Loading…
Loading…
Tender Value
Refer Docs
EMD Value
₹11.6 L
Closing Date
24 Sept 2026, 12:00 pm
Superintending Engineer
Superintending Engineer, Uttarakhand Jal Sansthan (UJS), Almora Circle, Jakhan Devi, Almora
Construction of Pre Sedimentation Unit of 22.5 MLD Capacity and Modernization Work of Water Treatment Plant, Matela, Almora Urban Pumping Water Supply Scheme
2026_UKJS_99448_1
154/Nivida/06 dated 22.08.2026
Open Tender
Civil Works - Water Works
Item Wise
270 days
Almora
Please refer Tender documents.
4 documents required · 4 mandatory
₹5,900
Executive Engineer, UJS
₹11.6 L
Almora
27 Aug 2026
27 Aug 2026
25 Sept 2026
27 Aug 2026
24 Sept 2026
8 Sept 2026
1 Sept 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Rates of Repair of Munsyari Water Supply Scheme ( Hokara, Rumidor & Didihat) | |||||
| 1.01 | Pre Sedimentation Work
Demolition and Earth Work | - | - | - | - |
| 1.02 | Demolishing R.C.C. work manually/ by mechanical means including stacking of steel bars and disposal of unserviceable material within 50 metres lead as per direction of Engineer - in- charge. | 270.22 | cum | - | - |
| 1.03 | Earth work in excavation by mechanical means (Hydraulic excavator)/ manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge in ordinary rock. | 2,559.54 | cum | - | - |
| 1.04 | Construction of Pre Treatment Unit | - | - | - | - |
| 1.05 | Providing and laying in position machine batched and machine mixed Design mix M-25 grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer-in-charge. | 590.39 | cum | - | - |
| 1.06 | Extra for providing richer mixes (M30) at all floor levels. | 590.39 | cum | - | - |
| 1.07 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. Thermo-Mechanically Treated bars of grade Fe-500D or more. | 69,518.42 | kgs | - | - |
| 1.08 | Shuttering for RCC work
Foundations, footings, bases of columns, etc. for mass concrete | 201.22 | Sqm | - | - |
| 1.09 | Columns, Pillars, Piers, Abutments, Posts and Struts | 124.02 | sqm | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.33 MB
ETenderN.pdf
Tender Documents • 38.82 MB
BOQ_117270.xls
BOQ • 0.47 MB
Corrigendum.pdf
PDF • 0.45 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].