Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹10.0 CrAdmitted-Finance | L1 | Admitted-Finance | |
| 2 | L2₹10.0 Cr+₹31,130 (0.03%)Admitted-Finance 31 231 1 2 2 KHERAI MOD SHAMSHABAD ROAD SHAMSHABAD ROAD AGRA UTTAR PRADESH 282002 UDYAM UP 01 0024107 | AGRA | UTTAR PRADESH | 282002 | L2 | Admitted-Finance | |
| 3 | L3₹11.5 Cr+₹1.5 Cr (15.1%)Admitted-Finance | L3 | Admitted-Finance | |
| 4 | L4₹12.8 Cr+₹2.8 Cr (28.3%)Admitted-Finance | L4 | Admitted-Finance | |
| 5 | L5₹14.3 Cr+₹4.3 Cr (43.2%)Admitted-Finance | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | PYRAMIDFABCON EVENTMANGER PVT LTD L8 | M/s Lallooji and Sons L7 | LALLOOJI DERAWALA PRIVATE LIMITED L4 | VRINDABAN TENT HOUSE L1 | EYAK VENTURES PRIVATE LIMITED L6 | GKS PROJECTS AND EVENTS L2 | M/S LALLOJI GOPAL DAS AND SON L3 | Lallooji Brothers L5 | Lallooji Enterprises L9 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Tin Kitchen A-9'x9' height 10' GC Sheet minimum22 gauge roof and wall enclosed on all four sides on balli frame with a door having latch including supply of all material labour T&P etc. required for proper completion of work as per direction of Authority/Engineer in Charge (minimum height 10') | 584 | per unit | 7,250 ₹42,34,000 | 7,025 ₹41,02,600 | 4,455 ₹26,01,720 | 4,500 ₹26,28,000 | 7,000 ₹40,88,000 | 4,500 ₹26,28,000 | 3,442.5 ₹20,10,420 Lowest | 6,690 ₹39,06,960 | 9,500 ₹55,48,000 |
| 2.00 | Tin Kitchen Big B-9'x16' GC Sheet minimum 22 gauge roof and wall enclosed on all four sides on balli frame with a door having latch including supply of all material labour T&P etc. required for proper completion of work as per direction of Authority/ Engineer in Charge (minimum height 10') | 147 | per unit | 11,300 ₹16,61,100 | 11,250 ₹16,53,750 | 7,920 ₹11,64,240 | 4,800 ₹7,05,600 Lowest | 11,100 ₹16,31,700 | 4,800 ₹7,05,600 Lowest | 6,120 ₹8,99,640 | 11,689 ₹17,18,283 | 9,469 ₹13,91,943 |
| 3.00 | Tin Store/ Kitchen A-18'x36' GC Sheet roof minimum22 gauge and wall enclosed on all four sides on balli frame with a door having latch including supply of all material labour T&P etc. required for proper completion of work as per direction of Authority/ Engineer in Charge (minimum height 10') | 183 | per unit | 48,100 ₹88,02,300 | 41,500 ₹75,94,500 | 35,640 ₹65,22,120 | 12,000 ₹21,96,000 Lowest | 41,000 ₹75,03,000 | 12,010 ₹21,97,830 | 27,540 ₹50,39,820 | 38,500 ₹70,45,500 | 39,418 ₹72,13,494 |
| 4.00 | Tin Store/ Kitchen B-12'X14' GC Sheet roof minimum 22 gauge enclosed on all four sides on balli frame with a door having latch including supply of all material labour T&P etc. required for proper completion of work as per direction of Authority/ Engineer in Charge (minimum height 10') | 22 | per unit | 14,300 ₹3,14,600 | 14,280 ₹3,14,160 | 9,240 ₹2,03,280 | 10,000 ₹2,20,000 | 14,200 ₹3,12,400 | 10,000 ₹2,20,000 | 7,140 ₹1,57,080 Lowest | 16,100 ₹3,54,200 | 14,237.29 ₹3,13,220.38 |
| 5.00 | Tin Mess/ Tin Kitchen with store 18'x18’ GC Sheet minimum22 gauge roof and wall enclosed on all four sides on balli frame with a door having latch including supply of all material labour T&P etc. required for proper completion of work as per direction of Authority/ Engineer in Charge (minimum height 10') | 6 | per unit | 24,500 ₹1,47,000 | 24,300 ₹1,45,800 | 17,820 ₹1,06,920 | 21,600 ₹1,29,600 | 24,250 ₹1,45,500 | 21,550 ₹1,29,300 | 13,770 ₹82,620 Lowest | 24,500 ₹1,47,000 | 22,857 ₹1,37,142 |
| 6.00 | Tin shed on balli frame 18'x16' GC Sheet minimum 22 gauge roof and wall enclosed on all four sides on balli frame with a door having latch including supply of all material labour T&P etc. required for proper completion of work as per direction of Authority/ Engineer in Charge (minimum height 10')
( The price quoted by Bidder shall include the mentioned specifications in this line item for billing purposes the quoted shall be calculated as per internal ground surface area of the structure example tin room 18x16 = 288Sqft, Total Amount for tin Room/Hall= 288 Sqft X per Sqft rates ) | 4,032 | Sqft | 91 ₹3,66,912 | 90 ₹3,62,880 | 55 ₹2,21,760 | 80 ₹3,22,560 | 88 ₹3,54,816 | 80 ₹3,22,560 | 42.5 ₹1,71,360 Lowest | 66.95 ₹2,69,942.4 | 60 ₹2,41,920 |
| 7.00 | Tin shed 9'x8' GC Sheet roof and wall enclosed on all four sides on balli frame with a door having latch including supply of all material labour T&P etc. required for proper completion of work as per direction of Authority/ Engineer in Charge (minimum height 10') | 374 | per unit | 6,100 ₹22,81,400 | 5,500 ₹20,57,000 | 3,960 ₹14,81,040 | 2,800 ₹10,47,200 Lowest | 5,400 ₹20,19,600 | 2,900 ₹10,84,600 | 3,060 ₹11,44,440 | 6,610 ₹24,72,140 | 8,424 ₹31,50,576 |
| 8.00 | Tin shed 15'x10' GC Sheet roof minimum22 gauge and wall enclosed on all four sides on balli frame with a door having latch including supply of all material labour T&P etc. required for proper completion of work as per direction of Authority/ Engineer in Charge (minimum height 10') | 25 | per unit | 11,600 ₹2,90,000 | 11,500 ₹2,87,500 | 8,250 ₹2,06,250 | 6,500 ₹1,62,500 | 11,400 ₹2,85,000 | 6,510 ₹1,62,750 | 6,375 ₹1,59,375 Lowest | 10,085 ₹2,52,125 | 9,469 ₹2,36,725 |
| 9.00 | G.C Sheet Store/ Garage on frame18' x 10' GC Sheet roof minimum22 gauge and wall enclosed on all four sides on balli frame with a door having latch including supply of all material labour T&P etc. required for proper completion of work as per direction of Authority/ Engineer in Charge (minimum height 10') | 165 | per unit | 14,500 ₹23,92,500 | 14,400 ₹23,76,000 | 9,900 ₹16,33,500 | 5,800 ₹9,57,000 Lowest | 14,350 ₹23,67,750 | 5,800 ₹9,57,000 Lowest | 7,650 ₹12,62,250 | 12,629 ₹20,83,785 | 13,061 ₹21,55,065 |
| 10.00 | Tin Boundary/Tin Walling of GC sheet 7.5' high supported on balli frame. including overlap and accesorries including supply of all material labour T&P etc. required for proper completion of work as per direction of Authority/ Engineer in Charge | 1,46,490 | Rft | 119 ₹1,74,32,310 | 107 ₹1,56,74,430 | 100 ₹1,46,49,000 | 120 ₹1,75,78,800 | 105 ₹1,53,81,450 | 120 ₹1,75,78,800 | 64 ₹93,75,360 Lowest | 119 ₹1,74,32,310 | 135 ₹1,97,76,150 |
Tender Value
Refer Docs
EMD Value
₹19.7 L
Closing Date
20 Jul 2026, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Superintending Engineer Civil Circle PWD Haridwar
Office Of SE, Civil Circle, PWD Haridwar
Work of Tin Structures, Tin Barricading and Tin sheds etc. under Kumbh Mela- 2027. ( On rental basis)
2026_pwd_96102_5
974/06C-Civil Circle/25 dated 21.05.2026
Open Tender
Miscellaneous Services
RFP-RFQ
90 days
Haridwar
Please refer Tender documents.
2 documents required · 2 mandatory
₹5,900
EE, PD, PWD, Haridwar (Through E-Challan)
₹19.7 L
Civil Circle, PWD Haridwar
23 Sept 2026
19 Jun 2026
21 Jul 2026
19 Jun 2026
20 Jul 2026
24 Jun 2026
19 Jun 2026 - 22 Jun 2026
22 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Tin Kitchen A-9'x9' height 10' GC Sheet minimum22 gauge roof and wall enclosed on all four sides on balli frame with a door having latch including supply of all material labour T&P etc. required for proper completion of work as per direction of Authority/Engineer in Charge (minimum height 10') | 1 | per unit | 1.25 | ₹1.25 |
| 2 | Tin Kitchen Big B-9'x16' GC Sheet minimum 22 gauge roof and wall enclosed on all four sides on balli frame with a door having latch including supply of all material labour T&P etc. required for proper completion of work as per direction of Authority/ Engineer in Charge (minimum height 10') | 1 | per unit | - | - |
| 3 | Tin Store/ Kitchen A-18'x36' GC Sheet roof minimum22 gauge and wall enclosed on all four sides on balli frame with a door having latch including supply of all material labour T&P etc. required for proper completion of work as per direction of Authority/ Engineer in Charge (minimum height 10') | 1 | per unit | 100 | ₹100 |
| 4 | Tin Store/ Kitchen B-12'X14' GC Sheet roof minimum 22 gauge enclosed on all four sides on balli frame with a door having latch including supply of all material labour T&P etc. required for proper completion of work as per direction of Authority/ Engineer in Charge (minimum height 10') | 1 | per unit | 53 | ₹53 |
| 5 | Tin Mess/ Tin Kitchen with store 18'x18’ GC Sheet minimum22 gauge roof and wall enclosed on all four sides on balli frame with a door having latch including supply of all material labour T&P etc. required for proper completion of work as per direction of Authority/ Engineer in Charge (minimum height 10') | 1 | per unit | 10 | ₹10 |
| 6 | Tin shed on balli frame 18'x16' GC Sheet minimum 22 gauge roof and wall enclosed on all four sides on balli frame with a door having latch including supply of all material labour T&P etc. required for proper completion of work as per direction of Authority/ Engineer in Charge (minimum height 10')
( The price quoted by Bidder shall include the mentioned specifications in this line item for billing purposes the quoted shall be calculated as per internal ground surface area of the structure example tin room 18x16 = 288Sqft, Total Amount for tin Room/Hall= 288 Sqft X per Sqft rates ) | 1 | Sqft | 11 | ₹11 |
| 7 | Tin shed 9'x8' GC Sheet roof and wall enclosed on all four sides on balli frame with a door having latch including supply of all material labour T&P etc. required for proper completion of work as per direction of Authority/ Engineer in Charge (minimum height 10') | 1 | per unit | 12 | ₹12 |
| 8 | Tin shed 15'x10' GC Sheet roof minimum22 gauge and wall enclosed on all four sides on balli frame with a door having latch including supply of all material labour T&P etc. required for proper completion of work as per direction of Authority/ Engineer in Charge (minimum height 10') | 1 | per unit | 13 | ₹13 |
| 9 | G.C Sheet Store/ Garage on frame18' x 10' GC Sheet roof minimum22 gauge and wall enclosed on all four sides on balli frame with a door having latch including supply of all material labour T&P etc. required for proper completion of work as per direction of Authority/ Engineer in Charge (minimum height 10') | 1 | per unit | 14 | ₹14 |
| 10 | Tin Boundary/Tin Walling of GC sheet 7.5' high supported on balli frame. including overlap and accesorries including supply of all material labour T&P etc. required for proper completion of work as per direction of Authority/ Engineer in Charge | 1 | Rft | 15 | ₹15 |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 4.03 MB
RFP_Tinstructure.pdf
Tender Documents • 3.03 MB
BOQ_114381.xls
BOQ • 0.35 MB
1950_CorrTin.pdf
PDF • 0.26 MB
1929_Tin.pdf
PDF • 0.44 MB
1842_TinStructure.pdf
PDF • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .