Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹56.9 LAccepted-Finance | ₹56.9 L | L1 | Accepted-Finance Found in Order |
| 2 | L2₹57.3 L+₹38,739.70 (0.68%)Accepted-Finance | ₹57.3 L+₹38,739.70 (0.68%) | L2 | Accepted-Finance Found in Order |
| 3 | L3₹5.8 L−₹51.1 L (89.8%)Accepted-Finance | ₹5.8 L−₹51.1 L (89.8%) | L3 | Accepted-Finance Found in Order |
| 4 | L4₹58.3 L+₹1.4 L (2.40%)Accepted-Finance | ₹58.3 L+₹1.4 L (2.40%) | L4 | Accepted-Finance Found in Order |
| 5 | L5₹59.6 L+₹2.7 L (4.69%)Accepted-Finance | ₹59.6 L+₹2.7 L (4.69%) | L5 | Accepted-Finance Found in Order |
Tender Value
₹80 L
EMD Value
₹4 L
Closing Date
8 Jun 2026, 3:00 pmClosed
Executive Engineer CMD USHP-II Kangan
CMD USHP-II Kangan
Treatment of Thune Escape Nallah of USHP-II.
2026_SPDC_309986_1
01 OF 2026-27
Open Tender
Civil Works
Percentage
120 days
Thune Kangan
Please refer Tender documents.
3 documents required · 3 mandatory
₹4,000
CPAO JKPDC Kangan
₹4 L
2 Jul 2026
15 May 2026
10 Jun 2026
15 May 2026
8 Jun 2026
15 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1.01 | Earth work in bulk excavation by mechanical means (hydraulic excavator) over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge. in all kinds of soil. | 1 | Cum | - | - |
| 1.02 | Earth work in bulk excavation by mechanical means (hydraulic excavator) over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge. in ordinary rock/ large boulders. | 1 | Cum | - | - |
| 1.03 | Providing and laying of soling stones | 1 | Cum | - | - |
| 1.04 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) | 1 | Cum | - | - |
| 1.05 | Centering and shuttering including strutting, propping etc. and removal of form work for:Retaining walls, return walls, walls (any thickness) including attached pilasters buttresses, plinth and string course fillets, kerbs andsteps etc | - | Sqm | - | - |
| 1.06 | Providing and laying cement concrete in retaining walls, return walls, walls (any thickness) including attached pilasters, columns, piers, abutments, pillars, posts,struts, buttresses, string or lacing courses, parapets, coping, bed blocks, anchors blocks, plain window sills, fillets etcupto floor V level, including curing but excluding the cost of centring, shuttering and finishing with 4.5.3 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) | - | Cum | - | - |
| 1.07 | Dismantling old crate works | - | Cum | - | - |
| 1.08 | Providing & making Gabion structure with Mechanically Woven Double Twisted Hexagonal Shaped Wire mesh Gabion Boxes as per IS 16014:2012, MORTH Clause 2500, of required size, Mesh Type 10x12 (D=100 mm with tolerance of ± 2%) Zinc coated, Mesh wire diameter 3.0mm, mechanically edged/selvedged with partitions at every 1m interval and shall have minimum 10 numbers of openings per meter of mesh perpendicular to twist, tying with lacing wire of diameter 2.2mm, supplied @ 3% by weight of Gabion boxes, filled with boulders/ nallah stones with least dimension of 200 mm, as per drawing, all complete as per direction of Engineer-in-charge..(stone rate deducted ) | - | Cum | - | - |
| 1.09 | Providing and laying of stone boulders in gabions including all leads and lifts all complete as per direction of Engineer-in-charge. | - | Cum | 1 | - |
| 1.1 | Providing and laying of stone boulders in gabions including all leads and lifts all complete as per direction of Engineer-in-charge. (Available Stone-Laying only) | 1 | Cum | - | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.17 MB
BOQ_1003144.xls
BOQ • 0.32 MB
corrigendum01F.pdf
PDF • 0.59 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .