Loading…
Loading…
Tender ID
Tender Value
₹1.7 L
EMD Value
₹3,440
Closing Date
30 Mar 2026, 4:00 pmClosed
exen r and b div rafiabad
office of xen r and b div rafiabad
Construction of Toilet Girls Primary School Nadihal
2026_PWDJK_306543_1
e nit 88 of 2025-26 dated 20-03-2026
Open Tender
Civil Works
Percentage
30 days
Rafiabad
NIT
2 documents required · 2 mandatory
₹200
exen r and b div rafiabad
₹3,440
20 Mar 2026
20 Mar 2026
30 Mar 2026
20 Mar 2026
30 Mar 2026
20 Mar 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 2 | Earth work in excavation by Manual/mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 metres2.9.1 All kinds of soil : | 4.94 | cum | 256.85 | ₹1,268.84 |
| 3 | P/L of dry stone soling duly hand packed including all carriages loading unloading complete job before laying of mud mate in trenches incl. all carriages of material involved & head load. | 1.35 | cum | 1,000 | ₹1,350 |
| 4 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) | 0.53 | cum | 5,202.9 | ₹2,757.54 |
| 5 | Reinforced cement concrete work in beams, suspended floors, roofs having slope upto 15°, landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases upto five level including curing but excluding the cost of centring, shuttering, finishing and reinforcement with
5.3.1 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) | - | cum | 9,821.85 | - |
| 6 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 4.4.5 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) | - | cum | 5,733.6 | - |
| 7 | Centring and shuttering including strutting proping and removal of form work for foundations, footings, bases of columns slabs etc for mass concrete. | - | sqm | 286.85 | - |
| 8 | Centring and shuttering including strutting proping and removal of form work for foundations, footings, bases of columns slabs etc for mass concrete. | - | sqm | 718.2 | - |
| 9Reinforcement for RCC works including straightening cutting bending placing in position and binding all complete (Thermomechanically Treated Bars) Incl. carraige and head load | |||||
| 10Brick work with common burnt clay (non-modular) bricks of class designation 7.5 in foundation and plinth including curing in : sand) 6.1.5 Cement mortar 1:6 ( 1 cement : 6 coarse sand)Extra for brick work with common burnt clay bricks/cement concrete bricks in superstructure above plinth level upto floor five level | |||||
| 11Structural steel work welded in built up sections and frame work including cutting, hoisting fixing in position all complete in angles / flats / tubes etc. including fixing of 2mm thick MS sheets in Door shutters including ms frame work.incl cost of steel primer and Paint complete | |||||
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.24 MB
BOQ_995281.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .