Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹18.8 LAdmitted-Finance | L1 | Admitted-Finance | |
| 2 | L2₹24.9 L+₹6.2 L (32.8%)Admitted-Finance | L2 | Admitted-Finance | |
| 3 | L3₹33.3 L+₹14.5 L (77.3%)Admitted-Finance | L3 | Admitted-Finance | |
| 4 | L4₹46.7 L+₹28.0 L (149.0%)Admitted-Finance | L4 | Admitted-Finance | |
| 5 | L5₹52.8 L+₹34.0 L (181.3%)Admitted-Finance | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | POSITIVE CONTROLS L2 | SRI VINAYAKA MARINE SERVICES L4 | SRI VENKATA SAI CONSTRUCTION L7 | DELTA MARINE ENGINEERS L5 | RAO ELECTRICAL ENGINEERIONG WORKS L6 | UGTECK MARINE PRIVATE LIMITED L1 | KLP ELECTRICALS L3 |
|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | DEEP SEA SEALS:
Calibrate pressure gauges. (Qty - 02, Range - 0 to 10 Bar). Renew defective gauges. Satisfactory trials to be offered to Ship Staff.
NOTE: All spares required to be supplied by vendor (2 NOS) | 1 | LS | 1,600 ₹2,100 | 3,300 ₹6,800 | 4,200 ₹8,800 | 5,400 ₹15,000 | 3,960 ₹8,260 | 1,500 ₹3,000 | 330 ₹1,810 Lowest |
| 2.00 | SCREW AND GEAR PUMPS:
Calibrate all instrumentation, which includes pressure transmitters (Range 0-10 Bar, 0-3 Bar), Temperature Transmitters (0-100 deg C), pressure switches (set pressure 01 Bar). Renew defective instrumentation. Satisfactory trials to be offered to Ship Staff.
NOTE: All spares required to be supplied by vendor.(103 NOS) | 1 | LS | 3,24,450 ₹4,89,250 | 2,57,500 ₹6,07,500 | 3,34,000 ₹7,71,500 | 3,95,000 ₹8,90,800 | 3,15,000 ₹7,63,000 | 5,50,000 ₹8,74,000 | 3,35,600 ₹4,80,400 Lowest |
| 3.00 | MAIN ENGINE STARTING AIR BOTTLES:
Check for correct functioning of system gauges, Calibrate all. Pressure Gauge - 0-40 Bar, Qty 04. Renew defective gauges. Satisfactory trials to be offered to Ship Staff.
NOTE: All spares required to be supplied by vendor.(4 NOS) | 1 | LS | 3,200 ₹4,200 Lowest | 6,600 ₹14,600 | 8,250 ₹17,950 | 9,400 ₹27,400 | 7,900 ₹17,900 | 5,500 ₹10,000 | 4,900 ₹7,100 |
| 4.00 | MAIN ENGINE STARTING AIR BOTTLES:
Carryout functional checks of all instrumentation and sensors. Undertake calibration/ repairs.Renew defective instrumentation and sensors. Instrumentation includes pressure transmitters of range 0-40 Bar (Qty 04), pressure gauges of range 0-40 Bar (Qty 04). Satisfactory trials to be offered to Ship Staff. (8 NOS)
NOTE: All spares required to be supplied by vendor. | 1 | LS | 25,200 ₹33,200 | 16,000 ₹41,000 | 20,000 ₹52,000 | 13,800 ₹38,800 | 20,800 ₹50,800 | 12,400 ₹22,400 Lowest | 24,500 ₹34,100 |
| 5.00 | SHIP LUB OIL SYSTEM:
Calibrate all instrumentation in the system. Renew defective instrumentations. Instrumentation includes Pressure Transmitters (Range 0-10 Bar, Qty: 15). Satisfactory trials to be offered to Ship Staff. (15 NOS)
NOTE: All spares required to be supplied by vendor. | 1 | LS | 47,250 ₹71,250 | 37,500 ₹1,62,500 | 47,000 ₹2,02,000 | 54,500 ₹1,34,000 | 45,000 ₹1,95,000 | 18,000 ₹30,000 Lowest | 54,200 ₹77,700 |
| 6.00 | CENTRIFUGAL PUMPS:
Calibrate all instrumentation. Defective instruments to be renewed. Instrumentation includes Pressure Transmitters (Range -1 to 5 Bar, Range 0-15 Bar), Pressure Gauges (Range -1 to 5 Bar , Range 0-15 Bar). Satisfactory trials to be offered to Ship Staff. (100 NOS)
NOTE: All spares required to be supplied by vendor. | 1 | LS | 2,68,000 ₹3,38,000 | 2,00,000 ₹5,00,000 | 2,50,000 ₹6,40,000 | 3,29,000 ₹7,94,000 | 2,40,000 ₹6,15,000 | 70,000 ₹1,20,000 Lowest | 2,65,000 ₹3,81,200 |
| 7.00 | AC CHILLED WATER SYSTEM:
Check operation of thermostats in the chilled water line and calibrate. Defective thermostats to be repaired/ replaced.
Qty - 5 each. Satisfactory trials to be offered to Ship Staff. (30NOS)
NOTE: All spares required to be supplied by vendor. | 1 | LS | 43,500 ₹58,500 | 90,000 ₹2,25,000 | 1,08,000 ₹2,78,000 | 22,500 ₹64,500 | 1,08,000 ₹2,74,000 | 15,500 ₹25,500 Lowest | 42,600 ₹57,960 |
| 8.00 | AC CHILLED WATER SYSTEM:
Refit all pressure gauges cocks. Survey associated pressure gauges pipes. Defective cocks and damaged pipe lines to be renewed. Pressure Gauge Cocks Qty - 12, size - 1/4". Satisfactory trials to be offered to Ship Staff. (12 NOS)
NOTE: All spares required to be supplied by vendor. | 1 | LS | 9,600 ₹12,600 | 18,000 ₹54,000 | 21,600 ₹69,600 | 97,000 ₹2,42,000 | 22,100 ₹66,700 | 5,000 ₹9,000 Lowest | 22,500 ₹30,000 |
| 9.00 | FRESH WATER PUMP FOR SPRINKLING SYSTEM:
Carryout functional checks of all instrumentation, alarms and sensors. Renew/ Repair defective instrumentation.
Instrumentation includes Flow Switch (Qty 21), NO/NC Sensors (Qty 21). Satisfactory trials to be offered to Ship Staff. (42 NOS)
NOTE: All spares required to be supplied by vendor. | 1 | LS | 44,100 ₹54,600 | 1,97,000 ₹3,57,000 | 3,00,000 ₹5,50,000 | 1,05,000 ₹2,80,000 | 2,56,000 ₹4,56,000 | 25,000 ₹52,500 Lowest | 1,19,750 ₹1,73,000 |
| 10.00 | SHIP FUEL SYSTEM:
Check and calibrate fuel flow meters. Renew/ repair defective fuel flow meters. Make - Rockwin, Qty 02, Range 0-300 m3/hr. Satisfactory trials to be offered to Ship Staff.(2 NOS)
NOTE: All spares required to be supplied by vendor. | 1 | LS | 95,000 ₹95,000 | 70,000 ₹1,50,000 | 85,400 ₹1,85,400 | 22,500 ₹90,500 | 87,500 ₹1,85,500 | 22,000 ₹42,000 Lowest | 3,64,000 ₹4,00,100 |
Tender Value
Refer Docs
Closing Date
24 Feb 2026, 11:00 amClosed
M(SRC-OS)
HSL
CALIBRATION OF PRESSURE TRANSMITTERS AND GAUGES OF VARIOUS SYSTEMS ON INS PROJECT
2026_HSL_98987_1
SR COMPLEX/PRODUCTION/OUT SOURCE REQUISITION/2025/818
Open Tender
Miscellaneous Services
Service
60 days
VISAKHAPATNAM
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
Exempted
20 Mar 2026
13 Feb 2026
24 Feb 2026
13 Feb 2026
24 Feb 2026
13 Feb 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | DEEP SEA SEALS:
Calibrate pressure gauges. (Qty - 02, Range - 0 to 10 Bar). Renew defective gauges. Satisfactory trials to be offered to Ship Staff.
NOTE: All spares required to be supplied by vendor (2 NOS) | 1 | LS | - | - |
| 2 | SCREW AND GEAR PUMPS:
Calibrate all instrumentation, which includes pressure transmitters (Range 0-10 Bar, 0-3 Bar), Temperature Transmitters (0-100 deg C), pressure switches (set pressure 01 Bar). Renew defective instrumentation. Satisfactory trials to be offered to Ship Staff.
NOTE: All spares required to be supplied by vendor.(103 NOS) | 1 | LS | - | - |
| 3 | MAIN ENGINE STARTING AIR BOTTLES:
Check for correct functioning of system gauges, Calibrate all. Pressure Gauge - 0-40 Bar, Qty 04. Renew defective gauges. Satisfactory trials to be offered to Ship Staff.
NOTE: All spares required to be supplied by vendor.(4 NOS) | 1 | LS | - | - |
| 4 | MAIN ENGINE STARTING AIR BOTTLES:
Carryout functional checks of all instrumentation and sensors. Undertake calibration/ repairs.Renew defective instrumentation and sensors. Instrumentation includes pressure transmitters of range 0-40 Bar (Qty 04), pressure gauges of range 0-40 Bar (Qty 04). Satisfactory trials to be offered to Ship Staff. (8 NOS)
NOTE: All spares required to be supplied by vendor. | 1 | LS | - | - |
| 5 | SHIP LUB OIL SYSTEM:
Calibrate all instrumentation in the system. Renew defective instrumentations. Instrumentation includes Pressure Transmitters (Range 0-10 Bar, Qty: 15). Satisfactory trials to be offered to Ship Staff. (15 NOS)
NOTE: All spares required to be supplied by vendor. | 1 | LS | - | - |
| 6 | CENTRIFUGAL PUMPS:
Calibrate all instrumentation. Defective instruments to be renewed. Instrumentation includes Pressure Transmitters (Range -1 to 5 Bar, Range 0-15 Bar), Pressure Gauges (Range -1 to 5 Bar , Range 0-15 Bar). Satisfactory trials to be offered to Ship Staff. (100 NOS)
NOTE: All spares required to be supplied by vendor. | 1 | LS | - | - |
| 7 | AC CHILLED WATER SYSTEM:
Check operation of thermostats in the chilled water line and calibrate. Defective thermostats to be repaired/ replaced.
Qty - 5 each. Satisfactory trials to be offered to Ship Staff. (30NOS)
NOTE: All spares required to be supplied by vendor. | 1 | LS | - | - |
| 8 | AC CHILLED WATER SYSTEM:
Refit all pressure gauges cocks. Survey associated pressure gauges pipes. Defective cocks and damaged pipe lines to be renewed. Pressure Gauge Cocks Qty - 12, size - 1/4". Satisfactory trials to be offered to Ship Staff. (12 NOS)
NOTE: All spares required to be supplied by vendor. | 1 | LS | - | - |
| 9 | FRESH WATER PUMP FOR SPRINKLING SYSTEM:
Carryout functional checks of all instrumentation, alarms and sensors. Renew/ Repair defective instrumentation.
Instrumentation includes Flow Switch (Qty 21), NO/NC Sensors (Qty 21). Satisfactory trials to be offered to Ship Staff. (42 NOS)
NOTE: All spares required to be supplied by vendor. | 1 | LS | - | - |
| 10 | SHIP FUEL SYSTEM:
Check and calibrate fuel flow meters. Renew/ repair defective fuel flow meters. Make - Rockwin, Qty 02, Range 0-300 m3/hr. Satisfactory trials to be offered to Ship Staff.(2 NOS)
NOTE: All spares required to be supplied by vendor. | 1 | LS | - | - |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.02 MB
TBID_818.pdf
Tender Documents • 0.63 MB
ANNEXURE_A.pdf
Tender Documents • 0.51 MB
BOQ_108557.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .