Loading…
Loading…
Tender Value
₹10.0 L
EMD Value
₹20,012
Closing Date
29 Sept 2026, 2:00 pm2d left
DFO
J.V Baramulla
Development of Evicted areas by way of Barbed wire fencing in compartment 34 Boniyar,4 Hamal,5 Hamal and 4a Baramulla
2026_FD_325501_1
NIT No. 09 of 2026-27 Dated 21-09-2026
Open Tender
Agricultural or Forestry
Percentage
30 days
Boniyar
Please refer Tender documents.
2 documents required · 2 mandatory
₹600
0406-Forest
₹20,012
Yes
21 Sept 2026
21 Sept 2026
30 Sept 2026
21 Sept 2026
29 Sept 2026
21 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed: All kinds of soil :Block for angle iron posts @ 8feet c/c | 29.78 | cum | 479.3 | ₹14,273.55 |
| 2 | P/L of stone soling incl. ramming,hand packing and all carriages, complete job in room fill,trenches,foundation etc. excavated earth as directed: All kinds of soil :Block for angle iron posts @ 8feet c/c | 6.17 | cum | 1,250 | ₹7,712.5 |
| 3 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size). Block for angle iron posts @ 8feet c/c | 22.53 | cum | 5,733.6 | ₹1,29,178.01 |
| 4 | Structural steel work in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete.welded. ISA45x45x4@ 2.7kg/m | 4,044.03 | sqm | 138.2 | ₹5,58,884.95 |
| 5 | Fencing with angle iron post placed at required distance embedded in cement concrete blocks, every 15th post, last but one end post and corner post shall be strutted on both sides and end post on one side only and provided with horizontal lines and two diagonals interwoven with horizontal wires, of barbed wire weighing 9.38 kg per 100 m (minimum), between the two posts fitted and fixed with G.I. staples, turn buckles etc. complete. (Cost of posts, struts, earth work and concrete work to be paid for separately). Payment to be made per meter cost of total length of barbed wire used. With G.I. barbed wire | 11,067.84 | Rmt | 19.85 | ₹2,19,696.62 |
| 6 | Painting with synthetic enamel paint of approved brand and manufacture to give an even shade. Two or more coats on new work | 206.84 | sqm | 129.05 | ₹26,692.7 |
| 7 | Carriage of different materials by mechanical transport incl. head load for stacking at site 17 km Sand | 3.63 | cum | 370.67 | ₹1,345.53 |
| 8 | Steel | 1.4 | mt | 329.44 | ₹461.22 |
| 9 | Cement | 1.74 | mt | 329.44 | ₹573.23 |
| 10 | Aggregate | 7.24 | cum | 402.95 | ₹2,917.36 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.93 MB
BOQ_1100196.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .