Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
₹73.0 L
EMD Value
₹1.5 L
Closing Date
24 Nov 2026, 3:00 pm
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
No
No
Two Packet System
Normal Tender
No
Not Applicable
Lowest to Highest
90 days
Expenditure
Revenue
Above/Below/Par
SR DEE G
16 conditions · 5 needing a document upload
T1 - Financial Turnover: The bidder should have an aggregate financial turnover not less than 1.5 times the advertised Bid value during the last three previous financial years and in the current financial year up to the date of opening of the tender. The audited balance sheet reflecting financial turnover certified by chartered accountant with his / her stamp,signature and membership number shall be considered.
T2 - Liquidity: The bidder should have access to or has available liquid assets, lines of credit and other financial means to meet cash flow that is valued at 5% of the estimated bid value net of applicant's commitments for other contracts. The audited balance sheet and/ or banking reference certified by chartered accountant with his / her stamp, signature and membership number shall be submitted by the bidder along with bid.
Banking reference should contain in clear terms the amount that bank will be in a position to lend for this work to the applicant/ member of the Joint Venture/ Consortium. In case the Net Current Assets (as seen from the Balance Sheets) are negative, only the Banking references will be considered. Otherwise the aggregate of the Net Current Assets and submitted Banking references will be considered for working out theLiquidity. The banking reference should be from a Scheduled Bank in India and it should not be more than 3 months old as on date of submission of bids.In case of JV firms overall liquidity of JV firm shall be assessed by arithmetic sum of liquidity of all members of JV.
Tenderer should submit valid Electrical License from the specified authority on the date of opening of tender on which the name of firm should have clearly mentioned, otherwise his offer will be summarily rejected. If tenderer submit the original Electrical License for renewal from where the original Electrical License is issued, tenderer should submit the proof/copy of receipt from the Electrical Safety department for consideration of offer.
Work Experience: The bidder should have satisfactorily completed in the last three previous financial years and the current financial year up to the date of opening of the tender, one similar single service contract for a minimum of 35% of advertised value of the bid. Completed service contract includes on-going service contract subject to payment of bills amounting to at least 35% of the advertised value of the bid. Similar service contract means any contract that is so specified by the competent authority. Work experience certificate from private individual shall not be accepted. Certificate from public listed company/ private company/ Trusts having annual turnover of Rs.500 crore and above subject to the same being issued from their Head office by a person of the company duly enclosing his authorisation by the Management for issuing such credentials.Definition of Similar nature of work:-" Supply, Erection, Testing and Commissioning of Lifts." O R "Comprehensive Annual Maintenance of Lifts."
38 conditions · 10 needing a document upload
Please enter the percentage of local content in the material being offered. Please enter 0 for fully imported items, and 100 for fully indigenous items. The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions.
Please submit your bank details i.e.Name of the Bank along with Bank BranchCode, IFSC Code, Beneficiary name, Account Number, Type of account, PAN and GSTN Number.
Tender Form: Tender Forms shall embody the contents of the contract documents either directly or by reference and shall be as per specimen form, Annexure-I. e-Tender Forms shall be issued free of cost to all tenderers.
Care in Submission of Tenders: Before submitting a tender, the tenderer will be deemed to have satisfied himself by actual inspection of the site and locality of the works, that all conditions liable to be encountered during the execution of the works are taken into account and that the rates he enters in the tender forms are adequate and all inclusive to accord with the provisions in the Standard General Conditions of Services for the completion of works to the entire satisfaction of the Engineer.
Right of Railway to Deal with Tenders: The Railway reserves the right of not to invite tenders for any of Railway work or works or to invite open or limited tenders and when tenders are called to accept a tender in whole or in part or reject any tender or all tenders without assigning reasons for any such action. In case if tender is accepted in part by Railway administration, Letter of Acceptance shall be issued as counter offer to the Tenderer, which shall be subject to acceptance by the Tenderer
Provisions of Make in India Policy 2017 issued by Govt. of India, as amended from time to time, shall be followed for consideration of tenders.
Execution of Contract Document: The Tenderer whose tender is accepted shall be required to appear in person at the office of General Manager/General Manager (Construction), Chief Administrative Officer (Construction), Divisional Railway Manager or concerned Engineer, as the case may be, or if tenderer is a firm or corporation, a duly authorized representative shall appear and execute the contract agreement within seven days of notice from Railways that the Contract Agreement is ready. The Contract Agreement shall be entered into by Railway only after submission of valid Performance Guarantee by the Contractor. Failure to do so shall constitute a breach of the agreement affected by the acceptance of the tender. In such cases the Railway may determine that such tenderer has abandoned the contract and there upon his tender and acceptance thereof shall be treated as cancelled and the Railway shall be entitled to forfeit the full amount of the Earnest Money and other dues payable to the Contractor under this contract. The failed Contractor shall be debarred from participating in the re-tender for that work.
If the tenderer(s) deliberately gives / give wrong information in his / their tender or creates / create circumstances for the acceptance of his / their tender, the Railway reserves the right to reject such tender at any stage.
After opening of the tender, any document pertaining to the constitution of Sole Proprietorship Firm / Partnership Firm / Registered Company/ Registered Trust / Registered Society / HUF etc. shall be neither asked nor considered, if submitted. Further, no suo moto cognizance of any document available in public domain (i.e., on internet etc.) or in Railway's record/office files etc. will be taken for consideration of the tender, if no such mention is available in tender offer submitted.
Railway Passes: No free railway passes shall be issued by the Railway to the Contractor or any of his employee/worker
Performance GuaranteeThe procedure for obtaining Performance Guarantee is outlined below: (1.11.1Performance guarantee at a rate of 5% of the contractual value shall be deposited by the successful bidder. The successful bidder shall have to submit a Performance Guarantee (PG) valuing 5% of the contract value in four separate parts of 1.25% each of the contract value, within 30 (thirty) days from the date of issue of Letter of Acceptance (LOA). Extension of time for submission of PG beyond 30 (thirty) days and upto the date of submission of PG from the date of issue of LOA may be given by the Authority who is competent to sign the contract agreement. However, a penal interest of 15% per annum shall be charged for the delay beyond 30 (thirty days, i.e. from 31st day after the date of issue of LOA. In case the contractor fails to submit the requisite PG after 60 days from the date of issue of LOA, a notice shall be served to the contractor to deposit the PG immediately however not exceeding 90 days from the date of issue of LOA). In case the contractor fails to submit the requisite PG even after 90 days from the date of issue of LOA, the contract shall be terminated duly forfeiting EMD and other dues, if any payable against that contract. The failed contractor shall be debarred from participating in re-tender for that work. In case 60th day is a bank holiday or office closure next working day should be considered as the last day for submission of the PGs. Decision of Authority competent to sign the Contract Agreement would be final in case of any dispute.
The successful bidder shall submit the Performance Guarantee (PG) in any ofthe following forms, amounting to 5% of the original contract value:-1.11.5The successful bidder shall submit the Performance Guarantee (PG) in any of the following forms amounting to 5% of the contract value:a.A deposit of cash;b.Irrevocable Bank Guarantee;c.Government Securities including State Loan Bonds at 5% below the market value;d.Deposit Receipts, Pay Orders, Demand Drafts and Guarantee Bonds. These forms of performance Guarantee could be either of the State Bank of India or of any of the Nationalized Banks;e.Guarantee Bonds executed or Deposits Receipts tendered by all scheduled Banks;f.A Deposit in the Post Office Saving Bank;g.A Deposit in the National Savings Certificates;h.Twelve years National Defence Certificates;i.Ten years Defence Deposits;j.National Defence bonds andk.Unit Trust Certificates at 5% below market value or at the face value whichever is less. Also FDR in favor of Sr. DFM North Central Railway (free from any encumbrance) may be accepted.
(1.11.2The value of PG to be submitted by the, contractor will not change for variation upto 25% (either increase or decrease). In case during the course of execution, value of the contract increases by more than 25% of the original contract value, an additional Performance Guarantee amounting to 5% (five percent) for the excess value over the original contract value shall be deposited in four equal parts by the contractor. On the other hand, if the value of Contract decreases by more than 25% of the original contract value, Performance guarantee amounting to 5% (five percent) of the decrease in the contract value shall be returned to contractor. The PG amount in excess of required PG for decreased contract value, available with railways shall be returned to the contractor duly safeguarding the interest of Railways.
Force Majeure Clause: If at any time, during the continuance of this contract, the performance in whole or in part by either party of any obligation under this contract shall be prevented or delayed by reason of any war, hostility, acts of public enemy, civil commotion, sabotage, serious loss or damage by fire, explosions, epidemics, strikes, lockouts or acts of God (hereinafter, referred to events) provided, notice of the happening of any such event is given by either party to the other within 7 days from the date of occurrence thereof, neither party shall by reason of such event, be entitled to terminate this contract nor shall either party have any claim for damages against the other in respect of such non-performance or delay in performance, and works/ services under the contract shall be resumed as soon as practicable after such event has come to an end or ceased to exist, and the decision of the Manager as to whether the works/ services have been so resumed or not shall be final and conclusive, PROVIDED FURTHER that if the performance in whole or in part of any obligation under this contract is prevented or delayed by reason of any such event for a period exceeding 120 days, either party may at its option terminate the contract by giving notice to the other party.
VARIATIONS IN EXTENT OF CONTRACT: The procedure detailed below shall be adopted for dealing with variations in quantities during execution of service contracts -1. Individual NS items in contracts shall be operated with variation of plus or minus 25% and payment would be made as per the agreement rate. For this, no finance concurrence would be required.2. In case an increase in quantity of an individual item by more than 25% of the agreement quantity is considered unavoidable, the same shall be got executed by floating a fresh tender. If floating a fresh tender for operating that item is considered not practicable, quantity of that item may be operated in excess of 125% of the agreement quantity subject to the following conditions:(a) Operation of an item by more than 125% of the agreement quantity needs the approval of an officer of the rank not less than S.A. Grade;i) Quantities operated in excess of 125% but upto 140% of the agreement quantity of the concerned item, shall be paid at 98% of the rate awarded for that item in that particular tender;ii) Quantities operated in excess of 140% but upto 150% of the agreement quantity of the concerned item shall be paid at 96% of the rate awarded for that item in that particular tender;iii) Variation in quantities of individual items beyond 150% will be prohibited and would be permitted only in exceptional unavoidable circumstances with the concurrence of associate finance and shall be paid at 96% of the rate awarded for that item in that particular tender.(b) The variation in quantities as per the above formula will apply only to the Individual items of the contract and not on the overall contract value.(c) Execution of quantities beyond 150% of the overall agreement value should not be permitted and, if found necessary, should be only through fresh tenders or by negotiating with existing contractor, with prior personal concurrence of FA&CAO / FA&CAO(C) and approval of General Manager.
43.(2) Signing of "No Claim" Certificate : The Contractor shall not be entitled to make any claim whatsoever against the Railway under or by virtue of or arising out of this contract, nor shall the Railway entertain or consider any such claim, if made by the Contractor, after he shall have signed a "No Claim" Certificate in favour of the Railway in such form as shall be required by the Railway after the works are finally measured up. The Contactor shall be debarred from disputing the correctness of the items covered by "No Claim" Certificate or demanding a clearance to arbitration in respect thereof.
The payment are subject to compliance of contract obligations followed by Rlys in works contract which are in brief- signing of contract agreement after verification of power of attorney by Rlys legal department, furnishing PG, bill in Rlys standard form etc.Payment against contract shall be made by Sr. DFM/NCR/Agra, as verified by Sr. DEE/G/Agra.
Price Variation Clause (PVC): As per General Condition Contract April 2022 Applicable, and As per Railway Board Letter No.2013/CE-I/CT/0/10/PVC/Pt.1 dt. 27-01-2015 Non-application of Price Variation clause (PVC) to Annual Maintenance Contracts (AMC) and Zonal Contracts.
Contractor should followed strictly all labor laws applicable upto date as per attached letters with Tender.Note- 1.Tenderer must upload the details on shramik kalyan portal before submitting bill. 2. Tenderer must upload the details on e-shram portal before submitting bill.
Tenderer are advised to refer Indian Railways Standard General Condition of Services w.e.f 2018 before/After submission of tender according to which contract shall be governed.
Payment condition:- Payment of running bills/ on account payment: On Account payment will be made after every three months.All Taxes will be deducted from the payment by the Railway as per extent rule.This being a work contract, rates should be inclusive of all tax/surcharge liabilities. Payment will be made through EFT/ECS of work accepted by the Railway.The rates shall remain unchanged throughout the contract period.No octroi is payable. However, a certificate may be issued to the effect that material is for Railway use.
In cases where decrease is involved during execution of contract -(a) The contract signing authority can decrease the items upto 25% of individual item without finance concurrence.(b)For decrease beyond 25% for individual items or 25% of contract agreement value, the approval of an officer not less than rank of S.A. Grade may be taken, after obtaining 'No Claim Certificate' from the contractor and with finance concurrence, giving detailed reasons for each such decrease in the quantities.(c) It should be certified that the work proposed to be reduced will not be required in the same work.6.2. The limit for varying quantities for minor value items shall be 100% (as against 25% prescribed for other items). A minor value item for this purpose is defined as an item whose original agreement value is less than 1 % of the total original agreement value.6.3. As far as SOR items are concerned, the limit of 25% would apply to the value of SOR schedule as a whole and not on individual SOR items. However, in case of NS items , the limit of 25% would apply on the individual items irrespective of the manner of quoting the rate (single percentage rate or individual item rate).6.4 For the tenders accepted at Zonal Railways level, variations in the quantities will be approved by the authority in whose powers revised value of the agreement lies.6.5 For tenders accepted by General Manager, variations upto 125% of the original agreement value may be accepted by General Manager.6.6 The aspect of vitiation of tender with respect to variation in quantities should be checked and avoided. In case of vitiation of the tender (both for increase as well as decrease of value of contract agreement, the vitiation shall be on the contractor's account (payment shall be restricted to the lowest calculated value of all valid offers).
Comprehensive Annual Maintenance Contract (CAMC) of 06 Nos(Otis make)Lifts installed at Agra cantt. Railway Station & Agra fort Railway station for 05 years.
AGC-ELG-T-10-2026-27~NCR
AGC-ELG-T-10-2026-27
Single
Service - General
60 Months
Agra, Uttar Pradesh
₹0
₹1.5 L
2 Nov 2026
2 Nov 2026
10 Nov 2026
14 items across 1 schedule
| # | Description | Unit | Qty | Rate | Amount |
|---|---|---|---|---|---|
| — | — | — | 72,96,233.58 | ||
| — | 72.00 | — | — | ||
| AMC of First Year | — | — | — | 8,20,628.64 | |
| — | 72.00 | — | — | ||
| AMC of Second Year | — | — | — | 9,19,103.76 | |
| — | 72.00 | — | — | ||
| AMC of Third Year | — | — | — | 10,29,396.96 | |
| — | 72.00 | — | — | ||
| AMC of Fourth Year | — | — | — | 11,52,924.48 | |
| — | 72.00 | — | — | ||
| AMC of Fifth Year | — | — | — | 12,91,274.64 | |
| Ultra Rgen Drive OVR03B 402=01 no.RSEB Board=02 nos,SPBC III=01 no.PCB,BCB GeN2 w/ARO=01 no.Kit of Rollers=04 nos.,DR Drive Beltfix PAX-1PC only=02 nos.Pax CAr Cam with Deterrent=01 no.CSB Belt-30 mm width=90 nos.,12V 12AH=04 nos,PCB Comb HB & P1=02 nos,Aircord,PAX Car Door OP 900=01 nos,AirCord Prima LDG=02 nos,SMPS 350W=01 no.Contct & ACTU-AZ14-&-KDL AZ14B=02 nos,AT 120 Kit-Non LVA-RH=01 no,Door Protection w/HARN Cable=01 no. for Agra cantt Railway station. | — | — | — | 7,73,581.45 | |
| AT120 Kit-LVA=01 no.,Ultra Drive UD402(ACD5)=01 no,Display4.3" HP BLU B/G=WHI=02 nos,RSEB Board=01 no.,GECB_LV w/oERO UP/DN=01no,CSPB=01 no,SMPS 150W=01 no.SMPS=-48W | — | — | — | 5,99,875.33 | |
| AT120 kit-LVA=01 no,Ultra Drive UD402(ACD5)=01 no,Display 4.3" HPI BLU B/G=WHI=02 nos,RSEB Board=01 no. GECB_LV w/oERO UP/DN=01 no,CSPB=01 no. SMPS 150w=01 no. SMPS-48w=01 no.Pax Car Door Cam with Deterent=01 no,AirCord,PAX Car DOOR OP 900=01 no,Aircord Prima LDG=01 no.CONTCT & ACTU-AZ14-&-KDL AZ14B=02 nos,CSB Belt=30mm Width=90nos,Door Protection w/HARN cable=01 no. for Agra fort Railway station. | — | — | — | 7,09,448.32 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
SHRAMIKKALYAN_GCC_17102018.pdf
ATTACHMENT
Letterofcredit.pdf
ATTACHMENT
smilift_modifiedSept.2026.pdf
ATTACHMENT
AnnexureC.pdf
ATTACHMENT
AnnexureVA1Policy.pdf
ATTACHMENT
Laborlaws_compressed.pdf
ATTACHMENT
GCCService2018.pdf
ATTACHMENT
TenderDocument.pdf
ATTACHMENT
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .