Tender Value
₹12.5 Cr
EMD Value
₹12.5 L
Closing Date
16 Sept 2026, 6:00 pmClosed
Executive Engineer, R&B Division, Bhuj
Widening and Strengthening of Mundra to Mundra Old Port Road at Ch.0/000 to 9/300 (Section Ch.2/500 to 9/300Km), Dist. Kutch
342326
47 For 2026-27
Open
Repair and Maintenance
Works
Kutch
15 documents required · 15 mandatory
₹18,000
Executive Engineer, R&B Division, Bhuj
₹12.5 L
5 Sept 2026
5 Sept 2026
5 Sept 2026
16 Sept 2026
5 Sept 2026
Name of work :-
Widening and Strengthening of Mundra to Mundra Old Port Road at Ch.0/000
to 9/300 (Section Ch.2/500 to 9/300Km), Dist. Kutch
Bill of Quantity
Memorandum showing items of works to be carried out.
It. Qty. Item of work Estimated Rates Unit Total amount
It. Qty. Item of work Estimated Rates Unit Total amount
No. Estimated In Figures In Words
but may be estimated Quantities
1 6.07 Clearing and grubbing road land 28393.04 Rupees Twenty Hecter
including uprooting rank Eight Thousand
vegetation, grass, bushes, shrubs, Three Hundred
saplings and trees girth up to 300 Ninety Three
mm, removal of stumps of trees cut And Paise Four
earlier and disposal of Only
unserviceable material. (C) By
mechenical means in area of light
2 14985.00 Earthwork for embankment 169.44 Rupees One Cum
including breaking clods, dressing Hundred Sixty
with all lead and lift and including Nine And Paise
watering rolling and consolidation Forty Four Only
of subgrade in layers at O.M.C. to
required dry density including filling
the depression which occur during
the process using power roller 8T to
10T. (Including all lead and lift) (Soil
having CBR >=10%)
3 3755.50 Dismantling of Flexible Pavements : 420.52 Rupees Four Cum
Dismantling of flexible pavements Hundred
and disposal of dismantled Twenty And
materials up to a lead of 1000 Paise Fifty Two
metres, stacking serviceable and Only
unserviceable materials separately.
(ii) By Mechanical means (a)
Bituminous Courses.
4 65768.36 Box cutting the road surface to 104.04 Rupees One Cum
proper slope and camber for making Hundred Four
a base for road work including And Paise Four
removing the excavated stuff and Only
depositing on the road side slope as
directed upto 50Mt.lead.
5 34614.93 Construction of 500 mm thick 596.54 Rupees Five Cum
compacted of SUBGRADE (with Hundred Ninety
unscreened gravel and coarse Sand) Six And Paise
including watering up to OMC, Fifty Four Only
rolling, and consolidation with
vibratory roller, levelling with motor
grader etc as directed.( CBR not less
than 20%) (RA-1)
It. Qty. Item of work Estimated Rates Unit Total amount
It. Qty. Item of work Estimated Rates Unit Total amount
No. Estimated according to
but may be In Figures In Words estimated Quantities
6 13159.37 Construction of granular Sub base 1118.94 Rupees One Cum
by providing GSB Grade-V coarse Thousand One
graded material BTMC using Hundred
aggregate 26.5 mm to 9.5 mm @ Eighteen And
64%, 9.5 mm to 4.75 mm @ 11% Paise Ninety
and stone dusts 4.75 mm and Four Only
below @ 25% incl. spreading in
uniform layers with motor grader on
prepared surface mixing by mix in
place method with rotavator at
OMC and compacting with vibratory
roller to achieve the desired density
complete as per Clause 401.2 Table
7 8760.10 Providing and laying spreading and 1020.65 Rupees One Cum
compacting graded stone aggregate Thousand
to wet mix macadam 250 mm thick Twenty And
as per MORT&H specification Paise Sixty Five
including pre mixing the material Only
with water at OMC in mechanical
mix plant, carriage of mixed
material by tippers to site, laying in
uniform layers with paver in sub
base/ base course on well prepared
surface and compacting with
vibratory roller to achieve the desire
density. (RA-4)
8 36200.35 Providing & laying priming coat 60.84 Rupees Sixty Sqm
with emulsion SS-1 grade and And Paise
spraying emulsion with spray set Eighty Four
fitted on mechanical bouzer using Only
emulsion at the rate of 7.5 Kg./10
Sqm. On WMM surface incl.
cleaning the surface etc. complete.
It. Qty. Item of work Estimated Rates Unit Total amount
It. Qty. Item of work Estimated Rates Unit Total amount
No. Estimated according to
but may be In Figures In Words estimated Quantities
9 3529.38 Providing and laying 50 mm Thick 2465.08 Rupees Two MT
Bitumious Mecadam B.T. Aggregate Thousand Four
as per MORT & H specification and Hundred Sixty
VG-40 for tack coat @ 2.50 Kg./10 Five And Paise
smt. with Mechanical sprayer & Eight Only
Bitumen Grade VG-40 for mixing @
34 Kg./Mt. i.e. 3.40 % by weight of
total mix including heating and
mixing the aggregate & asphalt in
continuous batch mix plant and
spreading the same by sensor paver
finisher & consolidation with
vibratory roller including providing
all materials equipments, tools &
plant, fire wood, oil, kerosene,
labour charges etc. complete using
contractor’s own machinery drum
mix plant & paver finisher etc.
complete (RA-7)
10 3689.81 Providing and laying 50 mm D.B.M. 2923.83 Rupees Two MT
with B.T. Aggregate as per MORT&H Thousand Nine
specification with VG-30 for tack Hundred
coat @ 2.5 Kg./10 smt. With Twenty Three
Mechanical Sprayer & Bitumen VG- And Paise
30 Grade for mixing @ 45.00 Eighty Three
Kg./MT. ie. 4.5 % by total weight of Only
mix heating and mixing the
aggregate & asphalt in continuous
batch mix plant and transporting to
site and spreading the same by
sensor paver finisher &
consolidation with vibratory roller
including providing all materials
equipments, tools & plant, fire
wood, oil, kerosene, labour charges
etc. complete using contractor's
own machinery batch mix plant &
sensor paver finisher etc. complete.
It. Qty. Item of work Estimated Rates Unit Total amount
It. Qty. Item of work Estimated Rates Unit Total amount
No. Estimated according to
but may be In Figures In Words estimated Quantities
11 2347.51 Providing and laying 30 mm thick 3226.27 Rupees Three MT
Bituminous concrete on existing Thousand Two
bituminous surface and using Hundred
specification graded machine Twenty Six And
crushed with 5.50 % bitumen VG- Paise Twenty
30 grade by Wt. of total mix as per Seven Only
specification MORTH including
mixing of asphalt with B.T. chips in
continuous batch mix plant
transporting same as by paver
finisher and consolidation the same
with pair of 8 tonnes to 10 tonnes
vibratory roller to achieve desire
density and including VG-30 grade
bitumen, cost of emulsion, cost of
required tools , plants, all
machineries, equipment fire wood
oil, kerosene, charges etc.complete.
12 3033.00 Providing 150 mm thick compacted 574.08 Rupees Five Cum
side shoulder of Quarry Spall on Hundred
road site including collection of Seventy Four
material spreading, rolling of And Paise Eight
watering etc. complete as Only
directed.(RA-6)
13 315.00 Supplying and fixing reinforced 1952.00 Rupees One Rmt
concrete heavy duty nonpressure Thousand Nine
pipes with collars for culverts Hundred Fifty
carrying heavy traffic as per IS 458- Two Only
1991 specifications including
setting the pipes in C.M. 1:2
watering and laying (to level or
slopes) of class NP3 of following
internal daimeters.(i) 600mm dia.
14 3537.28 Excavation for foundation in sand, 486.77 Rupees Four Cum
gravel, clay soft soils and murrum Hundred Eighty
etc. including shoring, strutting Six And Paise
dewatering as necessary and Seventy Seven
disposing of the excavated stuff as Only
directed.(A) Depth upto 3.0 M. and
lead upto 100m for 10 Cum
15 2131.44 Providing and casting in situ 3636.74 Rupees Three Cum
Ordinary cement concrete M-150 Thousand Six
for R.C.C. Raft and cut-off walls Hundred Thirty
including necessary shuttering Six And Paise
laying, vibrating, ramming and Seventy Four
curing complete. Only
It. Qty. Item of work Estimated Rates Unit Total amount
It. Qty. Item of work Estimated Rates Unit Total amount
No. Estimated according to
but may be In Figures In Words estimated Quantities
16 2016.85 Providing and casting in situ 5358.00 Rupees Five Cum
controlled cement concrete M- 350 Thousand
for R.C.C. return as per drawings Three Hundred
including centering shuttering, Fifty Eight Only
scaffolding where necessary, laying
vibrating, curing and finishing
complete.(A) Height from 0.0 to
M. (1) Piers (2) Abutment (3) RCC
17 184.28 Providing and casting in situ 5388.23 Rupees Five Cum
controlled cement concrete M-300 Thousand
for average 75 mm thick wearing Three Hundred
coat laid as directed dincluding Eighty Eight
tamping, vibrating, finishing, And Paise
curing and fillingin joints with Twenty Three
bitumen complete Only
18 32.01 Providing and laying in position FE 73217.53 Rupees Seventy MT
500D TMT bar reinforcement Three
including cutting, bending, hooking Thousand Two
and tying complete as per detailed Hundred
drawings for the following For RCC Seventeen And
Raft, Pier, Top Slab, Cuttoff walls Paise Fifty
etc. comp. All R.C.C. Work. Three Only
19 1.98 Providing fusion bonded Epoxy 10162.62 Rupees Ten MT
coating not less than 175 micron Thousand One
thickness and up to 300 micron to Hundred Sixty
reinforcement bars as per IS-13620- Two And Paise
1993/ASTM-775 M including Sixty Two Only
testing of coating at plant and all
taxes (A) 10mm to 16mm dia bar
20 667.09 Providing Rubble pitching of 300 853.45 Rupees Eight Sqm
mm. average thickness including Hundred Fifty
pointing mortar with C.M.1 : 3 (1 Three And
cement : 3 sand) etc. complete Paise Forty Five
21 28.00 Numbering the C.D. Work with 58.80 Rupees Fifty Nos
approved paint including all Eight And Paise
materials for paintings etc. complete Eighty Only
22 891.00 Providing and laying weep hole in 82.57 Rupees Eighty Nos
abutmemt and returning by using Two And Paise
A.C. pipes / PVC Pipe of 100 mm. Fifty Seven Only
Diameter including laying in priper
grade and joining etc. comp as per
detailed specifications.
23 233.62 Providing & laying rubble for apron 1041.05 Rupees One Cum
(each) stone weight not less than 40 Thousand
Kg including packing & filling in the Forty One And
instrestices with qyarry spalls Paise Five Only
It. Qty. Item of work Estimated Rates Unit Total amount
It. Qty. Item of work Estimated Rates Unit Total amount
No. Estimated according to
but may be In Figures In Words estimated Quantities
24 555.00 Supplying and fixing reinforced 6595.90 Rupees Six Rmt
concrete heavy duty non-pressure Thousand Five
pipes with collars for culverts Hundred Ninety
including setting and joining the Five And Paise
pipes in C.M. 1:2 watering and Ninety Only
laying (To level of slops of I.S. 458 /
1971 Class NP4 casted by vertically
vibrated technology of following
internal diameter 1200mm dia.
25 340.00 Providing and fixing indicator stone 343.27 Rupees Three No.
of approved stone as per I.R.C. type Hundred Forty
design in C.C. 1:4:8 including white Three And
washing etc. complete.(ii) Fixing in Paise Twenty
C.C. 1:5:10 Seven Only
26 37.00 Providing and fixing guard stone as 349.11 Rupees Three No.
per I.R.C. type design including Hundred Forty
white washing etc. complete.(ii) Nine And Paise
Fixing in C.C. 1:5:10 Eleven Only
27 55.00 Providing and fixing Hectometer as 356.50 Rupees Three No.
per I.R.C. type design including Hundred Fifty
painting, lettering etc. complete.(ii) Six And Paise
Fixing in C.C. 1:5:10 Fifty Only
28 13.00 Providing and fixing ordinary 1290.57 Rupees One No.
kilometer stone of pre-cast C.C. Thousand Two
1:2:4 including necessary Hundred Ninety
reinforcement as per I.R.C. type And Paise Fifty
design including fixing in C.C. Seven Only
1:4:8 including painting, lettering
etc. complete ( For N.H., S.H. and
29 1.00 Providing and fixing 5th Kilometer 1935.15 Rupees One No.
stone of precast C.C. 1:2:4 Thousand Nine
including necessary reinforcement Hundred Thirty
as per I.R.C. type design in C.C. Five And Paise
1:4:8 including painting,lettering Fifteen Only
etc.complete (For N.H., S.H. and
It. Qty. Item of work Estimated Rates Unit Total amount
It. Qty. Item of work Estimated Rates Unit Total amount
No. Estimated according to
but may be In Figures In Words estimated Quantities
30 2745.00 Road marking with hot applied 367.72 Rupees Three Sqm
thermoplastic paints with Hundred Sixty
reflectorising glass beads on Seven And
bitumin surface providing and Paise Seventy
laying a hot applied thermoplastic Two Only
compound 2.5 mm thick including
reflectorising glass beads @ 250gms
per sqm area, thickness of 2.5mm
is excluding of surface applied glass
beds as per IRC:35-2015. The
finished surface to be level, uniform
and free from streaks and holes.
zebra patta /bump patta
lane/center line/ edge line/cut
patta. The white color marking
should provide liminance coefficinet
on cemend road shalll be min
mcd/m2/lux and Asphalt road
shall be min 100 mcd/m2/lux
during the service life during the
day time. The marking should meet
the performance criteria for night
time reflectivity, wet reflectivity and
skid resistance as mentioned in the
section-15 of IRC 35-2015.
Warranty for the Retro reflectivity
should be two years.
31 2304.00 Cat Eye / Road Stud / RPM: 326.23 Rupees Three No.
Supplying of Molded Twin Shanks Hundred
Raised Pavement Markers made of Twenty Six And
polycarbonate and ABS moulded Paise Twenty
body and reflective panels with Three Only
micro prismatic lens capable of
providing total internal reflection of
the light entering the lens face and
shall support a load of 13635 kgs.
tested in accordance to ASTM D
4280 Type H and complying to
Specifications of Category A of
MORTH Circular No
RW/NH/33023/10-97 DO III Dt
11.06. 1997. The height, width and
length shall not exceed 20 mm,
mm and 130 mm and with
minimum reflective area of 13 Sqcm
on each side and the slope to the
base shall be 35 +/- 5 degree. The
strength of detachment of the
integrated cylindrical shanks, (of
diameter not less than 19 +/- 2 mm
and height not less than 30+/-
mm) from the body is to be a
minimum value of 500 Kgf. Fixing
will be by drilling holes on the road
for the shanks to go inside, without
It. Qty. Item of work Estimated Rates Unit Total amount
It. Qty. Item of work Estimated Rates Unit Total amount
No. Estimated according to
but may be In Figures In Words estimated Quantities
32 44.00 Cautionary Warning Sign :- 5077.27 Rupees Five No.
Providing and fixing sign boards Thousand
made out of 2mm aluminium sheet Seventy Seven
/ 4mm ACP (Aluminum composite And Paise
Panel); size 90 x 90 x 90 cms. Twenty Seven
equilateral triangle as per design of Only
IRC-67-2012. Pre treated with
phospheting process & acid etching;
coated with one coat of epoxy
primer and two coats of best quality
epoxy paint ;reflectorised with Micro
Prismatic Grade retro
refiectivesheeting of Type-11 as per
ASTMD-4956 and latest
M.O.S.T.Specifications; 3.6mtr long
stand post of 75 x 75 x 6mm /
65NB Circular MS Pipe as required
and frame fabricated from suitable
size iron angle of 35 x 35 x 3mm;
painted with bestquality epoxy
coatings in black and white bends.
The details of symbol for each board
shall be as per theinstruction of
engineer in charge. The fixing at site
shall be in 1:2:4 CC blockof size
x 45 x 60 Cms. for each
leg.including excavation, curing
etc.complete under the supervision
33 28.00 Regulatory / Mandatory Sign :- 4618.73 Rupees Four No.
Providing and fixing sign boards Thousand Six
made out of 2mm aluminium sheet Hundred
/ 4mm ACP (Aluminum composite Eighteen And
Panel); size 60 cms Dia Circle as per Paise Seventy
design of IRC-67-2012. Pre treated Three Only
with phospheting process & acid
etching; coated with one coat of
epoxy primer and two coats of best
quality epoxy paint;reflectorised
with Micro Prismatic Grade retro
refiectivesheeting of Type-11 as per
ASTM D-4956 and latest
M.O.S.T.Specifications; 3.6mtr long
stand post of 75 x 75 x 6mm /
65NB Circular MS Pipe as required
and frame fabricated from suitable
size iron angle of 35 x 35x 3mm;
painted with bestquality epoxy
coatings in black and white bends.
The details of symbol for each board
shall be as per theinstruction of
engineer in charge. The fixing at site
shall be in 1:2:4 CC blockof size
x 45 x 60 Cms. for each
leg.including excavation, curing
etc.complete under the supervision
of engineer in charge. A warranty
It. Qty. Item of work Estimated Rates Unit Total amount
It. Qty. Item of work Estimated Rates Unit Total amount
No. Estimated according to
but may be In Figures In Words estimated Quantities
34 6.00 STOP Sign :-Providing and fixing 7213.42 Rupees Seven No.
sign boards made out of 2mm Thousand Two
aluminium sheet / 4mm ACP Hundred
(Aluminum composite Panel); size Thirteen And
90 cms Octagone as per design of Paise Forty Two
IRC-67-2012. Pre treated with Only
phospheting process & acid etching;
coated with one coat of epoxy
primer and two coats of best quality
epoxy paint ;reflectorised with Micro
Prismatic Grade retro
refiectivesheeting of Type-11 as per
ASTM D-4956 and latest
M.O.S.T.Specifications; 3.6mtr long
stand post of 75 x 75x 6mm / 65NB
Circular MS Pipe as required and
frame fabricated from suitable size
iron angle of 35 x 35 x 3mm;
painted with bestquality epoxy
coatings in black and white bends.
The details of symbol foreach board
shall be as per theinstruction of
engineer in charge. The fixing at site
shall be in 1:2:4 CC blockof size
x 45 x 60 Cms. for each
leg.including excavation, curing
etc.complete under the supervision
of engineer in charge. A warranty
35 6.00 Direction (Junction) Sign :-Providing 26572.09 Rupees Twenty No.
and fixing sign boards made out of Six Thousand
2mm aluminium sheet / 4mm ACP Five Hundred
(Aluminum composite Panel); size Seventy Two
244x122 cms. rectangular as per And Paise Nine
design of IRC-67-2012. Pre treated Only
with phospheting process & acid
etching; coated with one coat of
epoxy primer and two coats of best
quality epoxy paint ;reflectorised
with Micro Prismatic Grade retro
refiectivesheeting of Type-11 as per
ASTM D-4956 and latest
M.O.S.T.Specifications; 4.0mtr long
(2 Nos.) stand post of 75 x 75 x
6mm / 65NB Circular MS Pipe as
required and frame fabricated from
suitable size iron angle of 50 x 50 x
5mm; painted with bestquality
epoxy coatings in black and white
bends. The details of symbol for
each board shall be as per
theinstruction of engineer in charge.
The fixing at site shall be in 1:2:4
CC blockof size 45 x 45 x 60 Cms.
for each leg.including excavation,
curing etc.complete under the
supervision of engineer in charge. A
It. Qty. Item of work Estimated Rates Unit Total amount
It. Qty. Item of work Estimated Rates Unit Total amount
No. Estimated according to
but may be In Figures In Words estimated Quantities
36 6.00 Distance Informatory / Destination 20918.11 Rupees Twenty No.
Sign :-Providing and fixing sign Thousand Nine
boards made out of 2mm Hundred
aluminium sheet / 4mm ACP Eighteen And
(Aluminum composite Panel); size Paise Eleven
180x120 cms. rectangular as per Only
design of IRC-67-2012. Pre treated
with phospheting process & acid
etching; coated with one coat of
epoxy primer and two coats of best
quality epoxy paint ;reflectorised
with Micro Prismatic Grade retro
refiectivesheeting of Type-11 as per
ASTM D- 4956 and latest
M.O.S.T.Specifications; 4.0mtr long
(2 Nos.) stand post of 75 x 75 x
6mm / 65NB Circular MS Pipe as
required and frame fabricated from
suitable size iron angle of 50 x 50 x
5mm; painted with bestquality
epoxy coatings in black and white
bends. The details of symbol
foreach board shall be as per
theinstruction of engineer in charge.
The fixing at site shall be in 1:2:4
CC blockof size 45 x 45 x 60 Cms.
for each leg.including excavation,
curing etc.complete under the
37 6.00 Place Identification Sign :-Providing 14085.46 Rupees No.
and fixing sign boards made out of Fourteen
2mm aluminium sheet / 4mm ACP Thousand
(Aluminum composite Panel); size Eighty Five And
150x90 cms. rectangular as per Paise Forty Six
design of IRC-67-2012. Pre treated Only
with phospheting process & acid
etching; coated with one coat of
epoxy primer and two coats of best
quality epoxy paint ;reflectorised
with Micro Prismatic Grade retro
refiectivesheeting of Type-11 as per
ASTM D-4956 and latest
M.O.S.T.Specifications; 4.0mtr long
(2 Nos.) stand post of 75 x 75 x
6mm / 65NB Circular MS Pipe as
required and frame fabricated from
suitable size iron angle of 35 x 35 x
3mm; painted with bestquality
epoxy coatings in black and white
bends. The details of symbol for
each board shall be as per
theinstruction of engineer in charge.
The fixing at site shall be in 1:2:4
CC blockof size 45 x 45 x 60 Cms.
for each leg.including excavation,
curing etc.complete under the
supervision of engineer in charge. A
It. Qty. Item of work Estimated Rates Unit Total amount
It. Qty. Item of work Estimated Rates Unit Total amount
No. Estimated according to
but may be In Figures In Words estimated Quantities
38 6.00 Village Name Sign :-Providing and 6313.51 Rupees Six No.
fixing sign boards made out of 2mm Thousand
aluminium sheet / 4mm ACP Three Hundred
(Aluminum composite Panel); size Thirteen And
90x60 cms. rectangular as per Paise Fifty One
design of IRC-67-2012. Pre treated Only
with phospheting process & acid
etching; coated with one coat of
epoxy primer and two coats of best
quality epoxy paint ;reflectorised
with Micro Prismatic Grade retro
refiectivesheeting of Type-11 as per
ASTM D-4956 and latest
M.O.S.T.Specifications; 3.3mtr long
stand post of 75 x 75 x 6mm /
65NB Circular MS Pipe as required
and frame fabricated from suitable
size iron angle of 35 x 35 x 3mm;
painted with bestquality epoxy
coatings in black and white bends.
The details of symbol or
inscription/letters / numerals for
each board shall be as per the
instruction of engineer in charge.
The fixing at site shall be in 1:2:4
CC blockof size 45 x 45 x 60 Cms.
for each leg.including excavation,
curing etc.complete under the
39 25.00 Chevron sign :-Providing and fixing 4681.35 Rupees Four No.
sign boards made out of 1.5mm Thousand Six
aluminium sheet / 3mm ACP Hundred Eighty
(Aluminum composite Panel); size One And Paise
60x50 cm as per design of IRC-67- Thirty Five Only
2012. Pre treated with phospheting
process & acid etching; coated with
one coat of epoxy primer and two
coats of best quality epoxy paint
;reflectorised with Micro Prismatic
Grade retro refiectivesheeting of
Type-11 as per ASTM D-4956 and
latest M.O.S.T.Specifications;
mtr long stand post of 75 x 75 x
6mm / 65NB Circular MS Pipe as
required and frame fabricated from
suitable size iron angle of 50 x 50 x
5mm; painted with bestquality
epoxy coatings in black and white
bends. the details of symbol or
inscription / numerals for each
board shall be as per the
instruction of engineer in
charge.The fixing at site shall be in
1:2:4 CC blockof size 45 x 45 x
Cms. for each leg.including
excavation, curing etc.complete
under the supervision ofengineer in
It. Qty. Item of work Estimated Rates Unit Total amount
It. Qty. Item of work Estimated Rates Unit Total amount
No. Estimated according to
but may be In Figures In Words estimated Quantities
40 48.00 Hazard Marker Sign :-Providing and 3666.30 Rupees Three No.
fixing sign boards made out of 2.0 Thousand Six
mm aluminium sheet / 4 mm ACP Hundred Sixty
(Aluminum composite Panel); size Six And Paise
90x30 cms. rectangular as per Thirty Only
design of IRC-67-2012. Pre treated
with phospheting process & acid
etching; coated with one coat of
epoxy primer and two coats of best
quality epoxy paint ;reflectorised
with Micro Prismatic Grade retro
refiectivesheeting of Type-11 as per
ASTM D-4956 and latest
M.O.S.T.Specifications; 1.8mtr long
stand post of 75 x 75 x 6mm /
65NB Circular MS Pipe as required
and frame fabricated from suitable
size iron angle of 35 x 35 x 3mm;
painted with bestquality epoxy
coatings in black and white bends.
The details of symbol foreach board
shall be as per theinstruction of
engineer in charge. The fixing at site
shall be in 1:2:4 CC blockof size
x 45 x 60 Cms. for each
leg.including excavation, curing
etc.complete under the supervision
of engineer in charge. A warranty
41 80.00 Type - B, "THRIE" : Metal Beam 4071.31 Rupees Four Rmt
Crash Barrier (Providing and Thousand
erecting a"Thrie" metal beam crash Seventy One
barrier comprising of 3 mm thick And Paise
corrugated sheet metal beam rail, Thirty One Only
85 cm above road/ground level,
fixed on ISMC series channel
vertical post, 150 x 75 x 5 mm
spaced 2 m centre to centre, 2 m
high with 1.15 m below ground
level, all steel parts and fitments to
be galvanised by hot dip process, all
fittings to conform to IS:1367 and
IS:1364, metal beam rail to be fixed
on the vertical post with a space of
channel section 150 x 75 x 5 mm,
546 mm long complete as per
It. Qty. Item of work Estimated Rates Unit Total amount
It. Qty. Item of work Estimated Rates Unit Total amount
No. Estimated according to
but may be In Figures In Words estimated Quantities
42 900.28 Providing Yellow and Black Patta 88.62 Rupees Eighty Smt
(three coat) including distempeing Eight And Paise
(Three coats) with oil bound Sixty Two Only
distemper of approved brandand
manufacture and of required shade
on wall surfaces to give an even
shade , over and including a
priming coat with distemper primer
of approved brand and manufacture
after thoroughly brushing the
surface free from mortar dropping
and other foreign matter and also
including preparing the surface
even and sand papered smooth as
per instruction of Engineer Incharge.
43 4830.00 Excavation for foundation upto 1.5 241.79 Rupees Two Cum
m depth including sorting out and Hundred Forty
stacking of useful materials and One And Paise
disposing off the excavated stuff Seventy Nine
upto 50 Meter lead.(B) Dense or Only
44 905.35 Providing and filling in foundation 3227.94 Rupees Three Cum
with cement concrete M 100 mix Thousand Two
and providing necessary vertical pin Hundred
headers including Twenty Seven
formwork,vibrating,ramming and And Paise
curing complete. (more than Ninety Four
45 438.00 Supplying and fixing reinforced 3314.79 Rupees Three Rmt
concrete heavy duty non-pressure Thousand
pipes with collars for culverts Three Hundred
including setting and joining the Fourteen And
pipes in C.M. 1:2 watering and Paise Seventy
laying (To level of slops of I.S. 458 / Nine Only
1971 Class NP3 casted by vertically
vibrated technology of following
internal diameter. (iv) 900 mm dia.
46 429.00 Construction of granular Sub base 1038.85 Rupees One Cmt
(GSB grade-III) by providing coarse Thousand
graded material gravel using size Thirty Eight
26.5 mm to 4.75@ 75%, 2.36 mm And Paise
and below @ 25% spreading in Eighty Five Only
uniform layers with motor grader on
prepared surface mixing by mix in
place method with rotavator at
OMC and compacting with vibratory
roller to achieve the desired density
complete as per Clause 401.2 Table
It. Qty. Item of work Estimated Rates Unit Total amount
It. Qty. Item of work Estimated Rates Unit Total amount
No. Estimated according to
but may be In Figures In Words estimated Quantities
47 2100.00 Providing & applying evenly Tack 12.37 Rupees Twelve Sqm
coat with Emulsion RS-1 on And Paise
prepared surface of granular base Thirty Seven
including cleaning of road Only
surface and sparying primer at
the rate of 2.50 Kg. / 10 Smt
using using mechanical means.(RA-
48 96.60 Providing & laying 20mm thick 3055.72 Rupees Three MT
premix seal surfacing using Thousand Fifty
specified graded machine crushed Five And Paise
aggregates with VG-30 grade Seventy Two
bitumen at the rate of 5.09 % i.e. Only
50.90 Kg/ M.T. by weight mix
including heating & mixing in drum
mix plant transporting the mix
spreading the same by paver
finisher and consolidation by
vibratory roller as per MORT&H
specification including cost of all
materials fuel, labours, tools and
plant etc. comp. and flushind
Stone Dust @ rate of 0.30 cmt /
100 smt. (RA-9)
49 4.00 Men at work (Heavy) sign :- 12211.91 Rupees Twelve No.
Providing and fixing sign boards Thousand Two
made out of 2mm aluminium sheet Hundred
/ 4mm ACP (Aluminium composite Eleven And
Panel); size 120x90 cms. as per Paise Ninety
design of IRC - 67-2012. Pre treated One Only
with phospheting process & acid
eatching; coated with one coat of
epoxy primer and two coats of best
quality epoxy paint; reflectorised
with High Intensity Prismatic Grade
reto refiectivesheeting of Type - 4 as
per ASTM D- 4956 and latest
M.O.S.T. Specifications; 3.6mtr long
stand post (2 nos.) of iron Angle
x 75 x 6mm / 65NB Circular MS
Pipe as required and frame
fabricated from suitable size iron
angle of 35 x 35 x 3mm; painted
with best quality epoxy coatings in
black and white bends. The details
of symbol for each board shall be as
per the instruction of engineer in
charge. The fixing at site shall be in
1:2:4 CC block of size 45 x 45 x
Cms. for each leg including
exavation, curing etc. complete
under the supervision of engineer in
It. Qty. Item of work Estimated Rates Unit Total amount
It. Qty. Item of work Estimated Rates Unit Total amount
No. Estimated according to
but may be In Figures In Words estimated Quantities
50 8.00 Diversion Ahead Sign :-Providing 10671.66 Rupees Ten No.
and fixing sign boards made out of Thousand Six
2mm aluminium sheet / 4mm ACP Hundred
(Aluminium composite Panel); size Seventy One
180x60 cms. rectangular as per And Paise Sixty
design of IRC - 67-2012. Pre treated Six Only
with phospheting process & acid
eatching; coated with one coat of
epoxy primer and two coats of best
quality epoxy paint; reflectorised
with High Intensity Prismatic Grade
reto refiectivesheeting of Type - 4 as
per ASTM D- 4956 and latest
M.O.S.T. Specifications; 3.1mtr long
stand post (2 nos.) of iron Angle
x 75 x 6mm / 65NB Circular MS
Pipe as required and frame
fabricated from suitable size iron
angle of 35 x 35 x 3mm; painted
with best quality epoxy coatings in
black and white bends. The details
of symbol for each board shall be as
per the instruction of engineer in
charge. The fixing at site shall be in
1:2:4 CC block of size 45 x 45 x
Cms. for each leg including
exavation, curing etc. complete
under the supervision of engineer in
51 4.00 Installation of a steel portable 2927.99 Rupees Two No.
barricade with horizontal rail 300 Thousand Nine
mm wide, 2.5 m in length fitted on Hundred
a 'A' frame made with 45 x 45 x 5 Twenty Seven
mm angle iron section, 1.5 m in And Paise
height, horizontal rail painted (2 Ninety Nine
coats) with yellow and white stripes, Only
150 mm in width at an angle of
450, 'A' frame painted with 2 coats
of yellow paint, complete as per
IRC:SP:55-2014 ( As per NH SOR It
Rupees Twelve Crore Fifty One Lakh(s) Thirty Nine Thousand Three Hundred Ninety Seven And
Paise Sixty Only
*Estimated amount *Estimated amount
Put to tender Rs……………………… Put to tender Rs………………………
Deduct : ………% below Add : ………% above
Net Rs……………………… Net Rs………………………
In words ……………………………… In words ………………………………
*(please strike out whichever is not applicable)
Note-1 All works shall be carried out as per Public Works Department Handbook and other specifications of
Division or as directed.
It. Qty. Item of work Estimated Rates Unit Total amount
It. Qty. Item of work Estimated Rates Unit Total amount
No. Estimated according to
but may be In Figures In Words estimated Quantities
Note-3 Rates quoted include clearance of site (prior commencement of work and its close) in all respects and
hold good for work under all conditions, site, moisture, weather etc.
Note-5 Testing Charges for the quality of material shall be recovered as per SBD
Note-6 Credit of dismantled materials of amount of Rs.24,07,170.16 shall be recovered from Contractor's bills
as per schedule of dismantled material on Prorata basis.
Note-8 pnMU VG[ BF6 lJEFU4 ;lRJF,I4 UF\WLGUZGF 9ZFJ S|DF\So V[DPV[DPVFZPv !!Z___vZ_!#vK4
TFP!q)qZ__$ YL ZFHI ;ZSFZGF AF\WSFD DF8[ J5ZFTF UF{6vBlGHGL ZMI<8L ;FNL DF8L VG[ ;MO8 DMZD 5Z ZMI<8L
Note-9 Labour Cess shall be recovered as per SBD
Note-10 Quantity of items may reduce or increase as per work execution.
Note-11 p5ZMST SFD SM.56 SFZ6;Z D\H]Z q GFD\H]Z SZJFGL ;œF ;CL SZGFZ VlWSFZLGL VAFlWT ZC[X[P
Note-13 In RCC items where there is change of grade mix or change as per actual mix design the difference of
cement consumption shall be deducted from rate of original item at the rate of star rate mentioned in
tender. However for Increase in quantity of cement no additional payment shall be made.
Note-14 For earthquake resistance provision the work shall be carried out as per the instruction of Engineer in-
Note-16 CM8DL1F %,Fg8 VG[ 5[JZYL YTF 0FDZGF SFDM AFAT[ ;ZSFZzLGF DFP VG[ DP lJEFU4 UF\WLGUZGF 5lZ5+
G\PV[;V[RVFZq!5(&qVF.ALq!*)s&fv;4 TFPZ_q!q_* VG[ 5ZL5+ S|DF\SP5ZRq!_qZ_!5q55q;L4
TFP_$q!!q!5 D]HA VG];ZJFG]\ ZC[X[P
Note-17 U]HZFT ;ZSFZzLGF DFPDPlJEFUGF 5lZ5+ S|DF\So VFZHLV[Gq&_Z__&qs#5fv; YL NFB, YI[, XZTMP
1) 5_DLDLYL JW] 0FDZ SFDGL ;\I]ST HF0F. sALPV[;PHLP4 ALPALPV[DP l;JFIf CMI T[JF Z:TFGF SFDDF\ NZ Z5_DLP NL9
V[S S|M; ;[SXG 5Z 0FDZSFDGL 5CM/F. VG];FZ A[ YL RFZ SMZ ;[d5, .HFZNFZ[ 5MTFGF SMZ S8L\U DXLG J0[ ;\A\lWT
GFIA SFI"5F,S .HG[ZzLGL CFHZLDF\ D[/JL VF5JFGF ZC[X[ VG[ VF ;[d5, ;L, SZL DFgI ,[AMZ[8ZL DFZOT YLSG[;4
0[g;L8L TYF AL8]DLG; Sg8[\8GF 5lZ1F6 SZFJL 5lZ6FD[ D[/JJFGF ZC[X[P ;\TMQFSFZS 5lZ6FDM VFjIF ;]WL 0FDZ SFDGL
R]SJJF5F+ ZSDGF 5@ ZSD JLYC[<0 ZFBJFDF\ VFJX[4 H[ ZSD ;\TMQFSFZS 5lZ6FDM D?IF AFN H K]8L SZFX[P 5Z\T]
;\TMQFSFZS 5lZ6FDM GlC\ D[/JJFGF lS:;FVMDF\ SZFZGL VgI XZTM VG];FZ SFI"JFCL Y. XSX[P
2) ~FP!__ ,FB S[ T[YL JW] ZSDGF SZFZ C[9/GF SFD 5Z .HFZNFZ[ O],8F.D SJM,LOF.0 V[gHLGLIZ lGI]ST SZJFGM
ZC[X[ H[ V\U[ SFDGF JS"VM0"Z D?I[ lNGv!5 DF\ SFI"5F,S .HG[ZzLGL HF6 C[9/4 GFIA SFI"5F,S .HG[ZzLG[ lGO]S
.HG[ZGF GFD4 SJM,LOLS[XG4 DFS"XL84 ;8L"OLS[84 S,Z OM8MU|FO4 lGI]lSTGF C]SD JU[Z[ lJUT ZH] SZJFGL ZC[X[ TYF
SFD 5Z CFHZ YIF V\U[GM ZL5M8" VF5JFGM ZC[X[4 H[ VG];FZ SZFZ C[9/GF SFD 5Z SJM,LOF.0 .HG[ZGL p5ZMST
XZT D]HA lGI]lST YFI TYF :Y/ 5Z BZ[BZ SFDULZL G ;\EF/[ tIF\ ;]WLGF ;DIUF/F T[DH SFD RF,] ZC[ T[ ;DI
NZdIFG lGI]S SZ[, .HG[Z SFDULZL ;\EF/X[ GlC\ T[ ;DIUF/F DF8[ ~FP!54___qv 5|lTDF; ,[B[ lA,DF\YL S5FT
SZJFDF\ VFJX4 H[ GMG ZLO\0[A, ZC[X[P
Signature of Contractor Executive Engineer
R&B Division, Bhuj
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
Additional Instructions.pdf
Asphalt Booklet.pdf
Bridge Booklet(1).pdf
Bridge Booklet(2).pdf
GR.pdf
PRE-QUALIFICATION.pdf
Road Work Booklet Part 1.pdf
Road Work Booklet Part 2.pdf
Specification Index.pdf
Specifications.pdf
Schedule of dismental items - Mundra port road.pdf
BOQ.pdf
SBD Book.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .