Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹6.6 LAccepted-Finance | L-1 | Accepted-Finance Accepted | |
| 2 | L-2₹6.6 L+₹3,667 (0.56%)Accepted-Finance | L-2 | Accepted-Finance Accepted | |
| 3 | L-3₹6.8 L+₹27,969 (4.26%)Accepted-Finance | L-3 | Accepted-Finance Accepted |
Tender Value
₹6.7 L
EMD Value
₹13,500
Closing Date
9 Jan 2020, 11:00 amClosed
EE LKD
Lower Krishna Division Room No. 413, Central Water Commission 11-4-642 Krishna Godavari Bhavan, A.C.Gaurds,Hyderabad -500004 Phone no 040-29809650
Construction of Compound wall at CWC Site- Keesara UNDER LOWER KRISHNA DIVISION, CWC, HYDERABAD
2019_CWC_529856_1
LKD/HYD/2019-20/05
Open Tender
Civil Works
Works
60 days
Keesara
As per Tender Document
2 documents required · 2 mandatory
₹500
Yes
EE LKD
₹13,500
Yes
13 Jan 2020
23 Dec 2019
13 Jan 2020
24 Dec 2019
9 Jan 2020
24 Dec 2019
24 Dec 2019 - 8 Jan 2020
Amount
Construction of Compound Wall at CWC Land Keesara
Removing wire fencing with Iron/C.C. fencing posts and stacking the material as directed with all leads lifts complete specifications as directed by Engineer-in charge.
Earth work in excavation by mechanical means (Hydraulic excavation)/manual means in foundation trenches or drains (not exceeding 1.50 Mts. In width or 10 sqmts. on plan), including dressing of sides ramming of bottoms, lift up to 1.50 Mt., including getting out the excavated soil and disposal of surplus excavated soil as directed, with in a lead of 50m. All kinds of soil
Providing and laying in position cement concrete of grade 1:3:6 (1 cement: 3 Coarse: 6 graded stone aggregate 20 mm nominal size) excluding the cost of centring and shuttering.
Providing and laying in position specified grade of reinforced cement concrete excluding the cost of centring and shuttering, finishing and reinforcement. All works up to Plinth Level. 1: 1.5: 3 (1 Cement:1.5 Coarse sand:3 graded stone aggregate 20mm nominal size)
Centring and shuttering including strutting, propping etc., and removal of from work for foundations, footings, bases for columns.
Centring and shuttering including strutting, propping etc., and removal of from work for Columns, Piers, Abutments, Pillars, posts and trysts.
Brick Masonry with C.M.(1:6) using first class bricks including cost and conveyance curing etc., complete.
Plastering with C.M.(1:4) 12 mm thick including cost of all materials, labour, scaffolding, smooth finishing , curing with initial lead up to 50 mts. And all lifts etc., complete.
White washing with best snowcem with two coats including cost and conveyance of all materials and curing etc., complete.
Steel reinforcement for RCC work including straightening, cutting, bending, placing in position and binding all complete up to plinth level for mild steel and medium tensile steel bars.
Phaneendra varma works contractor
BHANUCONSTRUCTIONS
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .