Loading…
Loading…
Tender ID
Tender Value
₹5.0 Cr
EMD Value
₹5.0 L
Closing Date
27 Jan 2026, 6:00 pmClosed
Executive Engineer Panchayat R and B Division Bhuj-Kachchh
Construction of Major Bridge on Bayath Ratadiya Sheradi Asambiya Road between Ch. 18/700 Ta. Mandvi Dist. Bhuj-Kutchchh
264887
64-2025/2026
Open
Civil Works - Bridges
Works
Kutch
7 documents required · 7 mandatory
₹6,000
Yes
Executive Engineer Panchayat R and B Division Bhuj-Kachchh
₹5.0 L
Yes
13 Jan 2026
13 Jan 2026
13 Jan 2026
27 Jan 2026
13 Jan 2026
No. figures Amount
1 Providing flood gauge marks on sub structure as per design 8.00 Rmt 159.08
including painting as directed etc. complete.
2 Providing masonary steps with cement pointing on approaches as 53.00 Each 219.53
3 Providing and laying filter media 600mm as directed at the back of 744.00 Smt 1216.82
abutments, returns and wing walls as per detailed specifications
etc. complete.
4 Providing and filling sand behind abutment & between returns in 832.00 Cum 480.41
layers as directed.
5 Excavation for foundation in hard murrum and boulders and very 389.00 Cum 582.22
stiff or sticky clays and other similar strata including sorting and
strutting and dewatering as necessary and disposing of excavated
stuff as directed.
6 Excavation in large boulders and soft rock by welding including 1630.00 Cum 682.44
sorting strutting and dewatering as necessary and disposing off
the excavated stuff as directed.
7 Excavation in hard rock by dry wet blasting and chiselling 280.00 Cum 1595.53
including dewatering preparing foundation base by proper
benching and stepping and dispossing of the excavated stuff as
directed. (B) Blasting prohibited
8 Providing and filling in foundation with ordinary cement concrete 96.00 Cum 3636.74
M-15 mix and providing necessary vertical pin headers including
formwork, vibrating, ramming and curing complete.
9 Diversion of water course, providing cofferdam and bund or island 7.00 No. 50500.00
as may be necessary for foundation and maintaining the same for
the period as may be necessary (A) Diversion by cofferdam /
10 Providing and fixing steel dowel bars of Fe-550D grade 32mm dia. 404.00 Meter 543.30
for anchoring by drilling holes in foundation strata including
necessary bending, hooking of dowel bars and grouting the holes
complete as per detailed drawing and as directed.
11 Providing and casting in situ controlled mix concrete M-35 for 839.00 Cum 4786.54
R.C.C. footing for pier including necessary shuttering, laying,
vibrating, ramming and curing complete.
12 Providing & filling trenches of excavation in rocky strata with NMC 538.00 Cum 3540.46
13 Providing and placing in position I.S.I. mark reinforcement 272.44 M.T. 72988.86
(T.M.T.) of grade Fe-550D for following items including cutting,
bending, hooking, tying etc. complete as per detailed drawings
and specifications for various structural components.
14 Providing and laying weep holes in abutment and returns by using 284.00 Each 82.57
P.V.C. / A.C. pipes of 100 mm. including laying in proper grade
and jointing the completed as per directed specification.
It. Rate in Total
Description of Item Qty. Unit
No. figures Amount
15 Providing and casting in situ controlled cement concrete M-35 for 415.213 Cum 5416.98
R.C.C. work in piers, abutments & R.C.C. Return as per drawing
including centering, shuttering, scaffolding where necessary
laying, vibrating, curing and finishing complete for all heights.
16 Providing and casting in situ controlled cement concrete M-35 mix 126.00 Cum 5437.04
for R.C.C. work in pier cap, abutment cap and dirt wall including
controlled cement concrete M-35 bed blocks or pedestals of
required size below bearings as per detailed drawings including
centering, shuttering, scaffolding wherever necessary laying,
vibrating, curing and finishing complete.
17 Providing and casting in situ controlled cement concrete M-40 mix 26.00 Cum 5516.33
for bed block or pedestals and seismic arrester of required
drawing including centering, shuttering, scaffolding where
necessary laying, vibrating, curing and finishing complete.
18 Providing and laying in position fully moulded restrained 466560.00 Cu.c 0.89
elastromeric bearing as per detailed drawings. m.
19 Providing and casting in situ controlled cement concrete M-35 for 651.00 Cum 5906.50
R.C.C. work in super structure including centering, ramming,
vibrating, curing and finishing complete. (A) T beam deck slab
type of super structure (ii) Main and cross girder.
20 Providing and casting in situ controlled cement concrete M-40 for 97.20 Cum 5546.82
average 100mm thick wearing coat laid as directed including
tamping, vibrating, finishing, curing and filling in joints with
bitumen etc. complete.
21 Reinforced Cement Concrete Crash Barrier (Provision of an 279.00 Rmt. 1532.20
Reinforced cement concrete crash barrier at the edges of the
road, approaches to bridge structures and medians, constructed
with M-40 grade concrete with TMT reinforcement conforming to
IRC:21 and dowel bars 25 mm dia, 450 mm long at expansion
joints filled with pre-moulded asphalt filler board, keyed to the
structure on which it is built and installed as per design given in
the enclosure to MOST circular No. RW/NH - 33022/1/94-DO III
dated 24 June 1994 as per dimensions in the approved drawing
and at locations with necessary priming coat and 3 coat of
painting complete with Yellow & Black Patta as directed by the
Engineer, all as specified)
22 Providing P.V.C. 100mm dia. water spouts including necessary 36.00 No. 159.37
iron grating as per detailed drawing including placing etc.
23 Providing and fixing marble slab including engraving letters, 2.00 No. 1012.65
numbers and painting etc. complete. (A) size 75 cm x 60 cm x
24 Providing and casting in situ controlled cement concrete M-30 for 20.30 Cum 5246.40
approach slab including form work, curing and finishing etc.
It. Rate in Total
Description of Item Qty. Unit
No. figures Amount
25 Providing and fixing in position Strip Seal type expansion joint 51.00 Rmt. 1733.16
catering to maximum horizontal movement upto 70 mm, complete
as per approved drawings and standard specification to be
installed by the manufacturer / supplier or their authorised
representative ensuring compliance to the manufacturer's
instructions for installation.
26 Finishing wall with weather proof exterior emulsion paint on wall 419.00 Sq.m. 114.53
surface (two coats) to give an required shape even shade after
thoroughly brushing the surface to remove all dirt, dust and
remains of loose powdered materials etc. complete.
27 Providing Designing Supplying and Installation of Extruded Bi- 336.00 Sq.m. 111.10
Axial Polypropylene 30 kn GeoGrid including all labours & etc.
28 Providing fusion bonded epoxy coating not less than 175 micron 105.00 M.T. 10162.62
thickness and up to 300 micron to reinforcement bars as per IS-
13620-1993/ATM-775M including testing of coating at plant and
all taxes (A) 10mm to 16mm dia. bar.
29 Providing fusion bonded epoxy coating not less than 175 micron 158.00 M.T. 7296.24
thickness and up to 300 micron to reinforcement bars as per IS-
13620-1993/ATM-775M including testing of coating at plant and
all taxes (B) 20mm to 32mm dia. bar.
30 Providing and fixing the continuity arrangement in deck slab as 26.00 Rmt. 8319.37
per the detailed with fixture, components, filler etc. complete by
Engineer in charge.
31 Providing, supplying and installation of inspection gallery / 7.00 No. 101000.00
platform made form concrete for same grade of pier cap, steel Fe-
550D & structure steel grade of Fe-350 in each pier & abutment
location for purpose of inspection including all labours, materials
etc. complete.
32 Clearing and grubbing of road land including up rooting wild 0.30 Hect. 28455.09
vegetation, grass, bush shrubs, saplings and trees of girth up to
300 mm removal of stumps of such trees cut earlier and disposal
of unserviceable material (C) by mechanical means in area of light
33 Earth work for embankment including breaking clods, dressing 11478.00 Cum 180.87
with all lead and lift including watering and consolidation (C) from
borrow area within 8.0 km lead (With minimum 6% CBR)
34 Rolling & watering of earthwork in layers with power roller 287.00 Cum 22.96
including filling in depressions which occur during the process.
35 Earthwork in cutting in all sorts of soil and soft murrum including 127.00 Cum 109.24
conveying and putting the stuff in spoil maintaining minimum
distance of five meter between top edge and cutting and toe of
spoil bank.
It. Rate in Total
Description of Item Qty. Unit
No. figures Amount
36 Construction of compacted Granular sub base (Grade-I, Crushed 421.00 Cum 849.41
B.T. materials 53mm to 26.5mm size @ 35%, 26.5mm to 4.75mm
45% and below 2.36mm @ 20%) by providing close graded
material, mixing in a mechanical mix plant at OMC, carriage of
mix material to work site, spreading in uniform layers with motor
grader on prepared surface and compacting with vibratory power
roller to achieve desired density, complete clause as per
37 Providing and laying W.B.M. of M.C. metal of size 45 mm to 90 406.00 Cum 1225.13
mm size including 0.27 Cu.M. stone screening & 0.08 Cu.M. stone
dust as filler including spreading, watering & consolidation by
vibratory roller 80KN to 100KN static weight. 100 mm thick
compacted.
38 Providing and laying W.B.M. of M.C. metal of size 45 mm to 63 271.00 Cum 989.80
mm size including 0.12 Cu.M. stone screening & 0.08 Cu.M. stone
dust as filler including spreading, watering & consolidation by
vibratory roller 80KN to 100KN static weight. 75mm thick.
39 Providing and laying compacted of specified hard murrum in side 72.00 Cum 392.89
shoulder including carriage of material and spreading on prepared
base including compacting as per MORTH specification etc.
40 Providing and laying bituminous base course 37.5 mm thick 203.00 M.T. 2193.72
compacted using B.T. stone aggregates of required gradation with
asphalt VG-30 grade for tack coat at the rate of 4.00 Kg./10 Sqmt.
on W.B.M. surface and asphalt VG-30 grade for mixing @ 1.99 %
i.e. 19.90 Kg./MT by weight of mix including heating and mixing in
drum mix plant transporting the mix, spreading the same by paver
finisher and consolidation as per MORTH specification including
cost of all materials, fuel, labours, tools and plants etc. using
contractor's own drum mix plant etc. complete.
41 Providing and laying 37.50 mm thick compacted B.M. using stone 223.00 M.T. 2694.68
chips 0.66 Cum/1 M. ton mix as per gradation with Asphalt VG-30
for tack coat @ 2.50 kg./10 Smt. on B.T. surface and asphalt
grade VG-30 for mixing @ 34 kg/M.Ton (i.e. 3.40% of mix)
including heating the and aggregate by continuous batching drum
mix plant, transporting and mixed material and spreading the
same by paver finisher and consolidation by vibratory roller of
KN to 100 Kn static weight including the cost of labour oil,
lubricants etc. using contractors own machineries and plant.
42 Providing and laying bituminous seal coat with stone chips 6 to 10 74.00 M.T. 2921.93
mm size 0.18 Cmt/10 smt i.e. using 0.66 cmt aggregate per M.T
mix using asphalt VG-30 @ of 4.50% of mix including heating the
asphalt and aggregate by continuous batching drum mix plant and
paver finisher and consolidating by vibratory roller including
providing equipment, tools, plant, firewood, oil, kerosene, labour
charges etc. using the contractors own machinery and plant.
43 Providing and fixing Guard stone as per I.R.C. type design 25.00 No. 103.56
including white washing etc. complete (ii) Fixing in earth.
It. Rate in Total
Description of Item Qty. Unit
No. figures Amount
44 Regulatory / Mandatory signs : Providing and fixing sign boards 2.00 No. 3439.81
made out of 2mm aluminium sheet size 60cms. diameter circle as
per the design of IRC-67-1977 pre treated with phospheting
process & acid eteching, coated with one coat of epoxy primer
and two coats of best quality epoxy paint, reflectorised with retro
reflective sheeting as per latest M.O.S.T. Specifications; 3.1m
long stand post and frame fabricated from suitable size iron angle
of 35 x 35 x 3mm, 75 x 75 x 6mm as required; painted with best
quality epoxy coatings in black and white bends. the details of
symbol for each board shall be as per the instruction of engineer
in charge. The fixing at site shall be in 1:2:4 CC block of size 45 x
45 x 60cms. for each leg including excavation curing etc.
complete under the supervision of engineer in charge. (A)
Engineer Grade (VR)
45 Hazard Marker Sign :- Providing and fixing sign board made out of 4.00 No. 2423.74
2mm aluminium sheet size 90 x 30 cms. rectangle as per the
design / drawing attached (IRC) pretreated with phospheting &
acid etching, coated with one coat of epoxy primer and two coats
of best quality epoxy paint reflectorised with retro reflective
sheeting as per latest M.O.S.T. specification, 3.1m long stand
post and frame fabricated from suitable size iron angle of 35 x
x 3mm & 50 x 50 x 5mm painted with best quality epoxy coatings.
The fixing at site shall be in 1:2:4 C.C. block of size 45 x 45 x
60cms for each leg including excavation curing etc. complete
under the supervision of Engineer in charge. (A) Engineer grade
46 STOP SIGN :- Providing and fixing sing boards made out of 2mm 2.00 No. 4676.06
aluminium sheet size 90 x 90cms. rectangle as per the design of
IRC-67-1977 pretreated with phospheting process & acid etching,
coated with one coat of epoxy primer and two coats of best quality
epoxy paint reflectorised with retro reflective sheeting as per latest
M.O.S.T. specifications; 3.1m long stand post and frame
fabricated from suitable size iron angle of 35 x 35 x 3mm, 75 x
x 6mm as required; painted with best quality epoxy coatings in
black and white bends. The details of symbol for each board shall
be as per the instruction of engineer in charge. The fixing at site
shall be in 1:2:4 CC block of size 45 x 45 x 60cms. for each leg
including excavation curing etc. complete under the supervision of
Engineer in charge. (A) Engineer grade (VR).
47 Road marking with hot applied thermoplastic paints with 109.00 Sq.m. 367.72
reflectorising glass beads on bitumen surface providing and laying
a hot applied thermoplastic compound 2.5 mm thick including
reflectorising glass beads @ 250gms per sqm area, thickness of
2.5mm is excluding of surface applied glass beads as per IRC:35-
2015. The finished surface to be level, uniform and free from
streaks and holes. zebra patta / bump patta lane / center line /
edge line/cut patta. The white colour marking should provide
luminance coefficient on cement road shall be min
mcd/m2/lux and Asphalt road shall be min 100 mcd/m2/lux during
the service life during the day time. The marking should meet the
performance criteria for night time reflectivity, wet reflectivity and
skid resistance as mentioned in the section-15 of IRC 35-2015.
Warranty for the Retro reflectivity should be two years.
It. Rate in Total
Description of Item Qty. Unit
No. figures Amount
48 Cat Eye / Road Stud / RPM : Supplying of Moulded Twin Shanks 41.00 No. 326.23
Raised Pavement Markers made of polycarbonate and ABS
moulded body and reflective panels with micro prismatic lens (No
Glass bead lens) capable of providing total internal reflection of
the light entering the lens face and shall support a load of
kgs. tested in accordance to ASTM D 4280 Type - H and
complying to Specifications of Category A of MORTH Circular No.
RW/NH/33023/ 10-97 DO III Dt 11.06.1997. The height, width and
length shall not exceed 20 mm, 130 mm and 130 mm and with
minimum reflective area of 13 Sqcm on each side and the slope to
the base shall be 35 +/- 5 degree. The strength of detachment of
the integrated cylindrical shanks, (of diameter not less than 19 +/-
2 mm and height not less than 30+/- 2 mm) from the body is to be
a minimum value of 500 Kgs. Fixing will be by drilling holes on the
road for the shanks to go inside, without nails and using epoxy
resin based adhesive as per manufacturer's recommendation and
the color of the marker should be as per the IRC 35-2015 and as
directed by Engineer-in-charge.
49 Type - A, "W" : Metal Beam Crash Barrier (Providing and erecting 200.00 Rmt. 2996.67
a "W" metal beam crash barrier comprising of 3 mm thick
corrugated sheet metal beam rail, 70 cm above road/ground level,
fixed on ISMC series channel vertical post, 150 x 75 x 5 mm
spaced 2 m centre to centre, 1.8 m high, 1.1 m below ground/road
level, all steel parts and fitments to be galvanised by hot dip
process, all fittings to conform to IS:1367 and IS:1364, metal
beam rail to be fixed on the vertical post with a spacer of channel
section 150 x 75 x 5 mm, 330 mm long complete as per clause
810) with necessary excavation of post, providing levelling course
M-10 (Size 0.65 x 0.65 x 0.10m) & foundation concrete in M-200
(size 0.5 x 0.5 x 0.15 + 0.3 x 0.3 x 0.70) as per requirement and
instruction from Engineer in charge.
50 Dismentaling the existing structure including removing and 227.00 Cum 930.35
stacking the dismentelled materials as and where directed. (A)
R.C.C. work.
51 Dismentaling the existing structure including removing and 713.00 Cum 409.22
stacking the dismentelled materials as and where directed. (B)
Rubble Masonry.
52 Excavation for foundation upto 1.50 mt. depth including sorting out 360.00 Cum 253.88
and stacking of useful material and disposing off the excavated
stuff within all lead and lift for all sorts of soil.
53 Providing and filling in foundation with ordinary cement concrete 54.00 Cum 3327.08
M-100 mix and providing necessary vertical pin headers including
formwork vibrating ramming & curing complete.
54 Providing and casting in situ ordinary cement concrete M-150 mix 585.00 Cum 3327.08
and providing necessary pin headers including shuttering,
scaffolding, laying, vibrating, curing and finishing complete without
‘V‘ grooves (A) Height from 0.0 to 5.0 mt.
It. Rate in Total
Description of Item Qty. Unit
No. figures Amount
55 Providing and fixing in position I.S.I. mark Fe-550D (T.M.T.) bar 3.30 M.T. 83405.64
reinforcement including providing fusion epoxy coating not less
than 175 micron thickness and upto 300 micron to reinforcement
bars as per IS-13620-1993/ASTM-775 M including testing of
coating at plant and all taxes and transporting to the site from
factory, cutting, bending and tying complete as per detailed
drawing and specification (A) R.C.C. Kerb. (B) R.C.C. Footpath
(C) R.C.C. Approach slab (D) Wearing Coat.
56 Filling available excavated earth (excluding rock) in trenches, 360.00 Cum 136.92
plinth, sides of foundation etc. in layers not exceeding 20 cm. in
depth consolidating each deposited layers by ramming and
57 Providing & laying weep hole in abutments and returns by using 460.00 No. 186.08
P.V.C. 10 Kg/Sqcm pipe of 110mm dia. including laying in proper
grade and jointing the completed as per detailed specification.
58 Providing the diversion by proper means i.e. in proper grade, 460.00 Rmt. 748.26
camber and approach etc. for easy passing of traffic including
providing necessary sign board, making etc. and maintaining the
same during the period of work up to completion of work.
Total Rs.
i.e. Rs. Five Crore, Two Lacs, Fifty Seven Thousand, Seven hundred Twenty Eight and Eighty Seven paisa
I/We am/are willing to carry out the work @ ______________ % above/below percent (Should be written
in figures and words) of the estimated rate mentioned above. Amount of my /our tender works out as under.
Estimated amount put to tender Estimated amount put to tender
Deduct………% below Add………% Above
Net Rs. ___________________________ Total Rs. ________________________
In words ____________________ In words ____________________
1. The Contractor shall exhibit a board with detailed specification and details of work as directed by the Engineer-In-Charge
for which no extra payment shall be made.
2. The labour cess will be deducted as per prevailing rules i.e. 1% of the work done.
3. GST and Income tax TDS will be deducted at a source while making payments of bills.
4. In all R.C.C. Items in Rate Analysis Standard Cement Consumption has been taken as per Govt. G.R.: PRC-10/2017
Cement Consumption/16/C, Date:11/05/2017 as stated in S.O.R. therefore in R.C.C. items where there is a change as
per actual mix design the cost of difference of cement consumption have been deducted from the rate of original item at
the rate of input rate mentioned in all the tender.
5. Credit for 70% materials to be reused and dismantalled materials of amount of Rs. 16,33,886.18 must be
recovered from 1st R.A. bill of Contractor's.
Above all items of "Schedule-B" with Item Description, Unit, Rate & Amount have verified by me and found
Deputy Executive Engineer Sr. Divisional Account Officer Executive Engineer
Panchayat (R & B) Sub Division, Panchayat (R & B) Division, Panchayat (R & B) Division,
Mandvi Bhuj-Kutchchh Bhuj-Kutchchh
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
GRs - 1.pdf
GRs - 2.pdf
GRs - MMGSY.pdf
SPECIAL CONDITION OF CONTRACT 17 A and B.pdf
GRs - Special Conditions.pdf
BOQ.pdf
Checklist.pdf
Drawings.pdf
General Techical Specifications.pdf
SBD.pdf
SCH-B.pdf
Sp Index.pdf
Testing schedule.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .