Loading…
Loading…
112 results • Latest
Laying of Rising Main and Distribution system at ward no 90 Mohabbewala Under Pithuwala Division
Restoration of Damaged Water Supply Scheme of Shikhar Fall, Massi Fall and Different Places of Rajpur Zone Due to Natural Calamity on Dated 16-09-2025 Under North Division, Dehradun
Restoration of Damaged Water Supply Scheme of Purkul Gaon Due to Natural Calamity on Dated 16-09-2025 in Rajpur zone Under North Division, Dehradun.
Restoration of gravity main Pipeline of Raipur Chhamrauli, Water Supply Scheme, Mussoorie Urban under Natural Calamity (Deviya Apda Year 2025-26) in Distt- Dehradun
MAYAPUR RBF (PUMPING PLANT) WATER SUPPLY SCHEME in Distt Chamoli, Uttarakhand
Lohaghat Urban Pumping Water Supply Scheme
Restoration of gravity main Pipeline of Bhagwanpur Maldung Part-5, Bhauwala Swajal Part-5, Bhitarli, Gujrara Karanapur Harnaul, Rikholi, Vidholi water supply scheme under Natural Calamity (Deviya Apda Year 2025-26) in Block Sahaspur, Distt- Dehradun
SUPPLY OF Truck Mounted S/S Water Tanker of 3.5 KL Capacity Under Uttarakhand Disaster Preparedness and Resilience Project
Pokhari Urban Water Supply Scheme
Survey Supply Installation Testing and Commissioning Of Grid Connected Solar PV Power Plant Including All Associated Electrical Civil and Mechanical Works on Ground or Suitable Location at Ayudh Vihar, Indraprasth Lane No 3 SGRR Nehrugram nathanpur
Survey Supply Installation Testing and Commissioning SITC Of Grid Connected Solar PV Power Plant Including All Associated Electrical, Civil and Mechanical Works on Ground or Suitable Location at Gujronwali Office Campus Under Nathuwawala water scheme
Permanent Restoration Work of Damaged 150 mm dia MSERW pipe line under BAGESHWAR URBAN (Kathayatbara G.O.V.-Jakhera) Water Supply Scheme Due to Natural Calamity on Dated 05.08.2025 in Uttarakhand Jal Sansthan, Division Bageshwar
Permanent Restoration Work of Damaged Restoration work damaged pipe line and protection work under Kapkot (Anarsa, Manigair, Baisani, Pausari and Sumati) W/S Scheme
LAYING OF RISING MAINS FROM RISHI NAGAR NEW TUBE WELLTO S.G.R.R. BHARMAWALA KHALA OVER HEAD TANK ADHOIWALA ZONE UNDER NORTH DIVISION.
Construction of Pre Sedimentation Unit of 22.5 MLD Capacity and Modernization Work of Water Treatment Plant, Matela, Almora Urban Pumping Water Supply Scheme
Repair of Nandanagar Drinking water supply (Damage due to Natural Calamity on dated 18.09.2025 (Deviya Apda Year 2025-26) in Block Nandanagar, Distt- Chamoli
Restoration of damaged Water Supply Scheme of Dom Gaon and Khala Gaon Due to Natural Calamity On Dated 16-09-2025 in Rajpur Zone Under North Division, Distt- Dehradun
Strengthening of Damage Pipe Lines of Makdait Gravity Source due to Natural calamity on 16/09/2025 at I.T. Park zone under North Division (Dehradun) Urban Water Supply Scheme
Strengthening of Damage Pipe Lines of KALDIGHATT Gravity Source due to Natural calamity on 16/09/2025 at I.T. Park zone under North Division (Dehradun) Urban Water Supply Scheme
Strengthening of Damage Pipe Lines of JUADKHALA Gravity Source due to Natural calamity on 16/09/2025 at I.T. Park zone under North Division Dehradun Urban Water Supply Scheme
SUPPLY OF Sewer Jetting Cum Suction Machine Under Uttarakhand Disaster Preparedness and Resilience Project
SUPPLY OF 100-200 KVA 415 Volts Silent DG set Under Uttarakhand Disaster Preparedness and Resilience Project
Restoration of gravity main Pipeline of Badowala Maldung (Part- 5) water supply scheme under Natural Calamity (Deviya Apda Year 2025-26) in Block Sahaspur , Distt- Dehradun
SUPPLY OF Truck Mounted Mini Tank and Utility Truck Under Uttarakhand Disaster Preparedness and Resilience Project
DESIGN AND CONSTRUCTION OF OHT, RISING MAIN AND RESTRENGTHENING OF DISTRIBUTION SYSTEM OF KAMLA PALACE AND GMS ROAD AREA Pithuwala Division, Dehradun
Replacement Of Damaged Distribution Pipeline In Shivlok and Aarya Nagar Haridwar Urban Water Supply Scheme Under Cm Ghoshna 746 Year 2025
operation and maintenance of Ukhimath Unit Distt Rudraprayag
operation and maintenance of Augustmuni Unit Distt Rudraprayag
Repair of Munsyari Water Supply Scheme (Hokara, Rumidor and Didihat). (Deviya Apda Year 2025-26) in Block Munsyari, under Didihat Division. Distt- Pithoragarh
Restoration of gravity main Pipeline of Bhauwala Maldung (Part- 5) water supply scheme under Natural Calamity
Repair of 500 KL Tank in Gauchar Drinking water supply scheme due to Natural Calamity on Dated 01-09-2025 in Block Karanprayag, Distt- Chamoli
Supply of Mobile Water Testing Lab
operation and maintenance of Jakholi Unit Dist Rudraprayag
Operation and maintenance of Rudraprayag Rural Unit Dist Rudraprayag
Survey, Supply, Installation Testing And Commissioning (SITC) Of Grid Connected On Ground Or Suitable Location In The Premises Of Scheme Solar PV Power Plant Including All Associated Electrical, Civil And Mechanical Works In Jeevangarh W/s scheme
Construction of Okharani Solar Pumping Water Supply under Scheme Didihat Division
Construction OHT and strenghtening of existing pipe lines by replacing old damaged pipe lines to new pipe line at dickling tibetan colony kirsali tarla nagal under IT Park zone of North division
SITC Of Of Grid Connected Solar PV Power Plant Including All Associated Electrical, Civil and Mechanical Works on Ground or Suitable Location at Gujronwali Office Campus Under Kharakmaf water supply Scheme
SITC of Grid Connected Solar PV Power Plant Including All Associated Electrical, Civil and Mechanical Works on Ground or Suitable Location at Tube Well Under Rishikesh Dehat WS
Survey, Supply, Installation Testing and Commission Of Grid Connected Solar PV Power Plant Including All Associated Electrical, Civil and Mechanical Works on Ground or Suitable Location at Lakkarghat Chowk, Devendra Vihar and Chini Godown Tubewell
Replacement of Sewer Line in Shradha Enclave Under Pithuwala Division Dehradun
REPLACEMENT OF G.I PIPE LINE IN PLACE OF OLD AND DAMAGE PIPE LINE AT YAMUNA COLONY WARD 33, GOVINDGARH WARD 34,SHRI DEV SUMAN WARD 35 and VIJAY PARK WARD 36 KAULAGARH ZONE UNDER NORTH DIVISION DEHRADUN
CONSTRUCTION AND RENOVATION OF OFFICE BUILDING OF RAIPUR DIVISION
Replacement of pipe line at Khadar main road (ward no-03) Raipur, Dehradun
Providing of Cesspool Suction Vehicles for rent and Supervisors during Kanwar Mela 2026 at Haridwar Roorkee Sewarage Scheme
Fully Automated DISCRETE/ MULTI PARAMETERS ANALYZER SYSTEM FOR ANALYSIS THE VARIOUS WATER QULAITY RESIDUES AS PER IS3025 PART 82 and 83
Supply of spare trolley mounted transformers of 250 KVA and 400 KVA Capacity at Hridwar
Operation and maintenance of Tallanapur GrevityUnit Dist Rudraprayag
operation and maintenance of Tallangpur Pumping Unit Dist Rudraprayag
Rain Water Harvesting Project of Jawahar Navodaya Vidyalaya Dhungiri Purola Uttarkashi