| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
| 3 | Admitted-Finance | Admitted-Finance |
| 4 | Admitted-Finance | Admitted-Finance |
| 5 | Admitted-Finance | Admitted-Finance |
Tender Value
Refer Docs
Closing Date
10 Jun 2021, 10:00 amClosed
ASD
NAVAL DOCKYARD VISAKHAPATNAM
DEGUTTING AND REGUTTING, REPAIR/RENEWAL OF PIPES, REPAIR/OVERHAULING OF VALVES/REDUCERS AND AIR BOTTLES IN SHIP
2021_NAVY_444445_1
COM/OFF/SAX/20-21/968
Open Tender
Marine Services
Turn-key
200 days
NAVAL DOCKYARD VISAKHAPATNAM
Please refer Tender documents.
5 documents required · 5 mandatory
₹0
Exempted
NAVAL DOCKYARD VISAKHAPATNAM
2 Jul 2021
20 May 2021
11 Jun 2021
20 May 2021
10 Jun 2021
31 May 2021
20 May 2021 - 10 Jun 2021
27 May 2021
System pipes.Degutting with metallic tallies, hot work, plastic caps for ends, transportation, shifting to department along with transportation, system & location drawings post completion of QC checks.Upto 3" (Inch)
System pipes.Degutting with metallic tallies, hot work, plastic caps for ends, transportation, shifting to department along with transportation, system & location drawings post completion of QC checks.Greater than 3" and up to 5" (Inch)
System pipes.Degutting with metallic tallies, hot work, plastic caps for ends, transportation, shifting to department along with transportation, system & location drawings post completion of QC checks.Greater than 5" and up to 7" (Inch)
System pipes.Degutting with metallic tallies, hot work, plastic caps for ends, transportation, shifting to department along with transportation, system & location drawings post completion of QC checks.Greater than 7" and up to 10" (Inch)
System pipes.Transportation from shop floor to onboard, Regutting the system as per drawing with fasteners, washers, gaskets, clamping & clamp welding as per IS/BS material standards , proving the system with air/ water as per testing pressure along with QC clearance. All services and consumable material to be provided by the Firm.Upto 3" (Inch)
System pipes.Transportation from shop floor to onboard, Regutting the system as per drawing with fasteners, washers, gaskets, clamping & clamp welding as per IS/BS material standards , proving the system with air/ water as per testing pressure along with QC clearance. All services and consumable material to be provided by the Firm.Greater than 3" and up to 5" (Inch)
System pipes.Transportation from shop floor to onboard, Regutting the system as per drawing with fasteners, washers, gaskets, clamping & clamp welding as per IS/BS material standards , proving the system with air/ water as per testing pressure along with QC clearance. All services and consumable material to be provided by the Firm.Greater than 5" and up to 7" (Inch)
System pipes.Transportation from shop floor to onboard, Regutting the system as per drawing with fasteners, washers, gaskets, clamping & clamp welding as per IS/BS material standards , proving the system with air/ water as per testing pressure along with QC clearance. All services and consumable material to be provided by the Firm.Greater than 7" and up to 10" (Inch)
New Pipe.Repair/ renewal of system pipes as per sample. The job includes bending/fabrication, cutting, welding, end preparation, pressure testing as per testing procedures, painting and preservation to be provided by the firm along with QC checks.Pipe Carbon/Seamless steel/WI, material as per MIL-T-18165A Type A Class 1/ MIL-T-20157 Type A,B,C,D& E/ ASTM-A100 & 106 Grade A, Up to 1" (Inch)
New Pipe.Repair/ renewal of system pipes as per sample. The job includes bending/fabrication, cutting, welding, end preparation, pressure testing as per testing procedures, painting and preservation to be provided by the firm along with QC checks.Pipe Carbon/Seamless steel/WI, material as per MIL-T-18165A Type A Class 1/ MIL-T-20157 Type A,B,C,D& E/ ASTM-A100 & 106 Grade A, Greater than 1" up to 2"(Inch)
New Pipe.Repair/ renewal of system pipes as per sample. The job includes bending/fabrication, cutting, welding, end preparation, pressure testing as per testing procedures, painting and preservation to be provided by the firm along with QC checks.Pipe Carbon/Seamless steel/WI, material as per MIL-T-18165A Type A Class 1/ MIL-T-20157 Type A,B,C,D& E/ ASTM-A100 & 106 Grade A, Greater than 2" up to 3"(Inch)
New Pipe.Repair/ renewal of system pipes as per sample. The job includes bending/fabrication, cutting, welding, end preparation, pressure testing as per testing procedures, painting and preservation to be provided by the firm along with QC checks.Pipe Carbon/Seamless steel/WI, material as per MIL-T-18165A Type A Class 1/ MIL-T-20157 Type A,B,C,D& E/ ASTM-A100 & 106 Grade A, Greater than 3" up to 4"(Inch)
New Pipe.Repair/ renewal of system pipes as per sample. The job includes bending/fabrication, cutting, welding, end preparation, pressure testing as per testing procedures, painting and preservation to be provided by the firm along with QC checks.Pipe Carbon/Seamless steel/WI, material as per MIL-T-18165A Type A Class 1/ MIL-T-20157 Type A,B,C,D& E/ ASTM-A100 & 106 Grade A, Greater than 4" up to 5"(Inch)
New Pipe.Repair/ renewal of system pipes as per sample. The job includes bending/fabrication, cutting, welding, end preparation, pressure testing as per testing procedures, painting and preservation to be provided by the firm along with QC checks.Pipe Carbon/Seamless steel/WI, material as per MIL-T-18165A Type A Class 1/ MIL-T-20157 Type A,B,C,D& E/ ASTM-A100 & 106 Grade A, Greater than 5" up to 6" (Inch)
New Pipe.Repair/ renewal of system pipes as per sample. The job includes bending/fabrication, cutting, welding, end preparation, pressure testing as per testing procedures, painting and preservation to be provided by the firm along with QC checks.Pipe Carbon/Seamless steel/WI, material as per MIL-T-18165A Type A Class 1/ MIL-T-20157 Type A,B,C,D& E/ ASTM-A100 & 106 Grade A, Greater than 6" up to 8" (Inch)
New Pipe.Repair/ renewal of system pipes as per sample. The job includes bending/fabrication, cutting, welding, end preparation, pressure testing as per testing procedures, painting and preservation to be provided by the firm along with QC checks.Pipe Copper, Material as per WW-T-797A/ MIL-T-875/WW-T-7990/ WW-T-7978, Up to 1" (Inch)
New Pipe.Repair/ renewal of system pipes as per sample. The job includes bending/fabrication, cutting, welding, end preparation, pressure testing as per testing procedures, painting and preservation to be provided by the firm along with QC checks.Pipe Copper, Material as per WW-T-797A/ MIL-T-875/WW-T-7990/ WW-T-7978, Greater than 1" up to 2"(Inch)
New Pipe.Repair/ renewal of system pipes as per sample. The job includes bending/fabrication, cutting, welding, end preparation, pressure testing as per testing procedures, painting and preservation to be provided by the firm along with QC checks.Pipe Copper, Material as per WW-T-797A/ MIL-T-875/WW-T-7990/ WW-T-7978, Greater than 2" up to 3"(Inch)
New Pipe.Repair/ renewal of system pipes as per sample. The job includes bending/fabrication, cutting, welding, end preparation, pressure testing as per testing procedures, painting and preservation to be provided by the firm along with QC checks.Pipe Copper, Material as per WW-T-797A/ MIL-T-875/WW-T-7990/ WW-T-7978, Greater than 6" up to 8" (Inch)
New Pipe.Repair/ renewal of system pipes as per sample. The job includes bending/fabrication, cutting, welding, end preparation, pressure testing as per testing procedures, painting and preservation to be provided by the firm along with QC checks.Pipe Copper Nickel, material as per MIL-C-15726/ MIL-T-16420 Type I &II class 200, Up to 1" (Inch)
New Pipe.Repair/ renewal of system pipes as per sample. The job includes bending/fabrication, cutting, welding, end preparation, pressure testing as per testing procedures, painting and preservation to be provided by the firm along with QC checks.Pipe Copper Nickel, material as per MIL-C-15726/ MIL-T-16420 Type I &II class 200, Greater than 1" up to 2"(Inch)
New Pipe.Repair/ renewal of system pipes as per sample. The job includes bending/fabrication, cutting, welding, end preparation, pressure testing as per testing procedures, painting and preservation to be provided by the firm along with QC checks.Pipe Copper Nickel, material as per MIL-C-15726/ MIL-T-16420 Type I &II class 200, Greater than 2" up to 3"(Inch)
New Pipe.Repair/ renewal of system pipes as per sample. The job includes bending/fabrication, cutting, welding, end preparation, pressure testing as per testing procedures, painting and preservation to be provided by the firm along with QC checks.Pipe Copper Nickel, material as per MIL-C-15726/ MIL-T-16420 Type I &II class 200, Greater than 3" up to 4"(Inch)
New Pipe.Repair/ renewal of system pipes as per sample. The job includes bending/fabrication, cutting, welding, end preparation, pressure testing as per testing procedures, painting and preservation to be provided by the firm along with QC checks.Pipe Copper Nickel, material as per MIL-C-15726/ MIL-T-16420 Type I &II class 200, Greater than 4" up to 5"(Inch)
New Pipe.Repair/ renewal of system pipes as per sample. The job includes bending/fabrication, cutting, welding, end preparation, pressure testing as per testing procedures, painting and preservation to be provided by the firm along with QC checks.Pipe Copper Nickel, material as per MIL-C-15726/ MIL-T-16420 Type I &II class 200, Greater than 5" up to 6" (Inch)
New Pipe.Repair/ renewal of system pipes as per sample. The job includes bending/fabrication, cutting, welding, end preparation, pressure testing as per testing procedures, painting and preservation to be provided by the firm along with QC checks.Pipe Copper Nickel, material as per MIL-C-15726/ MIL-T-16420 Type I &II class 200, Greater than 6" up to 8" (Inch)
Pipe.Supply of pipe material.Pipe Carbon/Seamless steel/WI, material as per MIL-T-18165A Type A Class 1/ MIL-T-20157 Type A,B,C,D& E/ ASTM-A100 & 106 Grade A, Dia 15.6mmX2.5mm Thk
Pipe.Supply of pipe material.Pipe Carbon/Seamless steel/WI, material as per MIL-T-18165A Type A Class 1/ MIL-T-20157 Type A,B,C,D& E/ ASTM-A100 & 106 Grade A, Dia 20mmX2mm Thk
Pipe.Supply of pipe material.Pipe Carbon/Seamless steel/WI, material as per MIL-T-18165A Type A Class 1/ MIL-T-20157 Type A,B,C,D& E/ ASTM-A100 & 106 Grade A, Dia 42mmX3mm Thk
Pipe.Supply of pipe material.Pipe Carbon/Seamless steel/WI, material as per MIL-T-18165A Type A Class 1/ MIL-T-20157 Type A,B,C,D& E/ ASTM-A100 & 106 Grade A, Dia 45mmX3mm Thk
Pipe.Supply of pipe material.Pipe Carbon/Seamless steel/WI, material as per MIL-T-18165A Type A Class 1/ MIL-T-20157 Type A,B,C,D& E/ ASTM-A100 & 106 Grade A, Dia 60mmX4mm Thk
Pipe.Supply of pipe material.Pipe Carbon/Seamless steel/WI, material as per MIL-T-18165A Type A Class 1/ MIL-T-20157 Type A,B,C,D& E/ ASTM-A100 & 106 Grade A, Dia 60mmX14mm Thk
Pipe.Supply of pipe material.Pipe Carbon/Seamless steel/WI, material as per MIL-T-18165A Type A Class 1/ MIL-T-20157 Type A,B,C,D& E/ ASTM-A100 & 106 Grade A, Dia 85mmX5mm Thk
Pipe.Supply of pipe material.Pipe Carbon/Seamless steel/WI, material as per MIL-T-18165A Type A Class 1/ MIL-T-20157 Type A,B,C,D& E/ ASTM-A100 & 106 Grade A, Dia 114mmX6mm Thk
Pipe.Supply of pipe material.Pipe Carbon/Seamless steel/WI, material as per MIL-T-18165A Type A Class 1/ MIL-T-20157 Type A,B,C,D& E/ ASTM-A100 & 106 Grade A, Dia 200mmX6mm Thk
Pipe.Supply of pipe material.Pipe Copper, Material as per WW-T-797A/ MIL-T-875/WW-T-7990/ WW-T-7978, Dia 6mmX1mm Thk
Pipe.Supply of pipe material.Pipe Copper, Material as per WW-T-797A/ MIL-T-875/WW-T-7990/ WW-T-7978, Dia 8mmX1.5mm Thk
Pipe.Supply of pipe material.Pipe Copper, Material as per WW-T-797A/ MIL-T-875/WW-T-7990/ WW-T-7978, Dia 24mmX2.5mm Thk
Pipe.Supply of pipe material.Pipe Copper, Material as per WW-T-797A/ MIL-T-875/WW-T-7990/ WW-T-7978, Dia 55mmX2.5mm Thk
Pipe.Supply of pipe material.Pipe Copper, Material as per WW-T-797A/ MIL-T-875/WW-T-7990/ WW-T-7978, Dia 154mmX2.5mm Thk
Pipe.Supply of pipe material.Pipe Copper Nickel, material as per MIL-C-15726/ MIL-T-16420 Type I &II class 200, Dia 20mmX2mm Thk
Pipe.Supply of pipe material.Pipe Copper Nickel, material as per MIL-C-15726/ MIL-T-16420 Type I &II class 200, Dia 22mmX2mm Thk
Pipe.Supply of pipe material.Pipe Copper Nickel, material as per MIL-C-15726/ MIL-T-16420 Type I &II class 200, Dia 34mmX2mm Thk
Pipe.Supply of pipe material.Pipe Copper Nickel, material as per MIL-C-15726/ MIL-T-16420 Type I &II class 200, Dia 42mmX2mm Thk
Pipe.Supply of pipe material.Pipe Copper Nickel, material as per MIL-C-15726/ MIL-T-16420 Type I &II class 200, Dia 58mmX1.5mm Thk
Pipe.Supply of pipe material.Pipe Copper Nickel, material as per MIL-C-15726/ MIL-T-16420 Type I &II class 200, Dia 60mmX4mm Thk
Pipe.Supply of pipe material.Pipe Copper Nickel, material as per MIL-C-15726/ MIL-T-16420 Type I &II class 200, Dia 132mmX6mm Thk
Pipe.Supply of pipe material.Pipe Copper Nickel, material as per MIL-C-15726/ MIL-T-16420 Type I &II class 200, Dia 194mmX4mm Thk
Pipe.Supply of pipe material.Pipe Copper Nickel, material as per MIL-C-15726/ MIL-T-16420 Type I &II class 200, Dia 200mmX3.5mm Thk
Welding of pipes.Welding with pipe to pipe, pipe with flange at shop floor/ insitu at onboard and Radiography test on weld joint along with all QC checks. This includes services, Radiography test, welding material like electrodes and filler rods approved by ND(V) as per standards E6013/E7018/ AWS to be provided by the Firm.Carbon/ Steel/WI, Up to 1" (Inch)
Welding of pipes.Welding with pipe to pipe, pipe with flange at shop floor/ insitu at onboard and Radiography test on weld joint along with all QC checks. This includes services, Radiography test, welding material like electrodes and filler rods approved by ND(V) as per standards E6013/E7018/ AWS to be provided by the Firm.Carbon/ Steel/WI, Greater than 1" up to 2"(Inch)
Welding of pipes.Welding with pipe to pipe, pipe with flange at shop floor/ insitu at onboard and Radiography test on weld joint along with all QC checks. This includes services, Radiography test, welding material like electrodes and filler rods approved by ND(V) as per standards E6013/E7018/ AWS to be provided by the Firm.Carbon/ Steel/WI, Greater than 2" up to 3"(Inch)
Welding of pipes.Welding with pipe to pipe, pipe with flange at shop floor/ insitu at onboard and Radiography test on weld joint along with all QC checks. This includes services, Radiography test, welding material like electrodes and filler rods approved by ND(V) as per standards E6013/E7018/ AWS to be provided by the Firm.Carbon/ Steel/WI, Greater than 3" up to 4"(Inch)
Welding of pipes.Welding with pipe to pipe, pipe with flange at shop floor/ insitu at onboard and Radiography test on weld joint along with all QC checks. This includes services, Radiography test, welding material like electrodes and filler rods approved by ND(V) as per standards E6013/E7018/ AWS to be provided by the Firm.Carbon/ Steel/WI, Greater than 4" up to 6" (Inch)
Welding of pipes.Welding with pipe to pipe, pipe with flange at shop floor/ insitu at onboard and Radiography test on weld joint along with all QC checks. This includes services, Radiography test, welding material like electrodes and filler rods approved by ND(V) as per standards E6013/E7018/ AWS to be provided by the Firm.Carbon/ Steel/WI, Greater than 6" up to 8" (Inch)
Welding of pipes.Welding with pipe to pipe, pipe with flange at shop floor/ insitu at onboard and Radiography test on weld joint along with all QC checks. This includes services, Radiography test, welding material like electrodes and filler rods approved by ND(V) as per standards E6013/E7018/ AWS to be provided by the Firm.Copper/ Cu.Ni., Up to 1" (Inch)
Welding of pipes.Welding with pipe to pipe, pipe with flange at shop floor/ insitu at onboard and Radiography test on weld joint along with all QC checks. This includes services, Radiography test, welding material like electrodes and filler rods approved by ND(V) as per standards E6013/E7018/ AWS to be provided by the Firm.Copper/ Cu.Ni., Greater than 1" up to 2"(Inch)
Welding of pipes.Welding with pipe to pipe, pipe with flange at shop floor/ insitu at onboard and Radiography test on weld joint along with all QC checks. This includes services, Radiography test, welding material like electrodes and filler rods approved by ND(V) as per standards E6013/E7018/ AWS to be provided by the Firm.Copper/ Cu.Ni., Greater than 2" up to 3"(Inch)
Welding of pipes.Welding with pipe to pipe, pipe with flange at shop floor/ insitu at onboard and Radiography test on weld joint along with all QC checks. This includes services, Radiography test, welding material like electrodes and filler rods approved by ND(V) as per standards E6013/E7018/ AWS to be provided by the Firm.Copper/ Cu.Ni., Greater than 3" up to 4"(Inch)
Welding of pipes.Welding with pipe to pipe, pipe with flange at shop floor/ insitu at onboard and Radiography test on weld joint along with all QC checks. This includes services, Radiography test, welding material like electrodes and filler rods approved by ND(V) as per standards E6013/E7018/ AWS to be provided by the Firm.Copper/ Cu.Ni., Greater than 4" up to 6"(Inch)
Welding of pipes.Welding with pipe to pipe, pipe with flange at shop floor/ insitu at onboard and Radiography test on weld joint along with all QC checks. This includes services, Radiography test, welding material like electrodes and filler rods approved by ND(V) as per standards E6013/E7018/ AWS to be provided by the Firm.Copper/ Cu.Ni., Greater than 6" up to 8" (Inch)
Gate Valve.Degutting from system, tallying, plastic caps for ends, transportation to shop floor/ workshop, chemical cleaning, repair/overhauling, metal buildup and machining, change of consumables like spindles/seats/gate/ball/disc, pressure testing as per testing procedure, painting, preservation, regutting as per location drawing along with QC clearance. All services and material to be provided by the Firm.Greater than 1" up to 2"(Inch)
Gate Valve.Degutting from system, tallying, plastic caps for ends, transportation to shop floor/ workshop, chemical cleaning, repair/overhauling, metal buildup and machining, change of consumables like spindles/seats/gate/ball/disc, pressure testing as per testing procedure, painting, preservation, regutting as per location drawing along with QC clearance. All services and material to be provided by the Firm.Greater than 2" up to 3"(Inch)
Gate Valve.Degutting from system, tallying, plastic caps for ends, transportation to shop floor/ workshop, chemical cleaning, repair/overhauling, metal buildup and machining, change of consumables like spindles/seats/gate/ball/disc, pressure testing as per testing procedure, painting, preservation, regutting as per location drawing along with QC clearance. All services and material to be provided by the Firm.Greater than 4" up to 5"(Inch)
Gate Valve.Degutting from system, tallying, plastic caps for ends, transportation to shop floor/ workshop, chemical cleaning, repair/overhauling, metal buildup and machining, change of consumables like spindles/seats/gate/ball/disc, pressure testing as per testing procedure, painting, preservation, regutting as per location drawing along with QC clearance. All services and material to be provided by the Firm.Greater than 5" up to 6"(Inch)
Gate Valve.Degutting from system, tallying, plastic caps for ends, transportation to shop floor/ workshop, chemical cleaning, repair/overhauling, metal buildup and machining, change of consumables like spindles/seats/gate/ball/disc, pressure testing as per testing procedure, painting, preservation, regutting as per location drawing along with QC clearance. All services and material to be provided by the Firm.Greater than 7" up to 8"(Inch)
Hydraulic Valve.Degutting from system, tallying, plastic caps for ends, transportation to shop floor/ workshop, chemical cleaning, repair/overhauling, metal buildup and machining, change of consumables like spindles/seats/gate/ball/disc, pressure testing as per testing procedure, painting, preservation, regutting as per location drawing along with QC clearance. All services and material to be provided by the Firm.Greater than 3" up to 4"(Inch)
Hydraulic Valve.Degutting from system, tallying, plastic caps for ends, transportation to shop floor/ workshop, chemical cleaning, repair/overhauling, metal buildup and machining, change of consumables like spindles/seats/gate/ball/disc, pressure testing as per testing procedure, painting, preservation, regutting as per location drawing along with QC clearance. All services and material to be provided by the Firm.Greater than 7" up to 8"(Inch)
Hydraulic Valve.Degutting from system, tallying, plastic caps for ends, transportation to shop floor/ workshop, chemical cleaning, repair/overhauling, metal buildup and machining, change of consumables like spindles/seats/gate/ball/disc, pressure testing as per testing procedure, painting, preservation, regutting as per location drawing along with QC clearance. All services and material to be provided by the Firm.Greater than 9" up to 10"(Inch)
Hydraulic Valve.Degutting from system, tallying, plastic caps for ends, transportation to shop floor/ workshop, chemical cleaning, repair/overhauling, metal buildup and machining, change of consumables like spindles/seats/gate/ball/disc, pressure testing as per testing procedure, painting, preservation, regutting as per location drawing along with QC clearance. All services and material to be provided by the Firm.Greater than 13" up to 14"(Inch)
Butter fly Valve.Degutting from system, tallying, plastic caps for ends, transportation to shop floor/ workshop, chemical cleaning, repair/overhauling, metal buildup and machining, change of consumables like spindles/seats/gate/ball/disc, pressure testing as per testing procedure, painting, preservation, regutting as per location drawing along with QC clearance. All services and material to be provided by the Firm.Greater than 2" up to 3"(Inch)
Butter fly Valve.Degutting from system, tallying, plastic caps for ends, transportation to shop floor/ workshop, chemical cleaning, repair/overhauling, metal buildup and machining, change of consumables like spindles/seats/gate/ball/disc, pressure testing as per testing procedure, painting, preservation, regutting as per location drawing along with QC clearance. All services and material to be provided by the Firm.Greater than 3" up to 4"(Inch)
Butter fly Valve.Degutting from system, tallying, plastic caps for ends, transportation to shop floor/ workshop, chemical cleaning, repair/overhauling, metal buildup and machining, change of consumables like spindles/seats/gate/ball/disc, pressure testing as per testing procedure, painting, preservation, regutting as per location drawing along with QC clearance. All services and material to be provided by the Firm.Greater than 4" up to 5"(Inch)
Butter fly Valve.Degutting from system, tallying, plastic caps for ends, transportation to shop floor/ workshop, chemical cleaning, repair/overhauling, metal buildup and machining, change of consumables like spindles/seats/gate/ball/disc, pressure testing as per testing procedure, painting, preservation, regutting as per location drawing along with QC clearance. All services and material to be provided by the Firm.Greater than 11" up to 12"(Inch)
Globe Valve.Degutting from system, tallying, plastic caps for ends, transportation to shop floor/ workshop, chemical cleaning, repair/overhauling, metal buildup and machining, change of consumables like spindles/seats/gate/ball/disc, pressure testing as per testing procedure, painting, preservation, regutting as per location drawing along with QC clearance. All services and material to be provided by the Firm.Up to 1" (Inch)
Globe Valve.Degutting from system, tallying, plastic caps for ends, transportation to shop floor/ workshop, chemical cleaning, repair/overhauling, metal buildup and machining, change of consumables like spindles/seats/gate/ball/disc, pressure testing as per testing procedure, painting, preservation, regutting as per location drawing along with QC clearance. All services and material to be provided by the Firm.Greater than 1" up to 2"(Inch)
Globe Valve.Degutting from system, tallying, plastic caps for ends, transportation to shop floor/ workshop, chemical cleaning, repair/overhauling, metal buildup and machining, change of consumables like spindles/seats/gate/ball/disc, pressure testing as per testing procedure, painting, preservation, regutting as per location drawing along with QC clearance. All services and material to be provided by the Firm.Greater than 2" up to 3"(Inch)
Globe Valve.Degutting from system, tallying, plastic caps for ends, transportation to shop floor/ workshop, chemical cleaning, repair/overhauling, metal buildup and machining, change of consumables like spindles/seats/gate/ball/disc, pressure testing as per testing procedure, painting, preservation, regutting as per location drawing along with QC clearance. All services and material to be provided by the Firm.Greater than 3" up to 4"(Inch)
Globe Valve.Degutting from system, tallying, plastic caps for ends, transportation to shop floor/ workshop, chemical cleaning, repair/overhauling, metal buildup and machining, change of consumables like spindles/seats/gate/ball/disc, pressure testing as per testing procedure, painting, preservation, regutting as per location drawing along with QC clearance. All services and material to be provided by the Firm.Greater than 4" up to 5"(Inch)
Globe Valve.Degutting from system, tallying, plastic caps for ends, transportation to shop floor/ workshop, chemical cleaning, repair/overhauling, metal buildup and machining, change of consumables like spindles/seats/gate/ball/disc, pressure testing as per testing procedure, painting, preservation, regutting as per location drawing along with QC clearance. All services and material to be provided by the Firm.Greater than 5" up to 6"(Inch)
Diaphram Valve.Degutting from system, tallying, plastic caps for ends, transportation to shop floor/ workshop, chemical cleaning, repair/overhauling, metal buildup and machining, change of consumables like spindles/seats/gate/ball/disc, pressure testing as per testing procedure, painting, preservation, regutting as per location drawing along with QC clearance. All services and material to be provided by the Firm.Greater than 4" up to 5"(Inch)
Ball Valve.Degutting from system, tallying, plastic caps for ends, transportation to shop floor/ workshop, chemical cleaning, repair/overhauling, metal buildup and machining, change of consumables like spindles/seats/gate/ball/disc, pressure testing as per testing procedure, painting, preservation, regutting as per location drawing along with QC clearance. All services and material to be provided by the Firm.Greater than 1" up to 2"(Inch)
Cock Valve.Degutting from system, tallying, plastic caps for ends, transportation to shop floor/ workshop, chemical cleaning, repair/overhauling, metal buildup and machining, change of consumables like spindles/seats/gate/ball/disc, pressure testing as per testing procedure, painting, preservation, regutting as per location drawing along with QC clearance. All services and material to be provided by the Firm.Greater than 1" up to 2"(Inch)
Cock Valve.Degutting from system, tallying, plastic caps for ends, transportation to shop floor/ workshop, chemical cleaning, repair/overhauling, metal buildup and machining, change of consumables like spindles/seats/gate/ball/disc, pressure testing as per testing procedure, painting, preservation, regutting as per location drawing along with QC clearance. All services and material to be provided by the Firm.Greater than 2" up to 3"(Inch)
Cock Valve.Degutting from system, tallying, plastic caps for ends, transportation to shop floor/ workshop, chemical cleaning, repair/overhauling, metal buildup and machining, change of consumables like spindles/seats/gate/ball/disc, pressure testing as per testing procedure, painting, preservation, regutting as per location drawing along with QC clearance. All services and material to be provided by the Firm.Greater than 3" up to 4"(Inch)
Cock Valve.Degutting from system, tallying, plastic caps for ends, transportation to shop floor/ workshop, chemical cleaning, repair/overhauling, metal buildup and machining, change of consumables like spindles/seats/gate/ball/disc, pressure testing as per testing procedure, painting, preservation, regutting as per location drawing along with QC clearance. All services and material to be provided by the Firm.Greater than 5" up to 6"(Inch)
Cock Valve.Degutting from system, tallying, plastic caps for ends, transportation to shop floor/ workshop, chemical cleaning, repair/overhauling, metal buildup and machining, change of consumables like spindles/seats/gate/ball/disc, pressure testing as per testing procedure, painting, preservation, regutting as per location drawing along with QC clearance. All services and material to be provided by the Firm.Greater than 7" up to 8"(Inch)
Disc Valve.Degutting from system, tallying, plastic caps for ends, transportation to shop floor/ workshop, chemical cleaning, repair/overhauling, metal buildup and machining, change of consumables like spindles/seats/gate/ball/disc, pressure testing as per testing procedure, painting, preservation, regutting as per location drawing along with QC clearance. All services and material to be provided by the Firm.Greater than 2" up to 3"(Inch)
Disc Valve.Degutting from system, tallying, plastic caps for ends, transportation to shop floor/ workshop, chemical cleaning, repair/overhauling, metal buildup and machining, change of consumables like spindles/seats/gate/ball/disc, pressure testing as per testing procedure, painting, preservation, regutting as per location drawing along with QC clearance. All services and material to be provided by the Firm.Greater than 4" up to 5"(Inch)
Relief Valve.Degutting from system, tallying, plastic caps for ends, transportation to shop floor/ workshop, chemical cleaning, repair/overhauling, metal buildup and machining, change of consumables like spindles/seats/gate/ball/disc, pressure testing as per testing procedure, painting, preservation, regutting as per location drawing along with QC clearance. All services and material to be provided by the Firm.Up to 1" (Inch)
Relief Valve.Degutting from system, tallying, plastic caps for ends, transportation to shop floor/ workshop, chemical cleaning, repair/overhauling, metal buildup and machining, change of consumables like spindles/seats/gate/ball/disc, pressure testing as per testing procedure, painting, preservation, regutting as per location drawing along with QC clearance. All services and material to be provided by the Firm.Greater than 1" up to 2"(Inch)
Relief Valve.Degutting from system, tallying, plastic caps for ends, transportation to shop floor/ workshop, chemical cleaning, repair/overhauling, metal buildup and machining, change of consumables like spindles/seats/gate/ball/disc, pressure testing as per testing procedure, painting, preservation, regutting as per location drawing along with QC clearance. All services and material to be provided by the Firm.Greater than 2" up to 3"(Inch)
Relief Valve.Degutting from system, tallying, plastic caps for ends, transportation to shop floor/ workshop, chemical cleaning, repair/overhauling, metal buildup and machining, change of consumables like spindles/seats/gate/ball/disc, pressure testing as per testing procedure, painting, preservation, regutting as per location drawing along with QC clearance. All services and material to be provided by the Firm.Greater than 4" up to 5"(Inch)
Screwdown Valve.Degutting from system, tallying, plastic caps for ends, transportation to shop floor/ workshop, chemical cleaning, repair/overhauling, metal buildup and machining, change of consumables like spindles/seats/gate/ball/disc, pressure testing as per testing procedure, painting, preservation, regutting as per location drawing along with QC clearance. All services and material to be provided by the Firm.Up to 1" (Inch)
Screwdown Valve.Degutting from system, tallying, plastic caps for ends, transportation to shop floor/ workshop, chemical cleaning, repair/overhauling, metal buildup and machining, change of consumables like spindles/seats/gate/ball/disc, pressure testing as per testing procedure, painting, preservation, regutting as per location drawing along with QC clearance. All services and material to be provided by the Firm.Greater than 7" up to 8"(Inch)
Reducers.Degutting from system, tallying, plastic caps for ends, transportation to shop floor/ workshop, chemical cleaning, repair/overhauling, metal buildup and machining, change of consumables like spindles/seats/gate/ball/disc, pressure testing as per testing procedure, painting, preservation, regutting as per location drawing along with QC clearance. All services and material to be provided by the Firm.Greater than 3" up to 4"(Inch)
avisan engineering enterprises
ASHA ENGINEERING WORKS
Sadhav Offshore Engineering Company
YEOMAN MARINE SERVICES PVT. LTD.
Trinitech Infrastructure (India) Private Limited
Marine Corporation of India, Prop Anand Ship Care Institute Pvt Ltd
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .