Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.6 LAdmitted-Finance | ₹5.6 L | L1 | Admitted-Finance |
| 2 | L2₹8.1 L+₹2.5 L (45.3%)Admitted-Finance | ₹8.1 L+₹2.5 L (45.3%) | L2 | Admitted-Finance |
| 3 | L3₹17.9 L+₹12.3 L (219.8%)Admitted-Finance 104 EAST MADHA CHURCH STREET ROYAOURAM CHENNAI TAMIL NADU 600024 | CHENNAI | TAMIL NADU | 600024 | ₹17.9 L+₹12.3 L (219.8%) | L3 | Admitted-Finance |
| 4 | L4₹30 L+₹24.4 L (437.4%)Admitted-Finance 2ND FLOOR KALOOR BUSSTAND COMPLEX BUS STAND COMPLEX KALOOR BUSSTAND COMPLEX ERNAKULAM KERALA 682017 | ERNAKULAM | KERALA | 682017 | ₹30 L+₹24.4 L (437.4%) | L4 | Admitted-Finance |
| Sl No | Description | Qty | Unit | SMEC Automation Pvt Ltd L4 | GOKUL ENGINEERING ASSOCIATES L1 | SHRI GURUDATTA ENGINEERING WORKS L2 | RAREFIELD ENGINEERS PVT LTD L3 |
|---|---|---|---|---|---|---|---|
| 0.00The complete inspection,overhauling, pressure testing, and proving of OWS system and satisfactory trials to be shown to the ship, required spares,consumables,certified tools and tackles,measuring instruments shall be within the contractor's scope of supply. | |||||||
| 1.00 | OWS system - Inspection and Overhauling
Isolate OWS and ensure safe working conditions, Drain oil, water & sludge from OWS unit, Dismantle ows chamber,filters and internal components , Clean all chambers, filters elements and coalescer plates, Inspect parts for corrosion,cracks or damage parts, Renew damaged gaskets,seals and filter elements, Reassemble ows Unit as per manufacturere instructions. | 1 | LS | 5,00,000 ₹13,00,000 | 1,60,000 ₹1,76,000 Lowest | 3,77,777 ₹3,87,777 | 10,00,000 ₹12,00,000 |
| 2.00 | OWS Mountings, pipelines & Valves
Inspect ows mounting, foundation bolts and supports, Inspect inlet,outlet & disccharge pipe line, Overhauling associated valves and fittings, Renew defective components as required. | 1 | LS | 2,00,000 ₹8,00,000 | 73,400 ₹93,400 | 40,000 ₹41,000 Lowest | 75,000 ₹1,00,000 |
| 3.00 | Pressure testing
Blank off all system and connecteing pipe lines, Carry out hydrostatic pressure test of ows unit, Presuure test associated v pipeline and valves check leakage and pressure drop, and record pressure results | 1 | LS | 1,50,000 ₹5,00,000 | 57,780 ₹57,780 | 35,000 ₹37,000 Lowest | 75,000 ₹1,00,000 |
| 4.00 | 15PPM Bilge Alarm/ Monitor calibration
Inspect and clean 15 PPM bilge alarm and sensors, Calibrate using certified test fluids,Verify alarm activation at 15PPM, Check interlock with overboard discharge valve, Obtain calibration certification from class approved agency. | 1 | LS | 25,000 ₹1,00,000 | 54,000 ₹61,000 Lowest | 1,20,000 ₹1,23,000 | 80,000 ₹1,00,000 |
| 5.00 | Testing, Trails, & Proving
Restore system and refill, Conduct operational trails with water, Simulate oily water condition, Verify correct alarm and shut off operation, Demonstrate satisfactory operation to class surveyor. | 1 | LS | 25,000 ₹1,00,000 | 1,57,015 ₹1,57,015 | 58,000 ₹60,500 Lowest | 80,000 ₹1,00,000 |
| 6.00 | Safety & compliance
comply with MARPOL regulation . Follow lock out and tag out Procedures, Adhere to manufacturer and class requirements. OWS operation and certification to be obtained through IRS as per MARPOL regulations. | 1 | LS | 20,000 ₹1,00,000 | 6,500 ₹6,500 Lowest | 68,000 ₹71,000 | 1,00,000 ₹1,20,000 |
| 7.00 | Completion & acceptance
OWS system and bilge alarm found satisfactory after overhauling, pressure testing and calibration.certificates to be
provided. | 1 | LS | 85,000 ₹1,00,000 | 6,500 ₹6,500 Lowest | 90,000 ₹91,000 | 50,000 ₹65,000 |
Tender Value
Refer Docs
EMD Value
₹25,000
Closing Date
18 Mar 2026, 11:00 amClosed
SM(SRC-OS)
HSL
OVERHAULING OF OIL WATER SEPARATOR ON ORV SAGAR KANYA
2026_HSL_99191_1
SR COMPLEX/PRODUCTION/OUT SOURCEREQUISITION/2025/888
Open Tender
Miscellaneous Services
Service
50 days
VISAKHAPATNAM
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹25,000
Yes
29 Apr 2026
12 Mar 2026
18 Mar 2026
12 Mar 2026
18 Mar 2026
12 Mar 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 0 | The complete inspection,overhauling, pressure testing, and proving of OWS system and satisfactory trials to be shown
to the ship, required spares,consumables,certified tools and tackles,measuring instruments shall be within the
contractor's scope of supply. | - | - | - | - |
| 1 | OWS system - Inspection and Overhauling
Isolate OWS and ensure safe working conditions, Drain oil, water & sludge from OWS unit, Dismantle ows chamber,filters and internal components , Clean all chambers, filters elements and coalescer plates, Inspect parts for corrosion,cracks or damage parts, Renew damaged gaskets,seals and filter elements, Reassemble ows Unit as per manufacturere instructions. | 1 | LS | - | - |
| 2 | OWS Mountings, pipelines & Valves
Inspect ows mounting, foundation bolts and supports, Inspect inlet,outlet & disccharge pipe line, Overhauling associated valves and fittings, Renew defective components as required. | 1 | LS | - | - |
| 3 | Pressure testing
Blank off all system and connecteing pipe lines, Carry out hydrostatic pressure test of ows unit, Presuure test associated v pipeline and valves check leakage and pressure drop, and record pressure results | 1 | LS | - | - |
| 4 | 15PPM Bilge Alarm/ Monitor calibration
Inspect and clean 15 PPM bilge alarm and sensors, Calibrate using certified test fluids,Verify alarm activation at 15PPM, Check interlock with overboard discharge valve, Obtain calibration certification from class approved agency. | 1 | LS | - | - |
| 5 | Testing, Trails, & Proving
Restore system and refill, Conduct operational trails with water, Simulate oily water condition, Verify correct alarm and shut off operation, Demonstrate satisfactory operation to class surveyor. | 1 | LS | - | - |
| 6 | Safety & compliance
comply with MARPOL regulation . Follow lock out and tag out Procedures, Adhere to manufacturer and class requirements. OWS operation and certification to be obtained through IRS as per MARPOL regulations. | 1 | LS | - | - |
| 7 | Completion & acceptance
OWS system and bilge alarm found satisfactory after overhauling, pressure testing and calibration.certificates to be
provided. | 1 | LS | - | - |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.00 MB
TBID_888.pdf
Tender Documents • 0.37 MB
ANNEXURE.pdf
Tender Documents • 0.19 MB
BOQ_108769.xls
BOQ • 0.23 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .