Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹15.0 LAccepted-AOC | ₹15.0 L | L1 | Accepted-AOC L1 BIDDER |
| 2 | L2₹29.0 L+₹14.0 L (93.7%)Rejected-AOC 704 MASKAN APARTMENT SAIFEE PARK CHURCH ROAD MAROL ANDHERI E MUMBAI MAHARASHTRA 400059 | MUMBAI SUBURBAN | MAHARASHTRA | 400059 | ₹29.0 L+₹14.0 L (93.7%) | L2 | Rejected-AOC L2 BIDDER |
| 3 | L3₹38.0 L+₹23.0 L (153.8%)Rejected-AOC | ₹38.0 L+₹23.0 L (153.8%) | L3 | Rejected-AOC L3 BIDDER |
| 4 | L4₹43.0 L+₹28.1 L (187.6%)Rejected-AOC | ₹43.0 L+₹28.1 L (187.6%) | L4 | Rejected-AOC L4 BIDDER |
| 5 | L5₹57.7 L+₹42.8 L (286.1%)Rejected-AOC 701 7TH FLOOR LE MERIDIEN COMMERCIAL TOWER RAISINA ROAD NEW DELHI SOUTH DELHI DELHI 110019 | SOUTH EAST DELHI | DELHI | 110019 | ₹57.7 L+₹42.8 L (286.1%) | L5 | Rejected-AOC L5 BIDDER |
Tender Value
Refer Docs
Closing Date
8 Aug 2024, 2:00 pmClosed
DEPUTY GENERAL MANGER, SRM
Ship Repair Materials Department Cochin Shipyard Limited Kochi-682015 Kerala, India
TURNKEY JOB OF FIRE FIGHTING FOR NAVY VESSELS
2024_CSL_202554_1
CSL/SRM3/ADV075-076_1
Open Tender
Marine Services
Turn-key
180 days
Cochin
Please refer the tender documents
2 documents required · 2 mandatory
₹0
Exempted
3 Nov 2024
25 Jul 2024
9 Aug 2024
25 Jul 2024
8 Aug 2024
25 Jul 2024
25 Jul 2024 - 7 Aug 2024
Amount
Scope 1 - TURNKEY JOB OF FIRE FIGHTING FOR Navy Vessel 1 (RM.0788)
FOAM FIRE SMOOTHERING SYSTEM (CO 500) - MAIN ALLEWAY CARRY OUT OVERHAUL/ ROUTINES OF FOAM SMOOTHERINGTEMS AS FOLLOWS: -
RENEW HOSE REEL AS PER SAMPLE VIEW DETERIORATED MATERIAL CONDITION -(SERVICE COST)
RENEW HOSE REEL AS PER SAMPLE VIEW DETERIORATED MATERIAL CONDITION - (MATERIAL COST)
OVERHAUL AND CARRY OUT HYDRAULIC PRESSURE TEST (15 BAR) OF FOAM COMPOUND TANK. PT CERTIFICATE OF BOTTLES FROM PESO APPROVED FIRMS ONLY-(SERVICE COST) .
OVERHAUL AND CARRY OUT HYDRAULIC PRESSURE TEST (15 BAR) OF FOAM COMPOUND TANK. PT CERTIFICATE OF BOTTLES FROM PESO APPROVED FIRMS ONLY - (MATERIAL COST).
OVERHAUL, PAINT AND PRESSURE TEST H.P. AIR BOTTLE. PT CERTIFICATE OF BOTTLES FROM PESO APPROVED FIRMS ONLY -(SERVICE COST) .
OVERHAUL, PAINT AND PRESSURE TEST H.P. AIR BOTTLE. PT CERTIFICATE OF BOTTLES FROM PESO APPROVED FIRMS ONLY - (MATERIAL COST).
REPLACE FOAM GENERATOR AND ITS WIREMESH VIEW DETERIORATION -(SERVICE COST) .
REPLACE FOAM GENERATOR AND ITS WIREMESH VIEW DETERIORATION - (MATERIAL COST).
OVERHAUL HP AIR REDUCER. LAP WORKING SURFACES AND RENEW WORN PARTS AS NECESSARY -(SERVICE COST) .
OVERHAUL HP AIR REDUCER. LAP WORKING SURFACES AND RENEW WORN PARTS AS NECESSARY - (MATERIAL COST).
OVERHAUL, REFIT AND RESET RELIEF VALVE -(SERVICE COST) .
OVERHAUL, REFIT AND RESET RELIEF VALVE - (MATERIAL COST).
DISCAHRGE FOAM COMPOND FROM TANK AND WASH WITH CLEAN HOT WATER. AND BLOW THROUGH THE SIPHON PIPE -(SERVICE COST) .
DISCAHRGE FOAM COMPOND FROM TANK AND WASH WITH CLEAN HOT WATER. AND BLOW THROUGH THE SIPHON PIPE - (MATERIAL COST).
OVERHAUL AND REFIT SYSTEM VALVES. REPLACE ALL DEFECTIVE -(SERVICE COST)
OVERHAUL AND REFIT SYSTEM VALVES. REPLACE ALL DEFECTIVE - (MATERIAL COST)
REPLACE AND CALIBRATE PRESSURE GAUGES -(SERVICE COST) .
REPLACE AND CALIBRATE PRESSURE GAUGES - (MATERIAL COST).
CARRY OUT FUNCTIONAL CHECK OF FOAM COMPOUND TANK SAFETY VALVE -(SERVICE COST) .
CARRY OUT FUNCTIONAL CHECK OF FOAM COMPOUND TANK SAFETY VALVE - (MATERIAL COST).
OFFER SYSTEM TRIALS AS PER IN NORMS -(SERVICE COST) .
GT FIRE FIGHTING SYS. (DRY CHEMICAL) - AER/FER CARRY OUT OVERHAUL/ ROUTINES OF GT FIRE SMOOTHERING SYSTEMS IN BOTH ENGINE ROOMS AS FOLLOWS: -
DRAIN EXTINGUISHANT LIQUID FROM THE TANKS. CLEAN AND EXAMINE TANKS INTERNALLY FOR CORROSION. RENEW IF REQUIRED -(SERVICE COST)
DRAIN EXTINGUISHANT LIQUID FROM THE TANKS. CLEAN AND EXAMINE TANKS INTERNALLY FOR CORROSION. RENEW IF REQUIRED - (MATERIAL COST)
OVERHAUL PRESSURE REDUCERS. LAP THE WORKING SURFACES AND ELIMINATE AIR LEAKS. RENEW PARTS AS NECESSARY -(SERVICE COST) .
OVERHAUL PRESSURE REDUCERS. LAP THE WORKING SURFACES AND ELIMINATE AIR LEAKS. RENEW PARTS AS NECESSARY - (MATERIAL COST).
PRESURISE THE SYSTEM WITH AIR AND CHECK FOR LEAKS. RECTIFY DEFECTS IF ANY -(SERVICE COST) .
PRESURISE THE SYSTEM WITH AIR AND CHECK FOR LEAKS. RECTIFY DEFECTS IF ANY - (MATERIAL COST).
REPLACE AND RESET RELIEF VALVES -(SERVICE COST)
REPLACE AND RESET RELIEF VALVES - (MATERIAL COST)
CARRY OUT HYDRAULIC PRESSURE TEST OF CONTAINERS AT 150 KG/SQ CM PRESSURE -(SERVICE COST) .
CARRY OUT HYDRAULIC PRESSURE TEST OF CONTAINERS AT 150 KG/SQ CM PRESSURE - (MATERIAL COST).
REPLACE AND CARRY OUT FUNCTIONAL CHECKS OF SAFETY VALVES. RESET THE VALVE FOR REQUIRED SETTINGS -(SERVICE COST) .
REPLACE AND CARRY OUT FUNCTIONAL CHECKS OF SAFETY VALVES. RESET THE VALVE FOR REQUIRED SETTINGS - (MATERIAL COST).
DRAIN AIR BOTTLES. REMOVE THE CYLINDER HEAD CAPS AND EXAMINE BOTTLES INTERNALLY AND EXTERNALLY -(SERVICE COST) .
DRAIN AIR BOTTLES. REMOVE THE CYLINDER HEAD CAPS AND EXAMINE BOTTLES INTERNALLY AND EXTERNALLY - (MATERIAL COST).
REFILL TANKS WITH NEW EXTINGUISHANT -(SERVICE COST)
REFILL TANKS WITH NEW EXTINGUISHANT - (MATERIAL COST)
CALIBRATE PRESSURE GAUGES -(SERVICE COST) .
CALIBRATE PRESSURE GAUGES - (MATERIAL COST).
REPLACE AND PRESSURE TEST CONTAINER AND HP AIR BOTTLES AS PER SAMPLE AND REINSTALL. (QTY - 04 NO) -(SERVICE COST)
REPLACE AND PRESSURE TEST CONTAINER AND HP AIR BOTTLES AS PER SAMPLE AND REINSTALL. (QTY - 04 NO) - (MATERIAL COST)
PORTABLE FIRE FIGHTING EXTINGUISHERS - VARIOUS PLACES
CARRY OUT HYDRAULIC PRESSURE TESTING OF THE EXTINGUISHERS (EXCEPT CO2 EXTINGUISHERS) AT A PRESSURE OF 35 KG/CM2. THE PRESSURE OF 35 KG/CM2 IS TO BE BUILT-UP SLOWLY IN 1 MIN. AND MAINTAINED FOR 2.5 MINS. STAGGER THIS TEST SUCH THAT ATLEAST ONE-THIRD (1/3 RD) OF THE TOTAL EXTINGUISHERS ARE TESTED EVERY YEAR. RECHARGE/REFILL THE EXTINGUISHERS THEREAFTER. NOTE:- EXTINGUISHERS SHOULD BE HYDRAULICALLY TESTED WITH THE CAP FITTED. THERE SHALL NOT BE ANY LEAKAGE OR VISIBLE DISTORTION IN THE TEST AND EXTINGUISHERS WHICH FAIL THIS REQUIREMENT SHALL BE REPLACED -(SERVICE COST)
CARRY OUT HYDRAULIC PRESSURE TESTING OF THE EXTINGUISHERS (EXCEPT CO2 EXTINGUISHERS) AT A PRESSURE OF 35 KG/CM2. THE PRESSURE OF 35 KG/CM2 IS TO BE BUILT-UP SLOWLY IN 1 MIN. AND MAINTAINED FOR 2.5 MINS. STAGGER THIS TEST SUCH THAT ATLEAST ONE-THIRD (1/3 RD) OF THE TOTAL EXTINGUISHERS ARE TESTED EVERY YEAR. RECHARGE/REFILL THE EXTINGUISHERS THEREAFTER. NOTE:- EXTINGUISHERS SHOULD BE HYDRAULICALLY TESTED WITH THE CAP FITTED. THERE SHALL NOT BE ANY LEAKAGE OR VISIBLE DISTORTION IN THE TEST AND EXTINGUISHERS WHICH FAIL THIS REQUIREMENT SHALL BE REPLACED - (MATERIAL COST).
Scope 2 - TURNKEY JOB OF FIRE FIGHTING FOR Navy Vessel 2 (RM.0789)
FOAM FIRE SMOOTHERING SYSTEM (CO 500) MAIN ALLEWAY CARRY OUT OVERHAUL/ ROUTINES OF FOAM SMOOTHERINGTEMS AS FOLLOWS: -
RENEW HOSE REEL AS PER SAMPLE VIEW DETERIORATED MATERIAL CONDITION -(SERVICE COST)
RENEW HOSE REEL AS PER SAMPLE VIEW DETERIORATED MATERIAL CONDITION - (MATERIAL COST)
OVERHAUL AND CARRY OUT HYDRAULIC PRESSURE TEST OF FOAM COMPOUND TANK AT 15 BAR. PT CERTIFICATE OF BOTTLES FROM PESO APPROVED FIRMS ONLY-(SERVICE COST)
OVERHAUL AND CARRY OUT HYDRAULIC PRESSURE TEST OF FOAM COMPOUND TANK AT 15 BAR. PT CERTIFICATE OF BOTTLES FROM PESO APPROVED FIRMS ONLY - (MATERIAL COST).
OVERHAUL, PAINT AND PRESSURE TEST H.P. AIR BOTTLE. PT CERTIFICATE OF BOTTLES FROM PESO APPROVED FIRMS ONLY-(SERVICE COST)
OVERHAUL, PAINT AND PRESSURE TEST H.P. AIR BOTTLE. PT CERTIFICATE OF BOTTLES FROM PESO APPROVED FIRMS ONLY - (MATERIAL COST).
REPLACE FOAM GENERATOR AND ITS WIREMESH VIEW DETERIORATION-(SERVICE COST)
REPLACE FOAM GENERATOR AND ITS WIREMESH VIEW DETERIORATION - (MATERIAL COST).
OVERHAUL HP AIR REDUCER. LAP WORKING SURFACES AND RENEW WORN PARTS AS NECESSARY-(SERVICE COST)
OVERHAUL HP AIR REDUCER. LAP WORKING SURFACES AND RENEW WORN PARTS AS NECESSARY - (MATERIAL COST).
OVERHAUL, REFIT AND RESET RELIEF VALVE-(SERVICE COST)
OVERHAUL, REFIT AND RESET RELIEF VALVE - (MATERIAL COST).
DISCAHRGE FOAM COMPOND FROM TANK AND WASH WITH CLEAN HOT WATER. AND BLOW THROUGH THE SIPHON PIPE-(SERVICE COST)
DISCAHRGE FOAM COMPOND FROM TANK AND WASH WITH CLEAN HOT WATER. AND BLOW THROUGH THE SIPHON PIPE - (MATERIAL COST).
OVERHAUL AND REFIT SYSTEM VALVES. REPLACE ALL DEFECTIVE-(SERVICE COST)
OVERHAUL AND REFIT SYSTEM VALVES. REPLACE ALL DEFECTIVE - (MATERIAL COST)
REPLACE AND CALIBRATE PRESSURE GAUGES -(SERVICE COST)
REPLACE AND CALIBRATE PRESSURE GAUGES - (MATERIAL COST).
CARRY OUT FUNCTIONAL CHECK OF FOAM COMPOUND TANK SAFETY VALVE-(SERVICE COST)
CARRY OUT FUNCTIONAL CHECK OF FOAM COMPOUND TANK SAFETY VALVE - (MATERIAL COST).
OFFER SYSTEM TRIALS AS PER IN NORMS -(SERVICE COST)
CARRY OUT OVERHAUL/ ROUTINES OF GT FIRE SMOOTHERING SYSTEMS IN BOTH ENGINE ROOMS AS FOLLOWS: -
DRAIN EXTINGUISHANT LIQUID FROM THE TANKS. CLEAN AND EXAMINE TANKS INTERNALLY FOR CORROSION. RENEW IF REQUIRED-(SERVICE COST)
DRAIN EXTINGUISHANT LIQUID FROM THE TANKS. CLEAN AND EXAMINE TANKS INTERNALLY FOR CORROSION. RENEW IF REQUIRED - (MATERIAL COST)
OVERHAUL PRESSURE REDUCERS. LAP THE WORKING SURFACES AND ELIMINATE AIR LEAKS. RENEW PARTS AS NECESSARY-(SERVICE COST)
OVERHAUL PRESSURE REDUCERS. LAP THE WORKING SURFACES AND ELIMINATE AIR LEAKS. RENEW PARTS AS NECESSARY - (MATERIAL COST)
PRESURISE THE SYSTEM WITH AIR AND CHECK FOR LEAKS. RECTIFY DEFECTS IF ANY-(SERVICE COST)
PRESURISE THE SYSTEM WITH AIR AND CHECK FOR LEAKS. RECTIFY DEFECTS IF ANY - (MATERIAL COST).
REPLACE AND RESET RELIEF VALVES -(SERVICE COST)
REPLACE AND RESET RELIEF VALVES - (MATERIAL COST)
CARRY OUT HYDRAULIC PRESSURE TEST OF CONTAINERS AT 150 KG/SQ CM PRESSURE-(SERVICE COST)
CARRY OUT HYDRAULIC PRESSURE TEST OF CONTAINERS AT 150 KG/SQ CM PRESSURE - (MATERIAL COST).
REPLACE AND CARRY OUT FUNCTIONAL CHECKS OF SAFETY VALVES. RESET THE VALVE FOR REQUIRED SETTINGS-(SERVICE COST)
REPLACE AND CARRY OUT FUNCTIONAL CHECKS OF SAFETY VALVES. RESET THE VALVE FOR REQUIRED SETTINGS - (MATERIAL COST).
DRAIN AIR BOTTLES. REMOVE THE CYLINDER HEAD CAPS AND EXAMINE BOTTLES INTERNALLY AND EXTERNALLY-(SERVICE COST)
DRAIN AIR BOTTLES. REMOVE THE CYLINDER HEAD CAPS AND EXAMINE BOTTLES INTERNALLY AND EXTERNALLY - (MATERIAL COST).
REFILL TANKS WITH NEW EXTINGUISHANT-(SERVICE COST)
REFILL TANKS WITH NEW EXTINGUISHANT - (MATERIAL COST)
CALIBRATE PRESSURE GAUGES-(SERVICE COST)
CALIBRATE PRESSURE GAUGES - (MATERIAL COST).
REPLACE AND PRESSURE TEST CONTAINER AND HP AIR BOTTLES AS PER SAMPLE AND REINSTALL. (QTY - 04 NO)-(SERVICE COST)
REPLACE AND PRESSURE TEST CONTAINER AND HP AIR BOTTLES AS PER SAMPLE AND REINSTALL. (QTY - 04 NO) - (MATERIAL COST)
PORTABLE FIRE FIGHTING EXTINGUISHERS - VARIOUS PLACES
CARRY OUT HYDRAULIC PRESSURE TESTING OF THE EXTINGUISHERS (EXCEPT CO2 EXTINGUISHERS) AT A PRESSURE OF 35 KG/CM2. THE PRESSURE OF 35 KG/CM2 IS TO BE BUILT-UP SLOWLY IN 1 MIN. AND MAINTAINED FOR 2.5 MINS. STAGGER THIS TEST SUCH THAT ATLEAST ONE-THIRD (1/3 RD) OF THE TOTAL EXTINGUISHERS ARE TESTED EVERY YEAR. RECHARGE/REFILL THE EXTINGUISHERS THEREAFTER. NOTE:- EXTINGUISHERS SHOULD BE HYDRAULICALLY TESTED WITH THE CAP FITTED. THERE SHALL NOT BE ANY LEAKAGE OR VISIBLE DISTORTION IN THE TEST AND EXTINGUISHERS WHICH FAIL THIS REQUIREMENT SHALL BE REPLACED. -(SERVICE COST) AFFF(9kg)- 28 nos, CO2(2kg)- 30 nos, DCO(10kg) - 05 nos.
CARRY OUT HYDRAULIC PRESSURE TESTING OF THE EXTINGUISHERS (EXCEPT CO2 EXTINGUISHERS) AT A PRESSURE OF 35 KG/CM2. THE PRESSURE OF 35 KG/CM2 IS TO BE BUILT-UP SLOWLY IN 1 MIN. AND MAINTAINED FOR 2.5 MINS. STAGGER THIS TEST SUCH THAT ATLEAST ONE-THIRD (1/3 RD) OF THE TOTAL EXTINGUISHERS ARE TESTED EVERY YEAR. RECHARGE/REFILL THE EXTINGUISHERS THEREAFTER. NOTE:- EXTINGUISHERS SHOULD BE HYDRAULICALLY TESTED WITH THE CAP FITTED. THERE SHALL NOT BE ANY LEAKAGE OR VISIBLE DISTORTION IN THE TEST AND EXTINGUISHERS WHICH FAIL THIS REQUIREMENT SHALL BE REPLACED - (MATERIAL COST). AFFF(9kg)- 28 nos, CO2(2kg)- 30 nos, DCO(10kg) - 05 nos.
Air O Weld Corporation (BID ID -727226)
SHMSHIPCARE (BID ID -727671)
Cargo Gear Services (I) Pvt Ltd (BID ID -727800)
M/s DYNATRON SERVICES PVT LTD (BID ID -727701)
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .