Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance A 183 TTC INDUSTRIAL AREA KHAIRANE MIDC THANE BELAPUR ROAD NAVI MUMBAI THANE MAHARASHTRA 400705 | THANE | MAHARASHTRA | 400705 | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
| 3 | Admitted-Finance | Admitted-Finance |
| 4 | Admitted-Finance | Admitted-Finance |
| 5 | Admitted-Finance | Admitted-Finance |
Tender Value
Refer Docs
Closing Date
16 Apr 2021, 11:00 amClosed
Manager SRC-Com
SR Complex Hindustan Shipyard Limited Gandhigram Visakhapatnam 530 005
Propeller Shaft and Propeller Routines on MFV Matsya Darshini.
2021_HSL_85713_1
20/20012/005/2021-22
Open Tender
Miscellaneous Services
Service
15 days
HSL Visakhapatnam
As per tender document
6 documents required · 6 mandatory
₹0
Exempted
21 Apr 2021
12 Apr 2021
16 Apr 2021
12 Apr 2021
16 Apr 2021
12 Apr 2021
Amount
Scrapping & removing the marine growth from Propeller blades. Polishing of propeller blades and hub in position.
Propeller shaft rope guard to be removed, measure and record propeller drop before removal and after fitment of the shaft and rope guard to be fitted back. Drain stern tube oil, collect in drums. Filling of oil post completion of overhauling.
The Propeller shaft is to be withdrawn, dismantled, cleaned, serviced and offered to Surveyor, MMD for inspection. As per the recommendations of the Surveyor propeller shaft is to be serviced. Tail shaft survey to be carried out. Record all bush readings.
The propeller blades DP test and shaft MP test is to be carried out. DP test kit to be arranged by contractor.
Poker gauge readings are to be taken before dismantling & after assembling of the propeller shat. All shaft seals incuding push pull rod are to be renewed. The shaft is to be assembled on board, after fitment. Renewal of FWD and AFT seals and other spares and required (seal and spares HSL Supply)
Overhauling of CPP hub: (Anticipatory works) a) CPP hub oil to be drained. CPP blades to be removed. b) Hub dismantling to be carried out. Cleaning of hub and associated components to be done. c) All clearance to be recorded. d) As required spares and seals to be replaced. e) CPP hub to be assembled back and oil filling to be done.
RAO ELECTRICAL ENGINEERING WORKS
KALATHIL BROTHERS CONSTRUCTION CO. PVT. LTD.
SRI SRINIVASA ENGINEERING WORKS
SRISAI OILFIELD EQUIPMENTS AND MARINE SERVICES PVT LTD
Goltens India Private Limited
JAMI HYDRAULIC
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .