Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹3.2 CrAccepted-AOC | ₹3.2 Cr | 1 | Accepted-AOC accept |
| 2 | 2₹3.3 Cr+₹3.4 L (1.04%)Rejected-AOC VILLAGE KAIRWAN KARANPUR PO RAJPUR DEHRADUN | DEHRADUN | DEHRADUN | UTTARAKHAND | ₹3.3 Cr+₹3.4 L (1.04%) | 2 | Rejected-AOC reject |
Tender Value
Refer Docs
EMD Value
₹6.5 L
Closing Date
10 Nov 2022, 5:00 pmClosed
Executive Engineer
Office of the Executive Engineer, Maintenance Division, Uttrakhand Jal Sansthan Lane No.-1, Tarun Vihar, Mothorowala road, Dehradun
Sudhowala Water Supply Scheme of District Dehradun Construction of OHT, Including Supply, Installation, testing, commissioning of Tubewell, Rising Main, Distribution System, Pumping Plant and related works etc complete under Jal Jeevan Missio
2022_UKJS_50836_9
3169/E-NIVIDA SUCHAN/2022-23 DT 15.10.2022
Open Tender
Civil Works - Water Works
Turn-key
365 days
DEHRADUN
Please refer Tender documents.
3 documents required · 3 mandatory
₹4,720
Executive Engineer Maint Div UJS Dehradun
₹6.5 L
DEHRADUN
15 Jul 2023
21 Oct 2022
11 Nov 2022
22 Oct 2022
10 Nov 2022
31 Oct 2022
28 Oct 2022
Construction of Sudhowala Water Supply Scheme I/C 300 mm Dia T/W , Over Head Tank & Installation , Testing & Commisioning of Rising Main & Distribution System etc Complete under Jal Jeevan Mission Programme.
Tube Well (Source) & Related Components (For 2 No of Tubewells Detail mention as below.)-Transportation of Rig Machine, Air compressor O.P. unit camp equipgages, connected T&P & necessary material erequired for drilling up to site of work, including loading, unloading etc. complete.
Erection and leveling of Rig machine and barricading at sire of work
Dismantling of Rig Machine & clearance of site after satisfactory completion of work
Drilling of Borehole from GL to 120 mtr. BGL
Preparing and lowering of Tubewell assembly starting from G.L. to the required depth including cutting, welding as required at site complete with all T&P required. Supply & lowering of 300mm dia MS ERW fincut 7.9mm thick plain pipe
Supply & lowering of 300mm dia MS ERW fincut 7.9mm thick slotted pipe
Supply & fixing of 300mm dia, 8mm thick tubewell cap.
Supply & fixing of 300mm dia M.S.D. housing clamp and Grider set.
Supply & fixing of 300 mm dia Bail plug.
Supply and Shrouding of Pea gravel in between bore & tubewell assembly to the entire depth of Tubewell
Development of tubewell by 350 PSI/1100 CFM Air compressor
Development of tubewell by the suitable capacity O.P. unit including supply & installation of pumping plant.
Geohydrological survey of site
Chemical & bacteriological testing of water sample
Pump and Related Electrical Items-Supply of Energy Efficient Submersible Pumpsets of various duty parameters, Make KSB Pump 500LPM dischage at 90 m head lectric motor (TW-1 to OHT-1)
Pump 500LPM dischage at 100m head with 25 HP electric motor (TW-1 to OHT-1)
Supply and installation of Dry Auto transformer start ATS type starter cum panel for submersible motors incluing capacitor . For operation on 400 volts+/- 10% three phase 50 c/s AC supply complete with Cu bus bar, internal interconnection and comprising of AUTO TRANSFORMER STARTER, Electronic over load, Single phasing, reverse phasing protection relays and under and under voltage protection,with Metering & Protection calss CT, Time Delayed Capacitor duty contactor operated LT power capacitor, single phase preventor, indicating lamp, door switch with complete internal connection by copper wire & should be suitable toi integrate Multi function power meter for following duties of Pump motors. (16-40 HP)
Industrial Grade electrification of Pump House and Pump House Camps with Copper wiring in UPVC conduit.TW 1&2
IOT Based Monitoring System including all Pressure Sensor, Mechanical flow Meter Sensor,Chlorine Sensor with all including accessories. Zone- 1,2 & 3
Providing & Fixing Woltex Woltman type Bulk water meter (upto 50 degree celcius tempreture) removable mechanism type, magnetically coupled having dry dial, hermetically sealed tantalizer including C.I.Strainer etc complete. Zone- 1&2
Supply, testing, tagging, terminating and jointing of 3 core flat cable with bare bunched copper conductor insulated with PVC and sheathed with PVC for submersible pump motors with Voltage grade upto 1100 V generally confirming to IS 694-2010 with latest amendments of the following size. 35 Sqm 3 Core
SITC of Main Incomer panel comprising of TPN MCCB of rating suitable of following rating with Three phase volt meter, Amp. Meter, CT, Mains indicating lamps etc. 250 AMP
Auto Phase correction unit for following ratings 110 AMP
Supply, testing, tagging, terminating and jointing of XLPE insulated PVC sheathed cable of 1.1 KV grade with Aluminium conductors armoured as per IS 7098-I including terminations at both ends, testing, commissioning at site as per spcifications, complete in all respects 70 sqm
Earthing of complete electrical equipment (GI Earth strip, GI earth plate etc. including digging of pit & Complete earthing in all respect as per IE rule, IS: 3043, including supplying and laying 25x5mm GI Strip 0.5 meter below ground with standard accessories.
415 V, A' class, non-skid, high voltage insulation synthetic mat mate from electrometric polymer material, 1000mm wide, 2.0 mm thick, Dielectric strength 3300V for 1 minute, fire retardant, no adverse effect of transformer oil , diesel, acis, alkali, High Tensile and Elongation properties, good mechanical strength to withstand load and movement of breaker trolley, as per IS 15652 with latest amendments.
Shock treatment chart, duly laminated in Hindi (Local)- 1NO. And English language- 1N0.
First Aid Box with all essential medicines including wall mounted bracket
415 V, Aluminium, anodised Danger caution plate in Hindi (local) and English languages with the sign of skull and bones in signal red colour on front side, as per IS 2551 with latest amendments.
CO2 type, portable Fire extinguishers, of size 5 Kg each, manufactured from CRCA sheets in all welded construction, body coated with glossy corrosion resistant epoxy powder coating, with inbuilt water proof pressure guage, with wall bracket, as per IS 2190 and IS 13849 with latest amendments.
Supply of jointing materials such as lugs, Tapes etc.
Supply of main Piping and Valves compriging of following: (i) M.S.D.F. Bend 90 Degree -02 Nos. (ii) 150 mm dia CI D/F Sluice Valve P.N.1.0 -02 nos. (iii) 150 mm dia CI D/F Reflex Valve -01 no. (iv) M.S.D/F Distance Piece 2.00 m length -01 no. (v) M.S. D/F Tee -01 no. (vi) M.S. Distance Piece 3.00 m long -02 nos. (vii) Ventury -01 no. (viii) M.S. DI Clamp Heavy Duty -01 Set (ix) M.S. T/W Cap 150mmx300 mm -01 no. (x) Nut-bolts,Rubber/Fiber Packing for Joining above Pipes & Specials -01 Set
Supply of 100 mm dial Pressure Gauge with control cock & fitting of range 0-10 Kg/Sqcm -01 no.
Supply of following Tools required for maintenance of Pumping plants. (i) DE Spanner Set -01 Set (ii) Ring Spanner Set -01 Set (iii) Screw Drivers -02 nos. (iv) Pliers -01 no. (v) Hammer -01 no. (vi) Pipe Wrench 14 inch -01 no. (vii)Screw Wrench -01 no. (viii) Tong Tester -01 no. (ix) Chain Wrench 100 mm -02 nos.
Installation & Commisioning of Pumping Plants with accessories in side the Pump House but without Civil Works Such as laying of foundation,Cable Trench etc.
Testing of Pumping Plants at Site
Painting of entire installation with 02 coats of anti corrosion bituminous black paint over 1 primer coat Super Enamal Paint as per direction of Engineer Incharge
Civil Work : Supply of all Materials, Labours, T&P etc. and construct a New Pump House with size (3.60 m x 3.0 m) as per design and drawings, including cost of all Labour & Fittings all complete.
Provide all Materials, Labour, T & P etc and Construct Boundary Wall 2.00 m Height & Iron Grill Over it, All Round the Tube Well & O.H.T Campus to prevent the approach of unauthorised souls.
Provide all Materials, Labour, T & P etc and construct 3.60 m Wide Entrance Gate with Gate Pillars for controlling approach to the area.
Excavation in Pipe Line Trenches Excavation in ordinary soil (loam, clay, sand) for foundation including lift up to 1.5M and lead up to 30M filling waterring and ramming of Excavated the earth in to the trenches or into the sides between foundation trenches or in to the plinth (75% of Total Quantity)
Excavation in soil mixed with shingle bouldres etc. requireing the use of specials T&P, if any, for pipe line trenches including lift up to 1.5M and lead up to 30M with back filling,waterring and ramming of Excavated earth in the trenches.(25% of Total Quantity)
D.I. pipe conforiming to IS:8329/2000 Proving of all materials, carting from site store to site of work, lowering into trenches with true to alignment, Laying & Jointing of full length S&S Centrifugally Cast (Spun) Ductile Iron Pipes by overlap fusion joint including supply of 'EPDM' rubber gaskets conforming to IS:5382-1985 with testing of pipe line complete . DI pipe S&S K-9- 100 mm dia DI K-9 Pipe
Providing and laying D.I. specials of class K-12 suitable for push-on jointing as per IS: 9523-2000 (5% of DI Pipe weight)
Supplying of DI Valves Including Carting the same upto the site of work as per engineering norms (with cap) complete with bolts, nuts, rubber insertions etc. anywhere in uttarakhand. D.I. Sluice/ Gate Valve Pressure PN 1.0- 100 mm dia
Installation, testing and commissioning of DI Valves as per engineering norms anywhere in uttarakhand.D.I. Sluice/ Gate Valve 100 mm dia 1 & 2
Supplying of Non Return Valves Including Carting the same upto the site of workas per engineering norms anywhere in uttarakhand. D.I. Non Return Valve Pressure PN 1.0 100 mm dia 1&2
Installation, testing and commissioning of Non Return Valves as per engineering norms anywhere in uttarakhand. D.I. Non Return Valve Pressure PN 1.0 100 mm dia
Supplying of Air Valves as per engineering norms of approved quality with bolts, nuts, rubber insertions etc. complete anywhere in uttarakhand DI Air Pressure PN 1.0 100 mm dia
Installation, testing and commissioning of Air Valves as per engineering norms anywhere in uttarakhand. DI Air Pressure PN 1.0 100 mm dia
Constructing masonry Chamber 1.5x2x1.5 cm inside, in brick work in cement mortar 1:4 (1 cement : 4 coarse sand) for sluice valve, with C.I. surface box 100 mm top diameter, 160 mm bottom diameter and 180 mm deep (inside) with chained lid and RCC top slab 1:2:4 mix (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size ), i/c necessary excavation, foundation concrete 1:5:10 (1 cement : 5 fine sand : 10 graded stone aggregate 40 mm nominal size ) and inside plastering with cement mortar 1:3 (1 cement : 3 coarse sand) 12 mm thick, finished with a floating coat of neat cement complete as per standard design : With common burnt clay F.P.S.(non modular) bricks of class designation 7.5. For different types of valves.
Supply,Installation,Testing and Commissioning of Full Bore Electromagnetic Flow Meter for Lines of followoing Sizes Comprising of Flow Tube Sensor with Transmitter cum Display unit and facility to provide data communication signal over Modbus 485 Port Pulse output and 4-20mA Signal output with Flanges, Clamps etc at Source 100 mm dia
Supply of all materials labour, T&P etc and construction of RCC O.H.T. of following capacities (in Kilolitres) and 12m staging with 1.00m wide R.C.C. stair case from G.L. to balcony and from balcony to top dome 1M x 1M R.C.C., landing at suitable locations and railed with 3 rows of 20mm dia G.I. (M) pipe on 65x65x5mm angle iron posts fixed with ladder, from top to the floor inside of tank, M.S. M.H. cover with locking arrangement, lightining conductor as per electricity rules, water level indicator, supply and fixing of outlet, inlet, over flow and wash out pipes with necessary sluice valves, pipe pieces (including cost of materials) flooring 0.60m wide apron, painting on tank body vertical pipes, ladder, M.s. M.h. cover, ventillator column etc, complete with approved water proofing (apex)/ enamel paint, testing, filling water for testing purpose etc, including supply of vertical pipes and specials, assuming bearing capacity as 10MT/M² staging 12.00 metre Including Additional rates for staging per meter height beyond 1 m height including cost of all metrials, labour, shuttering, scaffolding T&P complete. (i) 150KL OHT Staging 22M
(ii) 150KL OHT Staging 22M
For Small CWRs in Rural Areas Supply of all materials, labour, T&P etc and construction of R.C.C. CWR of following capacities ( in kiloliters ) with M.S. ladder outside & inside of the tank, M.S. M.H. cover with locking arrangement, supply and fixiing of outlet, inlet, over flow and wash out pipes with necessary sluice valves, pipe pieces (including cost of materials) flooring 0.60 M wide apron, painting on tank body vertical pipes, ladder, M.S. M.H. cover etc. complete with approved water proofing (apex) / enamal paint, testing, filling water for testing purpose etc. including supply of vertical pipes and specials, assuming bearing capacity as 8MT/M2. The Cost of CWRs of corresponding capacities has been given in Rupees. CWR 20 KL
Dismantling steel work in built up sections in angles, tees, flats and channels including all gusset plates, bolts, nuts, cutting rivets, welding etc. including dismembering and stacking within 50 metres lead. kg 4.15 Demolish of 50KL Steel CWR
Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) upto plinth level with : Cement mortar 1:6 (1 cement : 6 coarse sand)
Distribution of Network & Related Components: Dismantling of flexible pavements and disposal ofdismantled materialsupto alead of 100 m, stacking serviceable and unserviceable materials separately as per Technical Specification Clause 202 (Considering 50%)
Dismantling of cement concrete pavements by mechanical means using pneumatic tools breaking to pieces not exceeding 0.02 Cum in volume and stock piling at designated locations and disposal of dismantled materials upto a lead of 1000 m, stacking serviceable and unserviceable materials separately (Considering 50%)
Construction of Un-reinforced, Cement concrete pavement, thickness as per design, over a prepeared sub base with 43 grade cement or any other type PCC Grade M-30, coarse and fine aggregates conforming to IS: 383,maximum size ofcoarse aggregate notexceeding 25 mm,mixed in a concrete mixer of not less then 0.2 cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side formwork (Steel channel, laying and fixing of wedges, steel plates including levelling the formwork and laying and fixing of 125 micron thick polythene film, as per drawing), spreading the concrete with shovels, rakes, compacted using needle, and plate vibrators, finished in continuous operation and curing of concrete slabs for 14 days, using curing compound where specified and water finishing to lines and grade as per drawings and technical specifications.
Excavation in Pipe Line Trenches Excavation in ordinary soil (loam, clay, sand) for foundation including lift up to 1.5M and lead up to 30M filling waterring and ramming of Excavated the earth in to the trenches or into the sides between foundation trenches or in to the plinth (75% of Total Quantity)
Excavation in soil mixed with shingle bouldres etc. requireing the use of specials T&P, if any, for pipe line trenches including lift up to 1.5M and lead up to 30M with back filling,waterring and ramming of Excavated earth in the trenches.(25% of Total Quantity)
Disposal of building rubbish / malba / similar unserviceable, dismantled or waste materials by mechanical means, including loading, transporting, unloading to approved municipal dumping ground or as approved by Engineer-in-charge, beyond 50 m initial lead
Providing of all materials, Carting from site store to site of work, Laying & Jointing of G.I screwed pipes (including supply of all jointing materials like specials, white lead, hemp and oil etc) in trenches with its cutting, threading and testing of pipe line etc complete.G.I. PIPE CONFORMING TO IS : 1239(PART-1) Medium Duty (Class 'B') (i) 15 mm dia G.I Pipe
(ii) 20 mm dia G.I Pipe
(iii) 25 mm dia G.I Pipe
(iv) 32 mm dia G.I Pipe
(v) 40 mm dia G.I Pipe
HDPE pipe for water supply conforiming to IS:4984-1995 : Proving of all materials, carting from site store to site of work, lowering into trenches with true to alignment, Laying & Jointing of full lengths of HDPE pipes, completion of work with testing of pipe line including supply of Jointing materials & specials. (i) 63 mm dia pipe
(ii)75 mm dia pipe
(iii) 90 mm dia pipe
(iv) 110 mm dia pipe
(v) 140 mm dia pipe
(vi) 160 mm dia pipe
Supplying of DI Valves Including Carting the same upto the site of work as per engineering norms (with cap) complete with bolts, nuts, rubber insertions etc. anywhere in uttarakhand.D.I. Sluice/ Gate Valve Pressure Pressure PN 1.0 (i) 50 mm dia
(ii) 65 mm dia
(iii) 80 mm dia
(iv) 100 mm dia
(v) 125 mm dia
(vi) 150 mm dia
(vii) 200 mm dia
Installation, testing and commissioning of DI Valves as per engineering norms anywhere in uttarakhand.D.I. Sluice/ Gate Valve (i) 50 mm dia
(ii) 65 mm dia
(iii) 80 mm dia
(iv) 100 mm dia
(v) 125 mm dia
(vi) 150 mm dia
Supplying of Sluice Valves (Scouring purpose) Including Carting the same upto the site of work as per engineering norms (with cap) complete with bolts nuts, rubber insertions etc. anywhere in uttarakhand. D.I. Sluice Valve (Scouring purpose) (PN-1.00) (i) 65 mm dia
(ii) 80 mm dia
Providing & Fixing Woltex Woltman type Bulk water meter (upto 50 degree celcius tempreture) removable mechanism type, magnetically coupled having dry dial, hermetically sealed tantalizer including C.I.Strainer etc complete.nd. D.I. Sluice Valve (Scouring Pupose) (PN-1.0) (i) 65 mm dia
(ii)80 mm dia
Supplying of Air Valves as per engineering norms of approved quality with bolts, nuts, rubber insertions etc. complete anywhere in uttarakhand. D.I. Air Valve along with Isolating Valve 80 mm dia
Installation, testing and commissioning of Air Valves as per engineering norms anywhere in uttarakhand. D.I. Air Valve along with Isolating Valve 80 mm dia
Supplying and Fixing of Fire Hydrant Valve IS 5290 (Flanged) Including carting the same upto site of work and fixing the same and water supply line Including the cost of valves,specials,labour and T&P Complete in all respect 80 mm dia
Supply,Installation,Testing and Commissioning of Full Bore Electromagnetic Flow Meter for Lines of followoing Sizes Comprising of Flow Tube Sensor with Transmitter cum Display unit and facility to provide data communication signal over Modbus 485 Port Pulse output and 4-20mA Signal output with Flanges, Clamps etc. at outlet of OHT (i) 200 mm Zone-1
(ii) 200 mm Zone-2
(iii) 100 mm Zone-3
Interconnection of new pipe line to existing pipe line including necessary cutting, supply and Installation of required specials fittings all as per direction of Engineer-In- Charge.for Dia 100-125 mm
Supply of all labour, material required for restoring of existing house connection which might be damage during excavation and also shifting all existing connection to new water supply system from existing water supply system complete as per unit estimate and directed by Engineer in-charge. 15 mm size water connections.(Considering 20% of 2020 Households)
Providing and making New house service connections from water supply distribution GI pipe line upto water meter chamber inside the property using GI pipe including supply and fixing of electrofussion saddle ,brass ferrules elbow, ball valve etc complete with earthwork, road cutting with restoration works
Providing and erecting 2.00 metre high temporary barricading at site; each panel of size 2.50mx2.00m made of 40x40x6mm angle iron or 50x50x3mm hollow MS tube osts/horizontal members/ bracings covered with 1.63mm thick MS sheet. The sheet shall be fixed with 30x5mm MS flat by suitable welding/riveting. The panels shall be made so that gap of 50cm above the ground is available making overall height as 2.5m.
Pipe Testing: Testing of Pipes (G.I ,HDPE & D.I) which includes a)Parameters(Physical & Chemical) b)Tensile Sterngth Properties
Operation & Maintenance Cost for Trail and Testing of Pipes (i) Zone1
Operation & Maintenance Cost for Trail and Testing of Pipes (i) Zone-2
Operation & Maintenance Cost for Trail and Testing of Pipes (i) Zone-3
SAKLA NAND LAKHERA
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .