Loading…
Loading…
Tender Value
₹6.8 L
EMD Value
₹13,700
Closing Date
28 Sept 2026, 4:00 pm2d left
Executive Engineer I-FC Division Kargil
Executive Engineer I-FC Division Kargil
Remodeling of Pratii to Goshan irrigation canal by way of cement concrete channel at spots Foto Yab Lamar Drass
2026_PWD_19579_2
e-Tender 20 of 2026-27/INFC Kargil
Open Tender
Civil Works - Canal
Works
30 days
Kargil
Please refer Tender documents.
4 documents required · 4 mandatory
₹70
Payable To Executive Engineer I-FC Division Kargil
₹13,700
18 Sept 2026
18 Sept 2026
29 Sept 2026
18 Sept 2026
28 Sept 2026
19 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Earth work in excavation by manual means in trenches for foundation, drains, pipes, cables etc. (not exceeding 1,5 mtr in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, depth upto 1.5mtr including disposal of excavated earth upto 1.00 Mtr from cutting edge, disposed earth to be leveled and neatly dressed. | |||||
| 1.01 | All Kind of Soil 95% | 163.87 | Cum | 276.03 | ₹45,233.04 |
| 1.02 | Soft Rock 05% | 8.62 | Cum | 595.62 | ₹5,134.24 |
| 2 | Dumping stones in horizontal level including cost of stone | 22.5 | Cum | 509.54 | ₹11,464.65 |
| 3 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centering and shuttering, All work upto plinth level with: 1:4:8 (1 cement: 4 coarse sand: 8graded stone aggregate 20 mm nominal size (Nallah) | 15 | Cum | 4,518.47 | ₹67,777.05 |
| 4 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centering and shuttering, All work upto plinth level with: 1:3:6 (1 cement: 3 coarse sand: 6graded stone aggregate 20 mm nominal size (Nallah) | 51 | Cum | 5,243.49 | ₹2,67,417.99 |
| 5 | Cement concrete flooring 1:2:4 (1cement:2 course sand:4 graded stone agregade) finished with a floatin coat of neat cement including cement slurry ,but excluding soct of nosing of steps etc. complete 50mm thick with 20mm nominal size stone agregate Crushed | 90 | Sqm | 344.92 | ₹31,042.8 |
| 6 | Centering and shuttering including strutting, propping etc and removal of form work for; Retaining walls, return walls, walls (any thickness) | 420 | Sqm | 393.53 | ₹1,65,282.6 |
| 7Carriage of materials from sources to actual site of work including loading, unloading and stacking etc complete. | |||||
| 7.01 | (i) sand / stone aggregate of an avg lead of 10 KM by MT and 700Mtr by Headload | 98.25 | Cum | 853.54 | ₹83,860.31 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.50 MB
BOQ_46323.xls
BOQ • 0.52 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .