked including cost of necessary PVC Bends, couplers, shoes, iron / PVC clamps and all other accessories and fixing in position including cost and conveyance of all materials, operational & incidental charges including all labour charges for fixing at site etc., complete for finished item of work. (APSS No. 1328)
Work 2 Construction of First Floor VRCC M25 Supply and placing of the Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER/MIXER with 20-10mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregated (sand) coarse aggregate, water etc., tosite and including sales & othr taxes on all materials includign all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc., complete but excludign cost of steel and its fabrictaion chrages for finished item of work (APSS No. 402) with minimum cement content as per IS code from standard suppliers approved by the department includign pumping, centering, shuttering, laying concrete, vibrating, curing Including Overheads & Cotractors Profit @13.615/100etc., complete but excluding cost of steel and its fabrication charges for finished item of work for Columns in First Floor
Work 2 VRCC M25 Supply and placing of the Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER/MIXER with 20-10mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregated (sand) coarse aggregate, water etc., tosite and including sales & othr taxes on all materials includign all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc., complete but excludign cost of steel and its fabrictaion chrages for finished item of work (APSS No. 402) with minimum cement content as per IS code from standard suppliers approved by the department includign pumping, centering, shuttering, laying concrete, vibrating, curing Including Overheads & Cotractors Profit @13.615/100etc., complete but excluding cost of steel and its fabrication charges for finished item of work for Lintels
Work 2 VRCC M25 Supply and placing of the Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER/MIXER with 20-10mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregated (sand) coarse aggregate, water etc., tosite and including sales & othr taxes on all materials includign all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc., complete but excludign cost of steel and its fabrictaion chrages for finished item of work (APSS No. 402) with minimum cement content as per IS code from standard suppliers approved by the department includign pumping, centering, shuttering, laying concrete, vibrating, curing Including Overheads & Cotractors Profit @13.615/100etc., complete but excluding cost of steel and its fabrication charges for finished item of work for Sunshades:
Work 2 VRCC M25 Supply and placing of the Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER/MIXER with 20-10mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregated (sand) coarse aggregate, water etc., tosite and including sales & othr taxes on all materials includign all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc., complete but excludign cost of steel and its fabrictaion chrages for finished item of work (APSS No. 402) with minimum cement content as per IS code from standard suppliers approved by the department includign pumping, centering, shuttering, laying concrete, vibrating, curing Including Overheads & Cotractors Profit @13.615/100etc., complete but excluding cost of steel and its fabrication charges for finished item of work for Roof Beams:
Work 2 VRCC M25 Supply and placing of the Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER/MIXER with 20-10mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregated (sand) coarse aggregate, water etc., tosite and including sales & othr taxes on all materials includign all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc., complete but excludign cost of steel and its fabrictaion chrages for finished item of work (APSS No. 402) with minimum cement content as per IS code from standard suppliers approved by the department includign pumping, centering, shuttering, laying concrete, vibrating, curing Including Overheads & Cotractors Profit @13.615/100etc., complete but excluding cost of steel and its fabrication charges for finished item of work for Roof Slabof 125mm thick
Work 2 VRCC M25 Supply and placing of the Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER/MIXER with 20-10mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregated (sand) coarse aggregate, water etc., tosite and including sales & othr taxes on all materials includign all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc., complete but excludign cost of steel and its fabrictaion chrages for finished item of work (APSS No. 402) with minimum cement content as per IS code from standard suppliers approved by the department includign pumping, centering, shuttering, laying concrete, vibrating, curing Including Overheads & Cotractors Profit @13.615/100etc., complete but excluding cost of steel and its fabrication charges for finished item of work for Waist Slab of 175mm thick:
Work 2 Providing impervious coat to exposed RCC roof slab surface with CM(1:3), 20mm thick with 1kg of water proof compound per bag of cement laid over roof when it is green including cost and conveyance charges of all materials excluding seigniorage charges and including all operational, incidental and labour charges for mixing mortar, laying, rendering smooth and thread lining, curing, rounding off junctions of wall and slab etc,, complete for finished item of work
Work 2 Supply and placing of the PCC M20 Grade Nominal Mix Concrete corresponding to Table 9 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (fine sand(unscreened)) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402)with minimum cement content as per IS code from standard suppliers approved by the department including pumping, centering, shuttering, laying concrete, vibrating, curing etc. complete but excluding cost of steel and its fabrication charges for finished item of work for Stair case Steps.
Work 2 Masonry work in CM (1:8) prop with Flyash Cement solid blocks of size 290 x 225 x 140 mm for manufacturing of flyash solid blocks using flyash of 80 kgs, cement of 15 kgs. Gypsum of 5 kgs. and stone dust including cost and conveyance of all materials, labour charges, seiniorage charges, scaffolding and curing etc., cpomplete with a compresive strength not lessthan 50 kg/sqm for walls for Superstructure Walls
Work 2 OrnamentalPlastering with CM (1:5)20mm thick including cost and conveyance of all materials and all labour charges etc., complete for superstructure -10Sqm
Work 2 Plastering with CM (1:5) 12mm thick including cost and conveyance of all materials and all labour charges etc., complete for superstructure -10Sqm
Work 2 Flooring with vitrified tiles of 1st quality, set over base coat of cement mortar (1:8), 12 mm thick over CC bed already laid or RCC roof slab, including neat cement slurry of honey like consistency spread @ 3.3.kgs per sqm & jointed neatly with white cement paste to full depth mixed with pigment of matching shade, including cost of all materials like cement, sand water and tiles etc., complete, for finished item of work, but excluding the cost of conveyance of all materials.
Work 2 Providing skirting to internal walls to 15 cm height/risers of steps with Vitrified tiles length equal to flooring stones, set over base coat of CM (1:5) 12 mm thick with cement slurry of honey like consistency spread at the rate of 3.30 kgs per sqm and jointed with white cement paste mixed with pigment of matching shade to full depth, including cost of all materials like stone, cement, sand and water etc., complete excluding seigniorage charges, etc., complete for finished item of work
Work 2 Flooring with ceramic tiles, set over base coat of cement mortar (1:8), 12 mm thick over CC bed already laid or RCC roof slab, including neat cement slurry of honey like consistency spread @ 3.3.kgs per sqm & jointed neatly with white cement paste to full depth mixed with pigment of matching shade, including cost and conveyance of all materials like cement, sand water and tiles etc., complete, excluding seigniorage charges, etc., complete for finished item of work
Work 2 Dadooing to walls with coloured glazed tiles 1st. quality of any size of brand as approved by Engineer - in - charge and set over a base coat of CM (1:5), 12mm thick and neat cement paste at the rate of 3.3 Kg/Sqmt. and jointed with white cement paste mixed with pigment of matching shade including cost and conveyance of all materials like cement, fine sand (screened), water, tiles, etc. to site, sales and other taxes on all materials, C921 such as mixing of cement mortar, laying in position, curing, lift charges etc., complete excluding seigniorage charges for finished item of work (APSS No.701 & 707)
Work 2 Supply and fixing of Flush Door shutter of size 1.05 x 2.10mt with block board type with teak veneer on one face and commercial ply on another face30 mm thick (conforming to IS:2202 of shubdwara), with frame made of well seasoned sal Wood scantlings of size 100 x 75mm including cost and conveyance of all materials and labour charges including Overheads & Cotractors Profit @13.615%etc. complete as per specifications (APSS NO.1001 & 1002)
Work 2 Providing and fixing 28 -30 MM thick solid Wood Polymer Composite(WPC) single extruded door shutter with 3MM top and bottom rigid layer with an overall density of 750kg/Cum. It will be fixed to the frame using 3 inch /4 inch hinges. A minimum of 4 hinges will be required for fixing the door with the frame
Work 2 Door Frame section of 45x75 MM . The two Vertical members are to be joined together with the horizontal member using 8x50 MM long MS Star full thread screws to be used with reverse forward speed control hand drilling machine. The ready/assembled door frame is fixed to the wall using hold fast or bolt fasteners. A minimum of 4 No.s of screws to be provided for each vertical member & minimum 2no.s for horizontal member.
Work 2 Providing and fixing factory made uPVC white colour sliding glazed windowupto 1.50 m in height dimension comprising of uPVC multi-chamberedframe with in-built roller track and sash extruded profiles duly reinforcedwith 1.60 ± 0.2 mm thick galvanized mild steel section made from rollforming process of required length (shape & size according to uPVCprofile), appropriate dimension of uPVC extruded glazing beads and uPVC extruded interlocks, EPDM gasket, wool pile, zinc alloy (whitepowder coated) touch locks with hook, zinc alloy body with single nylonrollers (weight bearing capacity to be 40 kg), G.I fasteners 100 x 8 mmsize for fixing frame to finished wall and necessary stainless steel screwsetc. Profile of frame & sash shall be mitred cut and fusion welded at allcorners, including drilling of holes for fixing hardware's and drainage ofwater etc. After fixing frame the gap between frame and adjacent finishedwall shall be filled with weather proof silicon sealent over backer rod ofrequired size and of approved quality, all complete as per approved drawing& direction of Engineer-in-Charge inclusive of cost of Single / double glass panes, wire mesh and silicon sealent. Note: For uPVC frame and sash extruded profiles minus 5% tolerancein dimension i.e. in depth & width of profile shall be acceptable.Variation in profile dimension in higher side shall be accepted. But no extra payment on this account shall be made. Three track three panels sliding window with fly proof SS wire mesh (Two nos. glazed & one no. wire mesh panels) made of (small series) frame 92 x 44 mm & sash 32 x 60 mmboth having wall thickness of 1.9 ± 0.2 mm and single glazingbead of appropriate dimension (Area of window upto 1.75 sqm).
Work 2 Painting to New walls with two coats of Plastic Emulsion paint of superior quality of approved brand and shade over base coat of cement primer grade -I making three coats in all to give an even shade after thoroughly brushing the surface to remove all loose powdered materials, including cost and conveyance of all materials, including cost and conveyance of all materials, cost of brushes, water to site, etc., sales & other taxes, all operational, incidental and labour charges such as scaffolding charges, lift charges, curing etc., complete for finished item of work in all floors for Walls.(APSS No. 911) in All Floors for exterior walls
Work 2 Painting to New walls with two coats of Plastic Emulsion paint of superior quality of approved brand and shade over base coat of cement primer grade -I making three coats in all to give an even shade after thoroughly brushing the surface to remove all loose powdered materials, including cost and conveyance of all materials, including cost and conveyance of all materials, cost of brushes, water to site, etc., sales & other taxes, all operational, incidental and labour charges such as scaffolding charges, lift charges, curing etc., complete for finished item of work in all floors for Walls.(APSS No. 911) in All Floors for interior walls
Work 2 Painting to New wood work with two coats of ready mixed synthetic enamel paint first quality all shades to give an even shade over base coat Primer with Luppam finishing after thoroughly brushing the surface to remove all remains including cost and conveyance of all materials to site, sales & other taxes, all operational, incidental and labour charges etc., complete for finished item of work.(3 coats) (APSS No. 1201 & 1212).in All Floors
Work 2 Cost and supply of MS Grills including cost and conveyance to work spot and fabrication charges of steel like cutting rods, welding grills placing in position etc., complete.
Work 2 Cost and supply of HYSD bars including cost and conveyance of work spot and fabrication charges fo steel like cutting rods, tying grills placing in position including cost of binding wire etc., complete.
Work 2 Providing 110 mm Dia ISI marked PVC down water take pipes with single socket , 2.5mm thick 4.0 kg/sq.cm pressure of ISI marked including cost of necessary PVC Bends, couplers, shoes, iron / PVC clamps and all other accessories and fixing in position including cost and conveyance of all materials, operational & incidental charges including all labour charges for fixing at site etc., complete for finished item of work. (APSS No. 1328)
Work 2 Construction of Head Room VRCC M25 Supply and placing of the Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER/MIXER with 20-10mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregated (sand) coarse aggregate, water etc., tosite and including sales & othr taxes on all materials includign all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc., complete but excludign cost of steel and its fabrictaion chrages for finished item of work (APSS No. 402) with minimum cement content as per IS code from standard suppliers approved by the department includign pumping, centering, shuttering, laying concrete, vibrating, curing Including Overheads & Cotractors Profit @13.615/100etc., complete but excluding cost of steel and its fabrication charges for finished item of work for Columns
Work 2 VRCC M25 Supply and placing of the Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER/MIXER with 20-10mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregated (sand) coarse aggregate, water etc., tosite and including sales & othr taxes on all materials includign all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc., complete but excludign cost of steel and its fabrictaion chrages for finished item of work (APSS No. 402) with minimum cement content as per IS code from standard suppliers approved by the department includign pumping, centering, shuttering, laying concrete, vibrating, curing Including Overheads & Cotractors Profit @13.615/100etc., complete but excluding cost of steel and its fabrication charges for finished item of work for Lintels
Work 2 VRCC M25 Supply and placing of the Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER/MIXER with 20-10mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregated (sand) coarse aggregate, water etc., tosite and including sales & othr taxes on all materials includign all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc., complete but excludign cost of steel and its fabrictaion chrages for finished item of work (APSS No. 402) with minimum cement content as per IS code from standard suppliers approved by the department includign pumping, centering, shuttering, laying concrete, vibrating, curing Including Overheads & Cotractors Profit @13.615/100etc., complete but excluding cost of steel and its fabrication charges for finished item of work for Roof Beams:
Work 2 VRCC M25 Supply and placing of the Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER/MIXER with 20-10mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregated (sand) coarse aggregate, water etc., tosite and including sales & othr taxes on all materials includign all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc., complete but excludign cost of steel and its fabrictaion chrages for finished item of work (APSS No. 402) with minimum cement content as per IS code from standard suppliers approved by the department includign pumping, centering, shuttering, laying concrete, vibrating, curing Including Overheads & Cotractors Profit @13.615/100etc., complete but excluding cost of steel and its fabrication charges for finished item of work for Roof Slabof 125mm thick
Work 2 Providing impervious coat to exposed RCC roof slab surface with CM(1:3), 20mm thick with 1kg of water proof compound per bag of cement laid over roof when it is green including cost and conveyance charges of all materials excluding seigniorage charges and including all operational, incidental and labour charges for mixing mortar, laying, rendering smooth and thread lining, curing, rounding off junctions of wall and slab etc,, complete for finished item of work
Work 2 Masonry work in CM (1:8) prop with Flyash Cement solid blocks of size 290 x 225 x 140 mm for manufacturing of flyash solid blocks using flyash of 80 kgs, cement of 15 kgs. Gypsum of 5 kgs. and stone dust including cost and conveyance of all materials, labour charges, seiniorage charges, scaffolding and curing etc., cpomplete with a compresive strength not lessthan 50 kg/sqm for walls for Superstructure Walls
Work 2 OrnamentalPlastering with CM (1:5)20mm thick including cost and conveyance of all materials and all labour charges etc., complete for superstructure -10Sqm
Work 2 Plastering with CM (1:5) 12mm thick including cost and conveyance of all materials and all labour charges etc., complete for superstructure -10Sqm
Work 2 Supply and fixing of Flush Door shutter of size 1.05 x 2.10mt with block board type with teak veneer on one face and commercial ply on another face30 mm thick (conforming to IS:2202 of shubdwara), with frame made of well seasoned sal Wood scantlings of size 100 x 75mm including cost and conveyance of all materials and labour charges including Overheads & Cotractors Profit @13.615%etc. complete as per specifications (APSS NO.1001 & 1002)
Work 2 Painting to New walls with two coats of Plastic Emulsion paint of superior quality of approved brand and shade over base coat of cement primer grade -I making three coats in all to give an even shade after thoroughly brushing the surface to remove all loose powdered materials, including cost and conveyance of all materials, including cost and conveyance of all materials, cost of brushes, water to site, etc., sales & other taxes, all operational, incidental and labour charges such as scaffolding charges, lift charges, curing etc., complete for finished item of work in all floors for Walls.(APSS No. 911) in All Floors for exterior walls
Work 2 Painting to New walls with two coats of Plastic Emulsion paint of superior quality of approved brand and shade over base coat of cement primer grade -I making three coats in all to give an even shade after thoroughly brushing the surface to remove all loose powdered materials, including cost and conveyance of all materials, including cost and conveyance of all materials, cost of brushes, water to site, etc., sales & other taxes, all operational, incidental and labour charges such as scaffolding charges, lift charges, curing etc., complete for finished item of work in all floors for Walls.(APSS No. 911) in All Floors for interior walls
Work 2 Painting to New wood work with two coats of ready mixed synthetic enamel paint first quality all shades to give an even shade over base coat Primer with Luppam finishing after thoroughly brushing the surface to remove all remains including cost and conveyance of all materials to site, sales & other taxes, all operational, incidental and labour charges etc., complete for finished item of work.(3 coats) (APSS No. 1201 & 1212).in All Floors
Work 2 Cost and supply of HYSD bars including cost and conveyance of work spot and fabrication charges fo steel like cutting rods, tying grills placing in position including cost of binding wire etc., complete.
Work 2 Electrification Supply and Fixing of 25mm dia 1.80 mm thick P.V.C. pipe (ISI MARK) concealed in wall with all required accessories including masonary work for light, fan and separate plug point with well seasoned wooden deep box including all labour charges etc., complete.
Work 2 Supply and Fixing of 25mm dia 1.8mm thick PVC pipe (ISI MARK) concealed in Roof Slabs with all required accessories including masonary work and labour charges etc., complete.
Work 2 Wiring with 2 runs of 14/0.3mm (1.0 Sq.mm) Fire Retardant (FR) P.V.C. insulated flexible copper cable (ISI MARK) in existing pipe with 6A switch, Ceiling rose and 3mm thick hylam sheet covering to switch control box including all labour charges etc., complete for light, bell, fan and exhaust fan points in Non-Residential Buildings
Work 2 Supply and Fixing of 16A 3pin and 6A 3pin plug socket with indicator lamp and 16A fuse unit and 16A switch control (5 in 1) duly recessed in wall with metal boxs, covered with modular cover frame including earth connections and all labour charges etc., complete.
Work 2 Supply and fixing of batten holder / slanting holder in lieu of ceiling rose of light point complete with all connections and all labour charges with 5W LED bulb (for new installation).
Work 2 Supply and run of 2 of 36/0.3mm (2.5 Sq.mm) F.R P.V.C. insulated flexible copper cable in existing pipe for mains inlcuding all labour charges etc., complete.
Work 2 Supply and run of 2 of 56/0.3mm (4 Sq.mm) FR P.V.C. insulated flexible copper cable in existing pipe for mains inlcuding all labour charges etc., complete.
Work 2 Providing independent earthling by excavating a trench to a depth of 2.1 M in all soils, as per size specified in the Data, using 40mm dia 'B' class GI pipe of 2.5 Mtrs length with necessary accessories with hume pipe ring duly providing staggered holes including filling with equal proportion of Salt and Charcoal in layers and all labour charges etc., complete for small quarters.
Work 2 Supply and run of 1 of 14 /0.3mm (1.0 Sq.mm) FR P.V.C. insulated flexible copper cable in existing pipe for earth continuity including all labour charges etc., complete.
Work 2 Supply and fixing of 6A 3 pin wall plug socket with 6A switch control on a common switch board with earth continuity including wire leads, earth connections along with all labour charges etc., complete.
Work 2 Supply and fixing of 20W, 2400 lumens, T8 not less than 1100 mm length LED retrofit tube light with aluminum anodized body, input voltage AC 220 - 260 Volts, having luminous efficacy >=100 lumens/ watt, with PF>0.9, surge protection: 2KV, THD<10%, with inbuilt driver and frosted cover CCT: 3000K-5700K, minimum CRI>70, etc., as per IS 10322 (Part 5/ Sec 1), 2012, complete with earth connection and not less than two years warranty. Makes: As per list of recommended brands as category I.ELEC-3.8.16
Work 2 Supply of 900 mm (36") / 1200 mm (48") / 1400 mm (56") sweep 230V, A.C 50 Hz.Ceiling fan with 3 Blades and double ball bearings with all standard accessories.
Work 2 Supply and erecting Stepped type regulator for ceiling fans 900/1200/1400mm sweep complete erected on existing board
Work 2 Supply and fixing SPN Distribution board with IP-30 protection suitable for single phase Earth Leakage Circute Braker (ELCB) / Residual Current Circute Braker (RCCB) / Double Pole (DP) Isolator as incomer and 10kA SP MCBs as out going including internal connections and labour charges for surface / flush mounting etc., complete.
Work 2 Supply and erecting, ISI mark submersible 1.0 HP,Single Phase 18stages pumpset suitable for 106 / 156mm dia borewell with high quality water resistant and dynamically balanced bronze impeller with stainless steel shaft sleeves, pump coupling and pivot of Single phase 250V, 50Hz.. A.C. power supply copper winding with water proof insulation and high precision strength
Work 2 Supply and Run of 2 of 2.5 Sq.mm WPSC (Whether Proof Single Core) Aluminium cable along with No.10 SWG G.I bearer wire through PVC cleats with all accessories including labour charges etc., complete for service mains.
Work 2 Drilling of Bore well by down the hole hammer drilling to a finished dia of 112/165 mm dia in all formations suitable for down the hole hammer drilling such as medium hard rock formation to hard rock formation, all consolidated formation etc. and drilling in over burden to dia not less than 200 mm etc and reaming the bore well to suit insertion of suitable casing pipe etc., including insertion of casing pipe with couplings, caps any other relevant materials upto required depth as directed by the department including transportation of drilling rigs and supporting vehicle and including bore development (Flushing of Bore Well at an average pressure of 150 PSI) conducting yield test, consumables charges, Crew charges required in fixation of pipe assembly completely done to the satisfaction of the department and including all labour charges but excluding all taxes, the cost of casing pipe, couplings, cap etc., The entire work should be carried out as per IS -2800 Part I & II 1979 and amended from time to time.
Work 2 Cost and Supply and fixing of Casing pipe 180mm dia PVC 6Kg/sq.cm inclduong cost and conveyance of all materials and all labour charges etc., completed
Work 2 Cost and Supply and fixing of Bore cap 180mm dia PVC 6Kg/sq.cm inclduong cost and conveyance of all materials and all labour charges etc., completed
Work 2 Supply and Transportation of Outer dia 50mm and Inner dia 38mm double walled corrugated HDPE duct made as per specification BSEN - 500 86/IS 14930 Part-II.Makes:DURA LINE (Dura Guard) or its equivalent mak
Work 2 Supply of 3 Core 2.5 Sqm Flat Copper cable of ISI for Submersible Motors confirming to IS:694:1990.
Work 2 Fabrication , transportation and supply of suitable size panel board for single phase submersible motor up to 1.5 HP consisting of relay, Contactor, starting and running capacitors, Voltmeter, Ammeter, indicator lamps, MCB , on/off switch including supply and fixing of DOL starter of make C&S/LTLK/ Seimens/ BCH/KSP(Karunya)/ Crompton
Work 2 Supply and Fixing of CPVC Pipe (22.20mm OD pipe-SDR 13.5) andd fittings to meet the requirement of ASTM-D 2846 and are produced in CTC(Copper Tube Size 1/2" ton 2" SDR 11 and SDR 13.5 pipes are made from idential CPVC compound
Work 2 Supply and Fixing of CPVC Pipe (28.60 mm OD pipe-SDR 13.5) andd fittings to meet the requirement of ASTM-D 2846 and are produced in CTC(Copper Tube Size 1/2" ton 2" SDR 11 and SDR 13.5 pipes are made from idential CPVC compound
Work 2 Providing & placing on Terrace polyethylene water storage tank with Double layer approved brand & manufacture with cover and suitable locking arrangement & making necessary holes for inlet & outlets and overflow pipes with all fittings including supply and fixing of 76.20mm dia PVC elbow 1st quality and 38.10mm dia PVC waste pipe outlet including coat and conveyance of all materials all labour charges etc. complete for finished item of work but excluding GST.
Work 2 Supply & fixing of tested NP bib taps at all levels of 12.70mm dia of Indian make first quality ( N.P bib tap indian make 300 g ) including cost & conveyance of all materials, labour charges for finished item of work complete for all floors
Work 2 Supplying and Fixing European ISI Water Closet of 1st quality conforming to IS:2556-Part-2-1973 ofwhite glazedwith 'P'trap
Work 2 Supplying & Fixing white glazed flat back half stall urinals 1st quality conforming to IS:2556-1995 with standard C.P. Spreader of overall size 95 x 95 x 57 mm conforming to IS:2556-Part6, Sec-6-1974 fixed with screws complete Indian make : 410 x 265 x 305 mm
Work 2 Supplying & Fixing Indian makeFlat Back Wash Hand Basin1st quality conforming to IS:2556-Part-4:1972 with waste fittings like rubber plug, chain,32 mm nominal size C.P. Fitting with parallel pipe thread conforming to IS:2963- 1979 and fitted with 15 mm nominal bore Chromium Plated Pillar Tap of 1st quality Indian make 400 grams Seiko/ Senior/ Nice/ Esso or equivalent complete with standard CI brackets including wooden block: 550 x 400 mm - Double C.P. Pillar cock
Work 3 Construction of culvert in SC colony of Gopinenipalem village, Vatsavai (M) Est.Rs.25.00 lakhs Earth work excavation for Structures as per drawing and technical specifications clause 305.1 including stting out , construction of shoring and bracing , removal of stumps and other deleterious material and disposal upto a lead of 50m' dressing of sides and bottom and backfilling in trenches with excavated suitable material as per technical Specifications complete for finished item of work excluding dewatering charges etc as per SS - 20 B (APSS 308) Including Overhead charges & Contractor's Profit @ 13.615% but excluding seigniorage charges & GST.
Work 3 Filling with sand in trenches, sides of foundation and basement with intial lead in layers not exceeding 15cm thick, consolidating each deposited layer by watering and ramming including cost and conveyance of water to work site and all operational, incidential, labour charges, hire charges of T&P etc,. complete for finished item of work (APSS NO.309 and 310) Including Overheads charges & Contractor's Profit @ 13.615% but excluding seigniorage charges & GST
Work 3 Providing concrete for plain concrete M10 in open foundations using 40 mm nominal size Graded hard stone aggregate, mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH Including Overhead charges & Contractor's Profit @ 13.615% but excluding seigniorage charges & GST
Work 3 Reinforced cement concrete M-25 Grade( Design Mix) using 20 & 10mm size graded HG Metal using Concre Mixer in foundations complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 and 1204 MORD and 1500, 1700 & 2200 MORTH excluding cost of steel Including Overhead charges & Contractor's Profit @ 13.615% but excluding seigniorage charges & GST -For Raft.
Work 3 Plain cement concrete M15 Nominal Mix in sub structures using 40 mm,20mm & 10mm nominal size Graded hard stone aggregate, mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH Including Overhead charges & Contractor's Profit @ 13.615% but excluding seigniorage charges & GST
Work 3 Reinforced cement concrete M-25 Grade( Design Mix) using 20 & 10mm size graded HG Metal using Concre Mixer in foundations complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 and 1204 MORD and 1500, 1700 & 2200 MORTH excluding cost of steel Including Overhead charges & Contractor's Profit @ 13.615% but excluding seigniorage charges & GST -For Side Walls
Work 3 Reinforced cement concrete M-25 Grade( Design Mix) using 20 & 10mm size graded HG Metal using Concre Mixer mixed in Superstructure complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 and 1204 MORD and 1500, 1700 & 2200 MORTH excluding cost of steel Including Overhead charges & Contractor's Profit @ 13.615% but excluding seigniorage charges & GST -For Slab
Work 3 Construction of sub grade using suitable local selected soil aggregate spreading in uniform layers with tractor mount appropriate grading arrangements on prepared surface, mixing by mix in place method at OMC and compaction with three wheel 80 -100 KN static roller capacity to achieve the desired density complete as per (Table 2.3 of IRC SP 77-2008) specificaions Including Overhead charges & Contractor's Profit @ 13.615% but excluding seigniorage charges & GST
Work 3 Construction of granular sub-base by providing well graded material / Close graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller 80-100 kN / Vibratory Roller to achieve the desired density, complete as per Technical Specification Clause 401 MORD / MORTH.Including Overhead charges & Contractor's Profit @ 13.615% but excluding seigniorage charges & GST
Work 3 Supplying, fitting, and placing HYSD bar reinforcement in superstructure complete as per drawing and technical specifications Clauses 1002, 1010 and 1202 MORD / 1600 MORTH, for Bars below 36 mm dia including over laps and wastage, where they are not welded Including Overhead charges & Contractor's Profit @ 13.615% but excluding GST
Work 3 Cost & Supply of MS Grills including Cost & Conveyance to work spot and Fabrication charges of steel like cutting Rods,Welding grills ,placing in position etc. complete Including Overhead charges & Contractor's Profit @ 13.615% but excluding GST
Work 4 Construction of culvert on Muthyalamma temple road in Dabbakupalli village, Vatsavai (M) Est.Rs.50.00 lakhs Earth work excavation for Structures as per drawing and technical specifications clause 305.1 including stting out , construction of shoring and bracing , removal of stumps and other deleterious material and disposal upto a lead of 50m' dressing of sides and bottom and backfilling in trenches with excavated suitable material as per technical Specifications complete for finished item of work excluding dewatering charges etc as per SS - 20 B (APSS 308) Including Overhead charges & Contractor's Profit @ 13.615% but excluding seigniorage charges & GST.
Work 4 Filling in foundation trenches as per drawing and technical specification Clause 305.3.9 MORD & 304 MORTH including cost and conveyance of water to work site and all operational, incidential, labour charges, hire charges of T&P etc,. complete for finished item of work Including Overheads charges & Contractor's Profit @ 13.615% but excluding seigniorage charges & GST
Work 4 Providing concrete for plain concrete M10 in open foundations using 40 mm nominal size Graded hard stone aggregate, mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH Including Overhead charges & Contractor's Profit @ 13.615% but excluding seigniorage charges & GST
Work 4 Reinforced cement concrete M-25 Grade( Design Mix) using 20 & 10mm size graded HG Metal using Concre Mixer in foundations complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 and 1204 MORD and 1500, 1700 & 2200 MORTH excluding cost of steel Including Overhead charges & Contractor's Profit @ 13.615% but excluding seigniorage charges & GST -For Raft.
Work 4 Plain cement concrete M15 Nominal Mix in sub structures using 40 mm,20mm & 10mm nominal size Graded hard stone aggregate, mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH Including Overhead charges & Contractor's Profit @ 13.615% but excluding seigniorage charges & GST
Work 4 Reinforced cement concrete M-25 Grade( Design Mix) using 20 & 10mm size graded HG Metal using Concre Mixer in foundations complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 and 1204 MORD and 1500, 1700 & 2200 MORTH excluding cost of steel Including Overhead charges & Contractor's Profit @ 13.615% but excluding seigniorage charges & GST -For Side Walls
Work 4 Reinforced cement concrete M-25 Grade( Design Mix) using 20 & 10mm size graded HG Metal using Concre Mixer mixed in Superstructure complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 and 1204 MORD and 1500, 1700 & 2200 MORTH excluding cost of steel Including Overhead charges & Contractor's Profit @ 13.615% but excluding seigniorage charges & GST -For Slab
Work 4 Construction of sub grade using suitable local selected soil aggregate spreading in uniform layers with tractor mount appropriate grading arrangements on prepared surface, mixing by mix in place method at OMC and compaction with three wheel 80 -100 KN static roller capacity to achieve the desired density complete as per (Table 2.3 of IRC SP 77-2008) specificaions Including Overhead charges & Contractor's Profit @ 13.615% but excluding seigniorage charges & GST
Work 4 Construction of granular sub-base by providing well graded material / Close graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller 80-100 kN / Vibratory Roller to achieve the desired density, complete as per Technical Specification Clause 401 MORD / MORTH.Including Overhead charges & Contractor's Profit @ 13.615% but excluding seigniorage charges & GST
Work 4 Supplying, fitting, and placing HYSD bar reinforcement in superstructure complete as per drawing and technical specifications Clauses 1002, 1010 and 1202 MORD / 1600 MORTH, for Bars below 36 mm dia including over laps and wastage, where they are not welded Including Overhead charges & Contractor's Profit @ 13.615% but excluding GST
Work 4 Cost & Supply of MS Grills including Cost & Conveyance to work spot and Fabrication charges of steel like cutting Rods,Welding grills ,placing in position etc. complete Including Overhead charges & Contractor's Profit @ 13.615% but excluding GST
stage.html
html • 0.01 MB
aoc.html
html • 0.01 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.01 MB
BOQ.xlsx
TENDER_DOCUMENT • 0.15 MB
DECLARATION.docx
TENDER_DOCUMENT • 0.02 MB
Package 3 (4 works) Schedule OK.xls
TENDER_DOCUMENT • 0.18 MB
SBD Road 2.doc
TENDER_DOCUMENT • 0.65 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .