Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
| 3 | Admitted-Finance | Admitted-Finance |
| 4 | Admitted-Finance | Admitted-Finance |
| 5 | Rejected-Technical | Rejected-Technical Technically Unsuitable |
Tender Value
Refer Docs
Closing Date
10 Aug 2022, 11:00 amClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Manager SRC-Com
Hindustan Shipyard Limited Gandhigram SR Complex Visakhapatnam 530 005
Removal and Replacement of New Unit Coolers on MODU SAGAR BHUSHAN
2022_HSL_90800_1
20 / 22005 / Unit Coolers / 095 / 2022-23
Open Tender
Miscellaneous Services
Service
20 days
HSL Visakhapatnam
Please refer Tender documents.
7 documents required · 7 mandatory
₹0
Exempted
30 Aug 2022
5 Aug 2022
10 Aug 2022
5 Aug 2022
10 Aug 2022
5 Aug 2022
120 days
Amount
MAIN SCR ROOM UNIT COOLERS 25 TONS, UNIT COOLERS OF MAIN SCR ROOM ( STBD & PORT) ; EXISTING UNIT COOLERS ARE TO BE TAKEN OUT AND INSTALL AND COMMISSION NEW 25 TONS, DAIKIN MAKE UNIT COOLERS ( OWNER SUPPLIED ). ALL THE REQUIRED ASSOCIATED JOBS AND ANY MODIIFICATION ON THE FOUNDATION , COOLING PIPE LINES AND CONNECTION OF TRUNKING ALSO INCLUDED IN THE SCOPE.SATISFACTORY OPERATIONAL TRIALS TO BE SHOWNED TO SHIP STAFF.ALL REQUIRED MATERIALS AND CONSUMABLES ARE PROCURE, SUPPLY AND FITMENT AND MACHINING,BRAZING WORKS IN CONTRACTOR SCOPE.
UNIT COOLERS UNIT COOLER AT THE FOLLOWING LOCATIONS ARE TO BE REPLACED WITH NEW DAIKIN MAKE UNIT COOLER OF 3 TON CAPACITY(HSL SUPPLIED). JOB INCLUDE REMOVAL OF EXISTING UNIT,INSTALLATION AND COMMISSIONING OF NEW UNIT AT RESPECTIVE LOCATIONS.ALL SEA WATER AND DRAIN LINES TO BE CONNECTED TO EXISTING LINES.ALL REQUIRED MATERIALS AND CONSUMABLES ARE PROCURE,SUPPLY AND FITMENT IN CONTRACTOR SCOPE.ALL MACHINING WORKS,WELDING AND BRAZING WORKS ARE IN CONTRACTOR SCOPE.SATISFACTORY OPERATIONAL TRIALS TO BE SHOWNED TO SHIP STAFF. 1. SUBSEA STORE, 2. MECHANICAL STORE, 3. FWD A/W ROOM, 4. AFT A/W EOOM, 5. CHEMSIT LAB, 6. SUBSEA RUBBER STORE UNIT COOLER MAKE: DAIKIN, MODEL - USP3H, GAS 407 C.
UNIT COOLER(5 TONS) REMOVED FROM VFD HOUSE AND INSTALLED IN BOSUN STORE.ALL SW AND DRAIN LINES TO BE CONNECTED TO EXISTING LINES.ALL REQUIRED MATERIALS AND CONSUMABLES ARE PROCURE,SUPPLY AND FITMENT IN CONTRACTOR SCOPE.ALL MACHINING WORKS,WELDING AND BRAZING WORKS ARE IN CONTRACTOR SCOPE.SATISFACTORY OPERATIONAL TRIALS TO BE SHOWNED TO SHIP STAFF.
CROP AND REMOVE DRILL SPACE AC. ALL THE ASSOCIATED PIPE LINES, DUCTS, ELECTRICAL CONNECTIONS, FOUNDATIONS TO REMOVE. ALL SEA WATER COOLING PIPELINES REQUIRED TO BE BLANKED. MOTORS,COMPRESSORS, AHU AND OTHER ACCCESSORIES TO HAND OVER TO ONGC
Cold System Services
DILIP MARINE KANDLA
GHR MARINE TRAINING AND CERTIFICATION SERVICES PRIVATE LIMITED
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .