Loading…
Loading…
Tender Value
₹6.6 Cr
EMD Value
₹2 L
Closing Date
31 Jul 2026, 2:00 pmClosed
The Superintending Engineer
O/o the SE, Bridges South Circle, Alappuzha
General civil worjk
2025_PWD_789367_4
PWD/BR/TR/108036/2021_5_1_1/1
Open Tender
Civil Works - Bridges
Item Rate
547 days
Thiruvananthapuram
Please refer Tender documents.
16 documents required · 16 mandatory
₹13,010
Yes
₹2 L
Yes
21 Jul 2026
21 Jul 2026
3 Aug 2026
21 Jul 2026
31 Jul 2026
21 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1App A - BRIDGE PROPER | |||||
| 1.001 | 12.1.B.1:Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. Ordinary Soil - Depth upto 3m - Mechanical Means | - | cum | - | - |
| 1.002 | 12.1.B.2:Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, removal of stumps and other deleterious matter, only for dressing of sides and bottom and backfilling with approved material. <br> Ordinary Soil - Depth 3 M to 6 M- Mechanical Means<br> | - | cum | - | - |
| 1.003 | 12.1.2.B:Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material.<br> Ordinary Rock (not requiring blasting ) - Depth up to 3 m - Mechanical Means <br> | 1 | cum | - | - |
| 1.004 | 12.1.4.A:Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. Hard Rock ( blasting prohibited) - Mechanical Means | - | cum | - | - |
| 1.005 | 12.8.D.2:Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications <br> PCC Grade M25 - With Batching Plant, Transit Mixer and Concrete Pump - (Without Formwork) <br> | 1 | cum | - | - |
| 1.006 | 12.9.A:Providing and Constructing Temporary Island 16 m diameter for Construction of Well Foundation. Assuming depth of water 1.0 m and height of island to be 1.25 m.<br> For 8 m dia Well | - | no | - | - |
| 1.007 | 12.9.C:Providing and constructing one span service road to reach island location from one pier location to another pier location | - | metre | - | - |
| 1.008 | 12.8.G.2.1:Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications. RCC Grade M30 - Using Batching Plant, Transit Mixer and Concrete Pump | - | cum | - | - |
| 1.009 | 12.8.E.2.1:Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications. <br> RCC Grade M25 - With Batching Plant, Transit Mixer and Concrete Pump <br> | - | cum | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
PDF • 0.05 MB
BOQ_1457199.xls
BOQ • 0.35 MB
IntegrityPact.pdf
Other Document • 0.34 MB
ep.pdf
Other Document • 0.01 MB
Preliminary.pdf
Additional Documents • 0.25 MB
affidavit.pdf
Additional Documents • 0.10 MB
FOT.pdf
Additional Documents • 0.06 MB
viewsbd.pdf
Tender Documents • 2.56 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .