Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹81.0 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹92.9 L+₹11.9 L (14.7%)Rejected-AOC NO 12 HARIKRISHNAPURAM SAWYERPURAM TUTICORIN THOOTHUKUDI TAMIL NADU 628251 | TUTICORIN | TAMIL NADU | 628251 | L2 | Rejected-AOC L2 |
Tender Value
Refer Docs
Closing Date
26 Jul 2022, 11:00 amClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
DGM(SRM)
DGM(SRM) CSL, Cochin
main engine overhauling of Vishwa Diksha
2022_CSL_122209_1
SR6/RM718S3330/ GePNIC
Open Tender
Marine Services
Works
20 days
Cochin shipyard Ltd., Cochin
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
Exempted
12 Oct 2022
13 Jul 2022
27 Jul 2022
13 Jul 2022
26 Jul 2022
13 Jul 2022
13 Jul 2022 - 22 Jul 2022
Amount
MAIN ENGINE TYPE / CAPACITY / DETAILS : MAN B & W 6S50MC-C8 TIER II POWER= 9480 KW @ 127 RPM MAIN ENGINE UNIT DECARBONISATION TO BE CARRIED OUT AS PER FOLLOWING JOB SCOPE. ALL WORK TO BE CARRIED OUT STRICTLY AS PER THE MAKER’S MAINTENANCE INSTRUCTIONS TAKING ALL SAFETY PRECAUTIONS. ALL SPARES AND TOOLS (SHIP’S SUPPLY). YARD TO ARRANGE SURVEYORS AS & WHEN REQUIRED. ALL NECESSARY PARTS TO BE SHOWN TO SURVEYORS FOR THEIR APPROVAL.
ISOLATE ALL SIX UNITS DRAIN COOLING WATER FUEL OIL ETC. REMOVE ALL NECESSARY CYLINDER HEAD CONNECTIONS REMOVE CYLINDER HEADS WITH EXHAUST VALVES AND TRANSPORT SAME TO YARD WORKSHOP.
IN YARDS WORKSHOP, DISCONNECT AND REMOVE ALL CYLINDER HEAD MOUNTINGS AND OVERHAUL. DISMANTLE CYLINDER HEADS AND SEPARATE THEM FROM COOLING JACKETS. THROUGHLY CLEAN CYLINDER HEADS AND COOLING JACKET SURFACES. RENEW ALL “O”RINGS AND ASSEMBLE CYLINDER HEADS AND COOLING JACKETS. CYLINDER HEAD COOLING SURFACES TO BE PRESSURE TESTED TO 06 KGS / CM2 AND SHOWN TO 2EO & CEO. ALL CYLINDER HEAD MOUNTINGS POCKETS AND SEATS TO BE THOROUGHLY CLEANED AND SEATS TO BE LAPPED/MACHINED. FUEL VALVE NOZZLE AREA TO BE CHECKED FOR CORROSION ATTACK AND IF SAME EXCEEDS DEPTH OF 8 MMS THEN RECONDITIONING TO BE DONE AS PER MAKER’S INSTRUCTIONS. CYLINDER AIR STARTING V/VS RELIEF V/VS FUEL V/VS AND INDICATOR VALVES TO BE O’HAULED AND TESTED TO PROVE SATISFACTORY OPERATION AND SHOWN TO 2EO / CEO. CYLINDER HEAD RELIEF V/VS TO BE PRESSURE TESTED TO CORRECT OPENING PRESSURE & SHOWN TO 2E/O & CEO. INDICATOR V/VS LEAK TEST TO BE SHOWN TO 2EO / CEO. AFTER THE APPROVAL OF SURVEYORS & SUPTD ALL THE MOUNTINGS TO BE ASSEMBLED & FITTED BACK IN PLACE AS THE ORIGINAL.
DISMANTLE THE EXHAUST V/VS COMPLETELY AND OVERHAUL. THOROUGHLY CLEAN ALL PARTS & SHOW TO SURVEYORS &SUPTD. RENEW ALL WORN / DEFECTIVE PARTS AS REQUIRED & ALL SEAL RINGS FROM SHIP’S SPARES. CHECK THE VALVE & SEATS & IF REQUIRED GROUND THE VALVES & SEATS AS PER MAKER’S INSTRUCTIONS. THOROUGHLY CLEAN EXHAUST V/VS COOLING WATER SURFACES. ASSEMBLE THE EXHAUST VALVES AS THE ORIGINAL AND FIT THE EXHAUST VALVES IN PLACE ON CYLINDER HEADS. ALL CYLINDER HEAD ASSSEMBLIES TO BE TRANSPORTED BACK ONBOARD.
ALL LINER SURFACES & SCAVENGE PORTS TO BE THROUGHLY CLEANED. L.O.QUILL PASSAGES TO BE THROUGHLY BLOWN THROUGH WITH COMPRESSED AIR & CLEARED. LINERS TO BE CALIBRATED AND READINGS TO BE RECORDED. CARRY OUT DYE CHECK ON ALL CYLINDER LINERS IN WAY OF TOP AND BOTTOM L.O.GROOVES FOR DETECTING CRACKS IF ANY & SHOWN TO SURVEYORS & SUPDT. LINER PORT EDGES TO BE SMOOTHENED IF REQUIRED.
PISTON HOLDING NUTS TO BE OPENED. LINER TOP RIDGES TO CLEAN AND GRIND. PISTON TO BE WITHDRAWN ALONG WITH STUFFING BOXES AND SHIFTED/TRANSPORTED TO SHOP. PISTON RINGS & STUFFING BOX TO BE REMOVED. STUFFING BOX TO BE DISMANTLED, OVERHAULED, CLEANED INSPECTED AND ASSEMBLED WITH NEW SPARE SHIP SUPPLY. CHECK THE PISTON CROWN WEAR DOWN BY WEARDOWN GAUGE. PISTON RING GROOVES TO BE THOROUGHLY CLEANED. GROOVES & PISTON RINGS TO BE CALIBRATED & READINGS TO BE RECORDED. ALL PARTS TO BE PRESENTED TO SURVEYORS & SUPTD. AFTER THEIR APPROVAL ASSEMBLE ALL PISTONS AS PER MAKER’S INSTRUCTIONS. ALL PISTONS TO BE PRESSURE TESTED WITH OIL TO 10 BARS IN PRESENCE OF SURVEYORS & SUPTD/CEO. PISTON ROD TO BE GAUGED. PISTONS TO BE ASSEMBLED WITH NEW PISTON RINGS. PISTON ROD STUFFING BOX ALL PARTS TO BE THOROUGHLY CLEANED. STUFFING BOX CALIBRATIONS TO CHECK AND RECORD THE READINGS. ALL WORNOUT / DAMAGED PARTS TO BE RENEWED FROM SHIP’S SPARES. STUFFING BOXES TO BE ASSEMBLED ON PISTON RODS USING NEW SEAL RINGS SCRAPER RINGS & SPRINGS. PISTON RODS ALONG WITH STUFFING BOXES TO BE TRANSPORTED BACK ONBOARD. IF ANY PART IS WORN OUT BEYOND LIMIT, SAME TO BE REPLACED WITH NEW SPARES OR RECONDITIONED AS PER OEM PROCEDURE.
CROSS HEAD SURFACES TO BE CLEANED THOROUGHLY. LOWER THE PISTONS IN PLACE ALONG WITH THE STUFFING BOXES AND TIGHTEN THE NUTS AS PER MAKER’S INSTRUCTIONS.STUFFING BOX BOLTS TO BE TIGHTENED. ALL LASHINGS / LOCKINGS TO BE RESTORED. LOWER THE CYLINDER HEADS ALONG WITH EXHAUST V/VS AND TIGHTEN THE NUTS. ALL CYLINDER HEAD CONNECTIONS TO BE RESTORED BACK AS THE ORIGINAL. C.W. TO BE TRIED OUT AND ENSURE NO LEAKAGES. F.O. & L.O. TO BE TRIED OUT. F.O.LINES TO BE PRIMED. ALL LAGGINGS TO BE FIT BACK TO ITS ORIGINAL POSITION AND SECURE.
C / CASE TO BE THOROUGHLY CLEANED & INSPECTED. C/CASE DOORS TO BE BOXED BACK AS THE ORIGINAL.
SATISFACTORY MAIN ENGINE RUNNING TRIAL (BASIN TRIALS) 3 HRS TO BE GIVEN. MAIN ENGINE SEA TRIALS FOR ABOUT 4-6 HOURS ALSO TO BE GIVEN.
DISMANTLE PISTON ALL PARTS TO BE THOROUGHLY CLEANED AND EXAMINED. D.P.TESTS TO BE CARRIED OUT ON PISTON CROWNS AND PISTON SKIRTS AND CHECKED FOR FRETTING AND CRACKS AS PER MAKER’S INSTRUCTIONS. ALL PARTS TO BE PRESENTED TO SURVEYORS & SUPTD . AFTER THEIR APPROVAL ASSEMBLE ALL PISTONS AS PER MAKER’S INSTRUCTIONS. ALL PISTONS TO BE PRESSURE TESTED WITH OIL TO 10 BARS IN PRESENCE OF SURVEYORS & SUPTD.
SCAVENGE RELEIF DEVICES CRANKCASE DOORS AND RELIEF DEVICES TO OVERHAUL AND TO BE SHOWN TO THE CLASS SURVEYOR
HYDRAULIC ACTUATOR FOR EXH VALVES TO BE OVERHAULED. HOUSING AND PISTON TO BE LIFTED (PISTON TO BE RELEASED FROM BAYONET LOCK BY DISMANTLING LOCKING PLATE AND TURNING BY 90 DEG.). PARTS TO BE DISMANTLED INSPECTED AND SHOWN TO SURVEYOR.OIL CYLINDER LINER TO CALIBRATE.SAFETY V/VS AND NON RETURN V/VS TO BE OVERHAULED.AFTER SURVEY ACTUATOR TO BOXED BACK WITH NEW PISTON RING AND FITTED ON ITS PLACE WITH ALL CONNECTION.
CHAIN TENSIONING TO BE CHECKED & ADJUSTED FOR VIBRATION DAMPERS UNDER THE SUPERVISION OF SERVICE ENGINEER AND PUT UP FOR SHOWN TO SURVEYER. UP TO SURVEYOR SATISFACTION UNDER CSM SURVEY
GRINDING OF EXHAUST VALVE SEAT AND VALVE BY GRINDING MACHINE.
MACHINING OF LANDING FACES OF AIR STARTING V/VS EXHAUST V/VS FUEL V/VS ON CYLINDER HEADS
CYLINDER COVERS COMBUSTION SPACES TO CHECK FOR CRACKS WITH D.P. TEST – 06 NOS
RECONDITIONING OF EXHAUST VALVE SPINDLE EXHAUST VALVE SEAT AND CYLINDER HEAD AND NOS OF DAYS REQUIRE FOR THE SAME SHALL BE INDICATED SEPARATELY WHICH SHOULD BE MATCHED WITH THE PERIOD OF COMPLETION OF ENTIRE JOB (20 DAYS)
LINER WITHDRAWAL, OVERHAUL & REFITTING PER UNIT. IF LINER WEAR DOWN BEYOND LIMIT SAME TO BE REPLACED WITH NEW SHIP SUPPLY LINER.
RECONDITIONING OF MAIN ENGINE PISTON CROWN INCLUSIVE OF TRANSPORTATION
MAIN ENGINE FUEL INJECTION PUMPS TYPE / CAPACITY / DETAILS : MAN B & W 6S50MC-C8 TIER II POWER= 9480 KW @ 127 RPM FOLLOWING JOBS TO CARRY OUT UNDER THE SUPERVISION OF MAN B&W SERVICE ENGINEER. ISOLATE EMERGENCY STOP BUTTON AS LONG AS ANY WORK IS CARRIED ON FUEL PUMP BLOCKS.
ALL INLET AND OUTLET CONNECTIONS TO BE REMOVED AND FUEL P/P BLOCKS TO BE TAKEN OUT FROM PLACE TRANSPORTED TO YARD'S WORKSHOP. PUMPS TO BE COMPLETELY DISMANTLED FOR INSPECTION PARTS TO BE CLEANED , OVERHAULED AND MADE READY FOR SURVEY.ALL UNIT PLUNGER BARREL TO OVERHAULED AND SEALING RING TO BE RENEWED.SEALING RING IN BARREL TO BE RENEWED.
PUNCTURE VALVE AND SUCTION VALVE TO BE OVERHAULED
ALL FUEL INJECTION PUMPS TO BE PRESENTED TO CLASS SURVEYORS. AFTER COMPLETION OF SURVEY TO BOX BACK , FITTED IN PLACE AS ORIGINAL. INDIVIDUAL P/P TIMING TO CHECK & ADJUST AS NECESSARY & TO BE RECORDED.
SHOCK ABSORBER TO BE CHECKED AND OVERHAULED .
PRIMING, TRIAL TO BE GIVEN.WHEN PUMP IS PUT ON USE CHECK FOR ANY LEAKAGE AND ABNORMAL TEMPERATURE RISE. IF ANY DEFECT SAME TO BE RECTIFIED.
VIT GEAR TO BE CHECKED AND OVERHAUL AND ADJUSTED
FUEL CAM TO BE CHECKED AND LEAD TO BE MEASURED.
MAIN ENGINE MAIN BEARINGS &THRUST BEARING TYPE / CAPACITY / DETAILS : MAN B & W 6S50MC-C8 TIER II POWER= 9480 KW @ 127 RPM
CHECK AND RECORD ALL MAIN BRG AND THRUST BEARING CLEARANCES BEFORE AND AFTER INSPECTION.
MAIN ENGINE CRANK SHAFT DEFLECTION TO BE TAKEN BEFORE DISMANTLING AND AFTER ASSEMBLING.ALL READINGS TO BE SUBMITTED.
DISMANTLE BEARING AS PER MAKER INSTRUCTION ALL PARTS TO CLEAN AND SHOW IT TO SURVEYOR . BEARING AND JOURNAL TO BE CALIBRATED AND RECORDED . JOURNAL TO POLISH PRIOR BOXING UP DYE PNETRANT TEST TO BE CARRIED OUT FOR CHECKING ANY CRACK . AFTER SUCCESSFUL COMPLETION OF SURVEY BEARINGS TO BE BOXED BACK WITH OLD/NEW SHELL SATISFACTORY RUNNING TRIAL AND BRG TEMP TO BE MONITORED AND RECORDED DURING RUNNING TRIAL. QUOTE PER BEARING, NOS OF BEARING TO BE OPENED ON OWNER DECESION. IF ANY BEARING SHELL WORN OUT BEYOND LIMIT, NEW SHIP SUPPLY BEARING TO BE FITTED.
ALL AHEAD AND ASTERN THRUST BEARINGS , PADS TO BE OPENED UP AS PER MANUAL AND SAME TO BE PUT UP TO SURVEYER. AFTER SURVEYOR SATISFACTION UNDER CSM SURVEY, SAME TO BE BOXED BACK
E21015 ITEM : MAIN ENGINE CRANK PIN BEARINGS TYPE / CAPACITY / DETAILS : MAN B & W 6S50MC-C8 TIER II POWER= 9480 KW @ 127 RPM
CHECK AND RECORD ALL C/P BEARING CLEARANCES BEFORE AND AFTER INSPECTION.
DISMANTLE AND OVERHAUL CRANK PIN BEARING. LOWER THE BOTTOM HALVES IN THE CRANKCASE , LOCK X-HEAD ON TO GUIDES SUPPORT AND SWING OUT CONNECTING RODS FOR INSPECTING UPPER BRG HALVES. CLEAN ALL PARTS AND PRESENT TO CLASS SURVEYOR. DYE PENETRANT TEST TO BE CARRIED OUT. AFTER SUCCESSFUL COMPLETION OF SURVEY BRGS TO BE BOXED BACK AS ORIGINAL. SATISFACTORY RUNNING TRIAL TO BE GIVEN DURING SEA TRIAL. BEARING TEMPERATURE TO BE MONITORED. QUOTE TO BE INCLUSIVE OF ALL CHARGES.
IF BEARING SHELL WORN OUT BEYOND PERMISSIBLE LIMIT , SAME TO BE RENEWED .
E21016 ITEM : MAIN ENGINE CROSS HEAD BEARINGS TYPE / CAPACITY / DETAILS : MAN B & W 6S50MC-C8 TIER II POWER = 9480 KW @ 127 RPM
CHECK AND RECORD ALL SIX CROSSHEAD BRGS CLEARANCES BEFORE OPENING THE XHD BEARING AND AFTER ASSEMBLY OF XHD BRGS.
DISMANTLE CROSSHEAD BEARING AS PER MAKER'S INSTRUCTION. BOTH TOP AND BOTTOM BEARING TO BE TAKEN OUT. ALL PARTS TO BE CLEANED.BOTH TOP AND BOTTOM BRG SHELLS AND CROSSHEAD PINS TO BE EXAMINED. CROSSEHAD PIN TO CALIBRATE AND READINGS TO RECORD.DYE PENETRANT TEST TO BE CARRIED OUT TO IDENTIFY ANY CRACK IF ANY. CLEAN ALL PARTS AND PRESENT TO CLASS SURVEYOR AND AFTER SUCCESSFUL COMPLETION OF SURVEY BRGS TO BE BOXED BACK AS ORIGINAL. ALL UNITS X-HEAD BEAD BEARING CLEARANCES TO BE TAKEN AND PRESENTED TO SURVEYOR . IF ANY PART/ BEARING SHELL WORN OUT BEYOND LIMIT, NEW SHIP SUPPLY PART /BEARING TO BE FITTED. QUOTE TO BE INCLUSIVE OF ALL CHARGES.
TO MEASURE CLEARANCE BETWEEN ALL UNITS RECIPROCATING PARTS: 1. CENTERING OF THE LINER 2. CLEARANCE BETWEEN GUIDE STRIP AND XHD 3. CLEARANCE BETWEEN GUIDE SHOE AND XHD.
QUOTE FOR MAIN ENGINE CROSSHEAD PIN RENEWAL , PIN SHIP SUPPLY
MAIN ENGINE AIR COOLER TYPE / CAPACITY / DETAILS : MAN B & W 6S50MC-C8 TIER II POWER= 9480 KW @ 127 RPM
AIR COOLER ONE NO. TO BE REMOVED FROM PLACE AFTER REMOVING ALL CONNECTIONS & TRANSPORT TO YARD'S WORKSHOP. COOLER TO BE DISMANTLED AND ELEMENT TO BE CLEANED CHEMICALLY.(BOTH AIR AND WATER SIDE) COOLER END COVER ZINC ANODE TO RENEW AND COVERS TO BE PAINTED WITH HEAT RESISTANCE PAINT(YARD SUPPLY). ALL NOZZLE TO BE CLEANED.COOLER TO BE BOXED BACK AFTER CLEANING. PRESSURE TESTING TO BE DONE AT 5 KG/CM2 IN THE PRESENCE OF SURVEYOR AND SHIP SUP/CEO. AFTER COMPLETION OF SURVEY COOLER TO BE FITTED BACK IN PLACE WITH NEW GASKET (YARD SUPPLY) & TESTED.
PRESSURE DROP MANOMETER ASSEMBLY TO RENEW YARD SUPPLY. U-TUBE MANOMETER TO BE RENEWED IF BROKEN GLASS.
COOLER TO BE PRESSURE TESTED TO 5 BAR TO SHIP STAFF SATISFACTION. IF ANY TUBES ARE LEAKING, PLUGGING TO BE DONE. QUOTE FOR PLUGGING OF 10 NOS TUBE.
TWO NO.DRAIN COCKS TO RENEW YARD SUPPLY.
E21019 ITEM: MAIN ENGINE AUXILIARY BLOWERS TYPE / CAPACITY / DETAILS : MAN B & W 6S50 MC-C8 TIER II POWER= 9480 KW @ 127 RPM
2 NOS AUXILIARY BLOWERS TO BE REMOVED , DISMANTLED , OVERHAULED AND THOROUGHLY CLEANED. ALL PARTS TO BE SHOWN TO SURVEYORS FITED BACK AFTER SURVEY
STUFFING BOXES TO OVERHAUL. DEFECTIVE PARTS TO RENEW(YARD SUPPLY).
ROTORS & FANS TO BE CHECKED FOR DYNAMIC BALANCING IN PRESENCE OF SURVEYORS SUPDT & CEO.
ONLY AFTER SURVEYORS APPROVAL BLOWERS TO BOX BACK IN PLACE WITH NEW GASKETS (YARD SUPPLY) . SATIFACTORY TRIALS TO BE GIVEN TO CEO/SUPDT.
E21020 ITEM: PRE-TENSIONING STAY BOLTS; TIE BOLTS FOR M/E TYPE / CAPACITY / DETAILS : MAN B & W 6S50MC-C8 TIER II POWER= 9480 KW @ 127 RPM
28 NOS. TIE BOLTS TO BE CHECKED FOR PRETENSION. HYDRAULIC DISMANTLING PRESSURE 1500 BAR (TO CONFIRM).STAY BOLTS TO BE RETIGHTENED IN PAIRS WORKING FROM THE MIDDLE TOWARDS ONE END AND THEN AGAIN FROM THE MIDDLE TOWARDS THE OTHER END.HYDRAULIC PRESSURE TO BE MAINTAINED AT D1 AND STAY BOLT NUTS RETIGHTENED WITH A TOMMY BAR MAKING SURE NUTS BEARING AGAINST CONTACT FACE WITH A FEELER GUAGE. AFTER COMPLETING ALL BOLTS THE FIRST PAIR OF STAY BOLTS TO BE TIGHTENED TO 10% BELOW D1 AND NUT TO BE CHECKED FOR LOOSENESS. IF FOUND LOOSE ALL STAY BOLTS TO BE TIGHTENED ONCE AGAIN. IF NOT LOOSE THE FIRST PAIR TO BE TIGHTENED TO D1 .
E21021 RE-TIGHTENING OF HOLDING DOWN BOLTS & END CHOCKS FOR M/E TYPE / CAPACITY / DETAILS : MAN B & W 6S50MC-C8 TIER II POWER= 9480 KW @ 127 RPM
HOLDING DOWN BOLTS TIGHTNESS TO BE CHECKED (USING HYDRAULIC JACK MARKED WITH HOLDING DOWN BOLTS) BY RAISING THE HYDRAULIC PRESSURE SLOWLY WHILE CONSTANTLY ATTEMPTING TO LOOSEN THE NUT WITH THE TOMMY BAR. THE OIL PRESSURE INDICATED BY THE PRESSURE GAUGE WHEN THE NUT COMES TO LOOSE (LOOSENING PRESSURE) IS TO BE RECORDED IN THE CHECKING TABLE. THE BOLTS ARE TIGHTENED TO THE NORMAL TIGHTENINIG PRESSURE THEREAFTER. TIGHTENING PRESSURE – TO CONFIRM.
END CHOCK BOLTS TIGHTNESS TO BE CHECKED (USING HYDRAULIC JACK MARKED WITH EPOXY CHOCKS) BY RAISING THE HYDRAULIC PRESSURE SLOWLY WHILE CONSTANTLY ATTEMPTING TO LOOSEN THE NUT WITH THE TOMMY BAR. THE OIL PRESSURE INDICATED BY THE PRESSURE GAUGE WHEN THE NUT COMES TO LOOSE (LOOSENING PRESSURE) IS TO BE RECORDED IN THE CHECKING TABLE. THE BOLTS ARE TIGHTENED TO THE NORMAL TIGHTENINIG PRESSURE THEREAFTER.
IMMEDIATELY AFTER FINISHING OF CHECKING OF THE LOOSENING PRESSURES OF THE HOLDING DOWN BOLTS AND THE RETIGHTENING OF THE HEIGHT OF THE EPOXY SUPPORTING CHOCKS ARE TO BE CHECKED.WARNING: ACCIDENTAL APPLICATION OF LARGER JACK (MEANT FOR THE END CHOCK BOLTS) ON THE HOLDING DOWN BOLTS WOULD CAUSE SERIOUS OVER-STRESSING OF EPOXY SUPPORTING CHOCKS.
MAIN ENGINE CRANKCASE & SUMP TYPE / CAPACITY / DETAILS : MAN B & W 6S50MC-C8 TIER II POWER = 9480 KW @ 127 RPM
ENTIRE CRANK CASE WITH GEARS TO BE CLEANED THOROUGHLY TO REMOVE DIRTY OIL STAINS FROM THE WALLS OF CRANK CASE & SURFACES OF THE RUNNING GEARS.
INSPECTION OF CRANKCASE DRAIN TANK STRUCTURE TO BE CARRIED OUT; IF ANY CRACK FOUND IN THE STRUCTURE IN BETWEEN COFFERDAM AND DRAIN TANK; SAME TO BE WELDED / REPAIRED AFTER OBTAINING NECESSARY HOTWORK PERMIT.
OIL TO PUT BACK IN SUMP AFTER COMPLETION OF CLEANING AND INSPECTION.
MAIN ENGINE LO SUMP DIAPHRAGMS TO RENEW. DIAPHRAGM YARD SUPPLY.
E21024 ME STARTING AND REVERSING TYPE / CAPACITY / DETAILS : MAN B & W 6S50MC-C8 TIER II POWER= 9480 KW @ 127 RPM
MAIN ENGINE STARTING AND REVERSING SYSTEM TO BE CHECKED FOR PROPER FUNCTIONING. ALL IMPORTANT PNEUMATIC VALVE TO BE SERVICED . STARTING AND REVERSING HAS TO BE CHECKED FROM ALL STATION DURING BASIN AND SEA TRIAL.
TO OPEN UP AND OVERHAUL STARTING AIR DISTRIBUTOR.
AUTOMATIC STARTING AIR VALVE TO BE OVERHAULED.
E21025 ME CYLINDER LUBRICATORS TYPE / CAPACITY / DETAILS : MAN B & W 6S50MC-C8 TIER II POWER= 9480 KW @ 127 RPM
ALL 6 UNITS CYLINDER LUBRICATORS TO REMOVE FROM PLACE AND CLEANED THOROUGHLY WITH KEROSENE AND FLUSHED WITH LUB OIL. ALL LINE FILETRS TO CLEAN.
ALL CYLINDER PUMPS OPERATION TO CHECK AND REPAIR AS REQUIRED
TIMINGS OF CYLINDER ADMISSION TO BE CHECKED AS PER MAKER'S INSTTRUCTIONS
ADJUSTMENT OF CYLINDER LUBRICATOR TO BE CARRIED OUT AS REQUIRED.
CHECK GAS PRECHARGE PRESSURE,SAFETY DEVICES,FITTINGS,LINE CONNECTIONS AND ACCUMULATOR FIXATION OF DIAPHRAM ACCUMULATOR
VOYAGER MARINE SERVICES INDIA PRIVATE LIMITED
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .