Loading…
Loading…
| Sl No | Description | Qty | Unit | SYAMKUMAR L1 | mv co L2 |
|---|---|---|---|---|---|
| 1.00retaining wall | |||||
| 1.00 | 2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil | 99.6 | cum | 359 ₹35,756.4 Lowest | 360 ₹35,856 |
| 1.00 | OD2150/2025-2026:
DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry with good quality blasted rubble including packing to compactness to lines and levels cost and conveyance of all materials labour charges etc. complete as per direction of Departmental officers at site | 418.32 | cum | 3,993 ₹16,70,351.76 Lowest | 4,000 ₹16,73,280 |
| 1.00 | 5.9.1:Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete | 66.64 | sqm | 386 ₹25,723.04 Lowest | 390 ₹25,989.6 |
| 1.00 | 5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more | 964.46 | kilogram | 112 ₹1,08,019.52 Lowest | 115 ₹1,10,912.9 |
| 1.00 | 5.1.3:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:2:4 ( 1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | 19.92 | cum | 9,963 ₹1,98,462.96 Lowest | 9,975 ₹1,98,702 |
| 1.01 | OD2153/2025-2026:Coconut Pile - Supplying and stacking well matured half split and straight coconut post for driving down through various strata bellow bed level including cost coveyance labour charges etc complete. | 501 | metre | 271 ₹1,35,771 Lowest | 275 ₹1,37,775 |
| 1.01 | OD2157/2025-2026:Coconut Pile - Driving down coconut pile (half split) to lines and levels through variuos strata including all hire charges and labour for fixing , staging platform and all other appliances necessary for pile driving down after pointing the bottom end | 501 | metre | 649 ₹3,25,149 Lowest | 650 ₹3,25,650 |
| 1.01 | OD2158/2025-2026:Cutting and removing the excess length of wooden piles (half split) to lines and levels and removing the cut end of piles and stacking within 150m | 167 | each | 228 ₹38,076 Lowest | 230 ₹38,410 |
Tender Value
₹25.4 L
EMD Value
₹50,000
Closing Date
31 Dec 2025, 12:00 pmClosed
Executive Engineer Engineering Division Kerala Agr
Executive Engineer Engineering Division KAU Kumarakom
Reinforcement of outer retaining wall of research cum seed production paddy fields at MSSRRS, Moncompu
2025_KAU_823426_2
2/2025-26
Open Tender
Civil Works - Others
Item Rate
180 days
Executive Engineer
Please refer Tender documents.
7 documents required · 7 mandatory
₹5,900
Yes
₹50,000
Yes
21 Jan 2026
23 Dec 2025
1 Jan 2026
23 Dec 2025
31 Dec 2025
23 Dec 2025
retaining wall
2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil
OD2150/2025-2026: DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry with good quality blasted rubble including packing to compactness to lines and levels cost and conveyance of all materials labour charges etc. complete as per direction of Departmental officers at site
5.9.1:Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete
5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more
5.1.3:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:2:4 ( 1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size derived from natural sources)
OD2153/2025-2026:Coconut Pile - Supplying and stacking well matured half split and straight coconut post for driving down through various strata bellow bed level including cost coveyance labour charges etc complete.
OD2157/2025-2026:Coconut Pile - Driving down coconut pile (half split) to lines and levels through variuos strata including all hire charges and labour for fixing , staging platform and all other appliances necessary for pile driving down after pointing the bottom end
OD2158/2025-2026:Cutting and removing the excess length of wooden piles (half split) to lines and levels and removing the cut end of piles and stacking within 150m
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1380156.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.56 MB
Payment.pdf
Tender Documents • 0.01 MB
NITF.pdf
Tender Documents • 0.56 MB
Priliminary_agreement.pdf
Tender Documents • 0.10 MB
SBD.pdf
Tender Documents • 0.54 MB
BOQ_1380156.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .