Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical/Finance HADAPSAR INDUSTRIAL ESTATE HADAPSAR INDUSTRIAL ESTATE HADAPSAR POST OFFICE HADAPSAR PUNE MAHARASHTRA 411013 | PUNE | MAHARASHTRA | 411013 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
Refer Docs
EMD Value
₹19.2 L
Closing Date
3 Feb 2023, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
THE ADMIRAL SUPERINTENDENT
NSRY (KOCHI)
REPAIR RATE CONTRACT (RRC) FOR AIR CONDITIONING AND REFRIGERATION PLANTS INSTALLED ON BOARD INS VIKRANT
2023_NAVY_574933_1
TST/344/E/AC REF/22-25
Single
Marine Services
Item Rate
1095 days
AT KOCHI
THE OEM/REP SHOULD HAVE SUITABLE FACILITY, SUFFICIENT INFRASTRUCTURE AND EXPERTISE FOR PROVIDING SERVICE UNDER RRC WITHIN 24 HOURS OF NOTIFICATION AT KOCHI AND 72 HOURS AT ANY OTHER PORTS IN INDIA
6 documents required · 6 mandatory
₹0
₹19.2 L
Yes
NSRY, Kochi
6 Feb 2023
16 Jan 2023
6 Feb 2023
16 Jan 2023
3 Feb 2023
26 Jan 2023
17 Jan 2023 - 20 Jan 2023
23 Jan 2023
Amount
Work/ Item description
4000 hourly/ 6 Monthly routines for Inspection/Check Points
Check Compressor & Motor alignment for specified limits (Max accepted misalignment is 0.1 mm) and healthiness of metallic coupling.
Check condenser tubes for scaling.
4000 hourly/ 6 Monthly routines for Corrective action
Check Compressor & Motor alignment for specified limits (Max accepted misalignment is 0.1 mm) and healthiness of metallic coupling.
Check condenser tubes for scaling.
Service Charges of Occasional Routines
Major overhaul of screw compressor
Alignment of compressor and motor.
Condenser cleaning of 1200 kW AC Plant
Flushing of the refrigeration system of 1200 kW AC plant by blowing of dry Nitrogen gas.
Pressure testing of the refrigeration system of 1200 kW AC plant for checking leakages and holding the pressure for 24 hours
Vacuuming of the refrigeration system of 1200 kW AC plant and holding for 4 hours.
Refrigerant R134a charging into 1200 kW AC plant.
Lubricating oil charging into 1200 kW AC plant.
STW and running of the 1200 kW AC plant for 4 hours.
Screw compressor mechanical seal replacement.
Overhaul of chilled water pump, replacement of bearings, mechanical seal, balancing of pump shaft & impeller.
Overhaul of sea water pump, replacement of bearings, mechanical seal, balancing of pump shaft & impeller.
Overhaul of lube oil pump by replacement of bearings and seal.
Overhaul/replacement of compressor suction valve.
Overhaul/replacement of compressor discharge valve.
Replacement of Refrigerant Suction Bellow.
Replacement of Refrigerant Discharge Bellow.
Replacement of Refrigerant Liquid injection line Bellow
Replacement of sea water pump suction/discharge Bellow.
Replacement of chilled water pump suction/discharge Bellow.
Replacement of Refrigerant Expansion Valve (Per Valve).
Replacement of Condenser gaskets.
Replacement of Evaporator Gaskets
Man-day cost for unscheduled Maintenance support/Other Charges, if any
Description of Work / Item(s)
Amount
Work/ Item description
4000 hourly/ 6 Monthly routines for Inspection/Check Points
Check Compressor & Motor alignment for specified limits (Max accepted misalignment is 0.1 mm) and healthiness of metallic coupling.
Check condenser tubes for scaling.
4000 hourly/ 6 Monthly routines for Corrective Action
Check Compressor & Motor alignment for specified limits (Max accepted misalignment is 0.1 mm) and healthiness of metallic coupling.
Check condenser tubes for scaling.
8000 hourly/ yearly routines for Inspection/Check Points
Calibration of pressure and temperature trans meters/ gauges/ pressure safety valves.
Check condition of Motors Bearing of by SPM Meter
Checking alignment of sea water pump with motor.
Checking alignment of chilled water pump with motor.
Check healthiness of mechanical seal of sea water Pump.
Check healthiness of mechanical seal of chilled water Pump.
8000 hourly/ yearly routines for Correctiuve Action
Check condition of Motors Bearing of by SPM Meter
Checking alignment of sea water pump with motor.
Checking alignment of chilled water pump with motor.
Check healthiness of mechanical seal of sea water Pump.
Check healthiness of mechanical seal of chilled water Pump.
Service Charges of Occasional Routines
Major overhaul of screw compressor
Alignment of compressor and motor.
Condenser cleaning of 1200 kW AC Plant
Flushing of the refrigeration system of 1200 kW AC plant by blowing of dry Nitrogen gas.
Pressure testing of the refrigeration system of 1200 kW AC plant for checking leakages and holding the pressure for 24 hours
Vacuuming of the refrigeration system of 1200 kW AC plant and holding for 4 hours.
Refrigerant R134a charging into 1200 kW AC plant.
Lubricating oil charging into 1200 kW AC plant.
STW and running of the 1200 kW AC plant for 4 hours.
Screw compressor mechanical seal replacement.
Overhaul of chilled water pump, replacement of bearings, mechanical seal, balancing of pump shaft & impeller.
Overhaul of sea water pump, replacement of bearings, mechanical seal, balancing of pump shaft & impeller.
Overhaul of lube oil pump by replacement of bearings and seal.
Overhaul/replacement of compressor suction valve.
Overhaul/replacement of compressor discharge valve.
Replacement of Refrigerant Suction Bellow.
Replacement of Refrigerant Discharge Bellow.
Replacement of Refrigerant Liquid injection line Bellow
Replacement of sea water pump suction/discharge Bellow.
Replacement of chilled water pump suction/discharge Bellow.
Replacement of Refrigerant Expansion Valve (Per Valve).
Replacement of Condenser gaskets.
Replacement of Evaporator Gaskets
Man-day cost for unscheduled Maintenance support/Other Charges, if any
Description of Work / Item(s)
Amount
Work/ Item description
8000 hourly/ yearly routines for Inspection/Check Points
Calibration of pressure and temperature trans meters/ gauges/ pressure safety valves.
Check condition of Motors Bearing of by SPM Meter
Checking alignment of sea water pump with motor.
Checking alignment of chilled water pump with motor.
Check healthiness of mechanical seal of sea water Pump.
Check healthiness of mechanical seal of chilled water Pump.
8000 hourly/ yearly routines for Correctiuve Action
Check condition of Motors Bearing of by SPM Meter
Checking alignment of sea water pump with motor.
Checking alignment of chilled water pump with motor.
Check healthiness of mechanical seal of sea water Pump.
Check healthiness of mechanical seal of chilled water Pump.
Service Charges of Occasional Routines
Major overhaul of screw compressor
Alignment of compressor and motor.
Condenser cleaning of 1200 kW AC Plant
Flushing of the refrigeration system of 1200 kW AC plant by blowing of dry Nitrogen gas.
Pressure testing of the refrigeration system of 1200 kW AC plant for checking leakages and holding the pressure for 24 hours
Vacuuming of the refrigeration system of 1200 kW AC plant and holding for 4 hours.
Refrigerant R134a charging into 1200 kW AC plant.
Lubricating oil charging into 1200 kW AC plant.
STW and running of the 1200 kW AC plant for 4 hours.
Screw compressor mechanical seal replacement.
Overhaul of chilled water pump, replacement of bearings, mechanical seal, balancing of pump shaft & impeller.
Overhaul of sea water pump, replacement of bearings, mechanical seal, balancing of pump shaft & impeller.
Overhaul of lube oil pump by replacement of bearings and seal.
Overhaul/replacement of compressor suction valve.
Overhaul/replacement of compressor discharge valve.
Replacement of Refrigerant Suction Bellow.
Replacement of Refrigerant Discharge Bellow.
Replacement of Refrigerant Liquid injection line Bellow
Replacement of sea water pump suction/discharge Bellow.
Replacement of chilled water pump suction/discharge Bellow.
Replacement of Refrigerant Expansion Valve (Per Valve).
Replacement of Condenser gaskets.
Replacement of Evaporator Gaskets
Man-day cost for unscheduled Maintenance support/Other Charges, if any
Description of Work / Item(s)
Amount
Work/ Item description
4000 hourly/ 6 Monthly routines for Inspection/Check Points
Check Compressor & Motor alignment for specified limits (Max accepted misalignment is 0.1 mm) and healthiness of metallic coupling.
Check condenser tubes for scaling.
Checking Healthiness of Holding down bolts/ Fasteners for all Equipment.
Check healthiness of mechanical seal of sea water Pump.
4000 hourly/ 6 Monthly routines for Corrective Action
Check Compressor & Motor alignment for specified limits (Max accepted misalignment is 0.1 mm) and healthiness of metallic coupling.
Check condenser tubes for scaling.
Checking Healthiness of Holding down bolts/ Fasteners for all Equipment.
Check healthiness of mechanical seal of sea water Pump.
Service charges of Refrigeration Circuit and ACUs
Service charges for Fwd section Refrigeration Circuit and ACUs fitted onboard Vikrant for the year 2023 of contract (4000 Hourly Routine)
Service charges for Aft section Refrigeration Circuit and ACUs fitted onboard Vikrant for the year 2023 of contract (4000 Hourly Routine)
Service Charges of Occasional Routines
Major overhaul of screw compressor
Alignment of compressor and motor.
Condenser cleaning of 35 KW Ref plants
Flushing of refrigeration system of 35 KW refrigeration plants by blowing of dry nitrogen gas
Pressure testing of refrigeration system 35 KW of refrigeration plants for checking leakages and holding the pressure for 24 hours
Vacuuming of the refrigeration system of 35 KW Refrigeration plants and holding for 4 hours.
Pressure testing of refrigeration circuit and ACUs of FWD Refrigeration plants for checking leakages and holding the pressure for 24 hours
Vacuuming of refrigeration circuit and ACUs of FWD Refrigeration plants and holding for 4 hours.
Flushing of refrigeration circuit and ACUs of AFT Refrigeration plants by blowing of dry nitrogen gas
Pressure testing of refrigeration circuit and ACUs of AFT Refrigeration plants for checking leakages and holding the pressure for 24 hours
Vacuuming of refrigeration circuit and ACUs of FWD Refrigeration plants and holding for 4 hours
Refrigerant R134A charging into FWD Refrigeration plants.
Refrigerant R134A charging into AFT Refrigeration plants
Lubricating oil charging into 35KW Refrigeration plants
STW and running of the FWD Refrigeration plants for 4 hours
STW and running of the AFT Refrigeration plants for 4 hours
Screw compressor mechanical seal replacement
Overhaul of sea water pump, replacement of bearings, mechanical seal, balancing of pump shaft & impeller
Overhaul / replacement of compressor suction valve
Overhaul / replacement of compressor discharge valve
Replacement of Refrigerant suction bellow
Replacement of Refrigerant discharge bellow
Replacement of refrigerant liquid injection line bellow
Replacement of sea water pump suction /discharge bellow
Replacement of Refrigerant Expansion valve (per valve)
Replacement of condenser gaskets and cathode protectors.
Man-day cost for unscheduled Maintenance support/Other Charges, if any
Description of Work / Item(s)
Amount
Work/ Item description
4000 hourly/ 6 Monthly routines for Inspection/Check Points
Check Compressor & Motor alignment for specified limits (Max accepted misalignment is 0.1 mm) and healthiness of metallic coupling.
Check condenser tubes for scaling.
Checking Healthiness of Holding down bolts/ Fasteners for all Equipment.
Check healthiness of mechanical seal of sea water Pump.
4000 hourly/ 6 Monthly routines for Corrective Action
Check Compressor & Motor alignment for specified limits (Max accepted misalignment is 0.1 mm) and healthiness of metallic coupling.
Check condenser tubes for scaling.
Checking Healthiness of Holding down bolts/ Fasteners for all Equipment.
Check healthiness of mechanical seal of sea water Pump.
8000 hourly/ yearly routines for Inspection/Check Points
Check condition of Motors Bearing of by SPM Meter.
Calibration of pressure and temperature trans meters/ gauges/ pressure safety valves.
Checking of all power contactors for healthiness and contacts.
8000 hourly/ yearly routines for Corrective Action
Check condition of Motors Bearing of by SPM Meter.
Service charges of Refrigeration Circuit and ACUs
Service charges for Fwd section Refrigeration Circuit and ACUs fitted onboard Vikrant for the year 2024 of contract (4000 Hourly Routine)
Service charges for Aft section Refrigeration Circuit and ACUs fitted onboard Vikrant for the year 2024 of contract (4000 Hourly Routine)
Service Charges of Occasional Routines
Major overhaul of screw compressor
Alignment of compressor and motor.
Condenser cleaning of 35 KW Ref plants
Flushing of refrigeration system of 35 KW refrigeration plants by blowing of dry nitrogen gas
Pressure testing of refrigeration system 35 KW of refrigeration plants for checking leakages and holding the pressure for 24 hours
Vacuuming of the refrigeration system of 35 KW Refrigeration plants and holding for 4 hours.
Pressure testing of refrigeration circuit and ACUs of FWD Refrigeration plants for checking leakages and holding the pressure for 24 hours
Vacuuming of refrigeration circuit and ACUs of FWD Refrigeration plants and holding for 4 hours.
Flushing of refrigeration circuit and ACUs of AFT Refrigeration plants by blowing of dry nitrogen gas
Pressure testing of refrigeration circuit and ACUs of AFT Refrigeration plants for checking leakages and holding the pressure for 24 hours
Vacuuming of refrigeration circuit and ACUs of FWD Refrigeration plants and holding for 4 hours
Refrigerant R134A charging into FWD Refrigeration plants.
Refrigerant R134A charging into AFT Refrigeration plants
Lubricating oil charging into 35KW Refrigeration plants
STW and running of the FWD Refrigeration plants for 4 hours
STW and running of the AFT Refrigeration plants for 4 hours
Screw compressor mechanical seal replacement
Overhaul of sea water pump, replacement of bearings, mechanical seal, balancing of pump shaft & impeller
Overhaul / replacement of compressor suction valve
Overhaul / replacement of compressor discharge valve
Replacement of Refrigerant suction bellow
Replacement of Refrigerant discharge bellow
Replacement of refrigerant liquid injection line bellow
Replacement of sea water pump suction /discharge bellow
Replacement of Refrigerant Expansion valve (per valve)
Replacement of condenser gaskets and cathode protectors.
Man-day cost for unscheduled Maintenance support/Other Charges, if any
Description of Work / Item(s)
Amount
Work/ Item description
4000 hourly/ 6 Monthly routines for Inspection/Check Points
Check Compressor & Motor alignment for specified limits (Max accepted misalignment is 0.1 mm) and healthiness of metallic coupling.
Check condenser tubes for scaling.
Checking Healthiness of Holding down bolts/ Fasteners for all Equipment.
Check healthiness of mechanical seal of sea water Pump.
4000 hourly/ 6 Monthly routines for Corrective Action
Check Compressor & Motor alignment for specified limits (Max accepted misalignment is 0.1 mm) and healthiness of metallic coupling.
Check condenser tubes for scaling.
Checking Healthiness of Holding down bolts/ Fasteners for all Equipment.
Check healthiness of mechanical seal of sea water Pump.
8000 hourly/ yearly routines for Inspection/Check Points
Check condition of Motors Bearing of by SPM Meter.
Calibration of pressure and temperature trans meters/ gauges/ pressure safety valves.
Checking of all power contactors for healthiness and contacts.
8000 hourly/ yearly routines for Corrective Action
Check condition of Motors Bearing of by SPM Meter.
Service charges of Refrigeration Circuit and ACUs
Service charges for Fwd section Refrigeration Circuit and ACUs fitted onboard Vikrant for the year 2025 of contract (8000 Hourly Routine)
Service charges for Aft section Refrigeration Circuit and ACUs fitted onboard Vikrant for the year 2025 of contract (8000 Hourly Routine)
Service Charges of Occasional Routines
Major overhaul of screw compressor
Alignment of compressor and motor.
Condenser cleaning of 35 KW Ref plants
Flushing of refrigeration system of 35 KW refrigeration plants by blowing of dry nitrogen gas
Pressure testing of refrigeration system 35 KW of refrigeration plants for checking leakages and holding the pressure for 24 hours
Vacuuming of the refrigeration system of 35 KW Refrigeration plants and holding for 4 hours.
Pressure testing of refrigeration circuit and ACUs of FWD Refrigeration plants for checking leakages and holding the pressure for 24 hours
Vacuuming of refrigeration circuit and ACUs of FWD Refrigeration plants and holding for 4 hours.
Flushing of refrigeration circuit and ACUs of AFT Refrigeration plants by blowing of dry nitrogen gas
Pressure testing of refrigeration circuit and ACUs of AFT Refrigeration plants for checking leakages and holding the pressure for 24 hours
Vacuuming of refrigeration circuit and ACUs of FWD Refrigeration plants and holding for 4 hours
Refrigerant R134A charging into FWD Refrigeration plants.
Refrigerant R134A charging into AFT Refrigeration plants
Lubricating oil charging into 35KW Refrigeration plants
STW and running of the FWD Refrigeration plants for 4 hours
STW and running of the AFT Refrigeration plants for 4 hours
Screw compressor mechanical seal replacement
Overhaul of sea water pump, replacement of bearings, mechanical seal, balancing of pump shaft & impeller
Overhaul / replacement of compressor suction valve
Overhaul / replacement of compressor discharge valve
Replacement of Refrigerant suction bellow
Replacement of Refrigerant discharge bellow
Replacement of refrigerant liquid injection line bellow
Replacement of sea water pump suction /discharge bellow
Replacement of Refrigerant Expansion valve (per valve)
Replacement of condenser gaskets and cathode protectors.
Man-day cost for unscheduled Maintenance support/Other Charges, if any
stage.html
html • 0.02 MB
finance_644385.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .