Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
| 3 | Admitted-Finance | Admitted-Finance |
| 4 | Admitted-Finance | Admitted-Finance |
| 5 | Admitted-Finance LION TOWER PLOT NO 97 ELEGANT ESTATE BAIRAGARH CHICHLI KOLAR ROAD BHOPAL M P | BHOPAL | MADHYA PRADESH | Admitted-Finance |
Tender Value
Refer Docs
Closing Date
24 Jul 2023, 3:00 pmClosed
Regional Officer MoRTH Chandigarh
Regional Office MoRTH 6th Floor Room No 611 Kendriya Sadan Sector 9A Chandigarh 160009
CS FOR AE FOR SUPERVISION OF CONSTRUCTION OF 4 LANE PS PATTAN GREENFIELD BYPASS EXISTING CH.KM 24.320 TO KM 33.760 DESIGN CH. KM 24.400 TO KM 35.300 LENGTH 10.900 KM SBU(NH01) UT JK PROJECT BEACON BRO
2023_MoRTH_757515_1
RW/CH/W(28)/JK/2022
Open Tender
Consultancy
EPC Contract
730 days
JAMMU AND KASHMIR
AS PER TENDER DOCUMENTS
3 documents required · 3 mandatory
₹5,900
RPAO (NH)
Exempted
Regional Office MoRTH Chandigarh
15 Mar 2024
13 Jun 2023
25 Jul 2023
13 Jun 2023
24 Jul 2023
13 Jun 2023
13 Jun 2023 - 26 Jun 2023
26 Jun 2023
Amount
I. Remuneration for Local Professional Staff: For Project with Construction Period of 24 months + DLP Period of 60 months Professional Staff:
Team Leader cum Senior Highway Engineer
Resident cum Highway Engineer
Bridge Engineer/Structural Engineer
Senior Pavement Specialist
Senior Quality cum Material Expert
Road Safety Expert
SUB-TOTAL-1
SUB-PROFESSIONAL STAFF :
Survey Engineer
Assistant Highway Engineer
CAD Expert
Environmental Engineer
Assistant Bridge Engineer
Assistant Quality cum Material Engineer
Quantity Surveyor
SUB-TOTAL-2
Total(Sub Total 1 + Sub Total 2):
II. SUPPORT STAFF
Office Manager (24+60 = 84 months)
Accountant cum Cashier (24 months)
Steno cum Computer Operator (24+60 = 84 months)
Office Boy (1 no) (24+60 = 84 months)
Note : Billing rates as indicated above shall be increased in accordance of clause 6.2(a) Special Conditions of Contract for the personnel of all categories namely (i) key Personnel; (ii) sub-professional personnel and (iii) Support staff. The increase as above shall be payable only on the remuneration part of Key Personnel, Sub-Professional Personnel and support staff. However, for evaluation of Bid propsals, the quoted initial rate shall be multiplied by the total time input for each position on this contract, i.e. without considering the increase in the billing rates.
Total:
III. Transportation (Fixed rate on rental basis) *The vehicles provided by the Consultants shall include the cost for rental, drivers, operation, maintenance, repairs, insurance, etc. for all complete approx. 3000km/month run
Innova or equivalent not more than 2 years old) (1*24 (Construction Period) + 1*12 (DLP)) =36 Rate per month
Scorpio or equivalent 4 x 4 vehicles (not more than 2 years old) (1*24 (ConstructionPeriod)) Rate per month
Bolero or equivalent 4 x 4 vehicles (not more than 2 years old) (1*24 (Construction Period) + 1*60 (DLP)) =84 months Rate per month
Total:
IV. Duty Travel to Site(Fixed Costs) (For all Lengths of projects: Professional and Sub- Professional Staff Trips
To Head Quarter
To Regional Office, Chandigarh
TO BRO Office
Total:
V. Office Rent (Fixed Costs) - Minimum200 sq m area of office shall be rented. The rent cost includes maintenance, cleaning, repairing etc. complete (Rate per Month)
200 sqmt (During Construction period)
50 sqmt (During Maintenance /DLP period)
Total:
VI. OFFICE SUPPLIES, UTILITIES AND COMMUNICATIONS (Fixed Costs) (Monthly Rate) 24 months (Consturction) + 60 months (Maintenance)
Office Supplies
Drafting Supplies
Computer Running Costs
Domestic and International Communication
Total:
VII. OFFICE FURNITURE AND EQUIPMENT (Rental)
During Construction period (24 months)
During Maintenance /DLP period (60 months)
The cost shall include rental charges towards all such furniture and equipmentas required for proper functioning of office. Office furniture shall include executivetables, chairs, visitorchairs, steel almirahs, computer furniture, conference table etc. Office equipment shall include as a minimum of telephone(2external & 10internallines),photocopier(15ppm,12000copiesper month with A3 & A4 input) fax machine, PCs(5 No., Intel Core 2 Duo E8300, 19’’ colour TFT, Cache-6MB, RAM-2 GB, HDD- 250 GB, DVD Writer, Key board, optical scroll mouse, MS- Windows Vista Business, pre-loaded antivirus etc.), laser printers (2 no., 14 ppm, 266 MHZ, 5000 pages per month, 600x600 dpi or better etc., Engineering Plan printer (1 no.), binding machine (1 no.), plotter A0 size, overhead projector, AC (4 no., 1.5 Ton), Water Coolers (as required)etc.
Total:
VIII. REPORTS & DOCUMENTS PRINTING (Rate per Copy)
Monthly reports (Design and Construction) No. of Reports-24 x No. of Copies-3 (24*3)
Quarterly Reports (During Construction and Maintenance) No. of Reports-28 x No. of Copies-3 (28*3)
Various others reports as provided in the Concession Agreement such as Completion Report No. of Reports-4 x No. of Copies-3 (4*3)
Total:
Road Survey Equipment (Rate per Km / Nos) The cost shall include carrying out survey using equipment, manpower, software and report processing.
Surface defects detection and roughness measurement using Network Survey Vehicle
Pavement strength measurement using FWD
Bridge inspection using Mobile Bridge Inspection Unit
Road signs inspection using Retro Reflectometer
Total:
Contingencies:
A fixed amount of Indian Rupees ONE MILLION shall be included in the Financial Proposal. The provisions of Contingency shall be operated with the specific approval from Competent Authority in MoRT&H / Bro. (Fixed Amount of Rs. 10,00,000 shall be entered)
Total Cost Net of Goods and Service Tax: **Total cost net of Goods and Service Tax shall be considered for Financial Evaluation. Note: Payment will be made as per stipulations of the conditions of conntract.
Goods and service Tax
TOTAL COSTS (Including GST)
Technocrats Advisory Services Pvt. Ltd.
AYOLEEZA CONSULTANTS PVT. LTD.
GLOBAL INFRA SOLUTIONS
TECHNICAL CONSULTANCY SERVICES
Centro de Estudios de Materiales y Control de Obra, SA.
Bloom Companies LLC
MSV INTERNATIONAL INC
Lion Engineering Consultants Private Limited
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .