Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
| 3 | Admitted-Finance 22 1 48 1 CHENGALARAOPETA BEACH ROAD VISAKHAPATNAM ANDHRA PRADESH 530001 | VISAKHAPATANAM | ANDHRA PRADESH | 530001 | Admitted-Finance |
| 4 | Admitted-Finance PLOT NO 4B SURVEY NO 237 3P INDUSTRIAL PARK VAKALAPUDI KAKINADA EAST GODAVARI ANDHRA PRADESH 533005 | KAKINADA | ANDHRA PRADESH | 533005 | Admitted-Finance |
| 5 | Admitted-Finance | Admitted-Finance |
Tender Value
Refer Docs
Closing Date
14 Dec 2022, 11:00 amClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Manager SRC-OS
Hindustan Shipyard Limited Gandhigram SR Complex Visakhapatnam 530 005
Removal and Reinstallation of Draw Works System on MODU SAGAR BHUSHAN
2022_HSL_91695_1
20 / 22005 / Draw Works / 153 / 2022-23
Open Tender
Miscellaneous Services
Service
20 days
HSL Visakhapatnam
Please refer Tender documents.
7 documents required · 7 mandatory
₹0
Exempted
23 Dec 2022
3 Dec 2022
14 Dec 2022
3 Dec 2022
14 Dec 2022
3 Dec 2022
Amount
Removal & Re-Installation of Draw Works - 01LS
Entire Draw works system to be removed, shifted to jetty from Rig floor, secured all parts as per NOV Service Engineer requirements and load on Truck / Trailer and secured with metal strips and locking slings. Draw Works Skid to be cleaned and inspected, DP and MPI tests to be carried out as per NOV requirements, eye pads manufactured and installations to be carried out. Gear box oil to be collected in empty barrels. Draw works after overhauled by NOV, same unit to be unloaded from Truck / Trailer, shifted to onboard, fitted in position, alignment to be carried out in presence of NOV Service Engineer. New gear box oil to be filled. Trials to be showed to ship staff. For above works all necessary obstructions to be degutted and re-gutted. All certified tools and shackles, slings, consumables covered in contractor scope. All maching works, gas cutting works, welding works are covered in Contractor's Scope.
RAO ELECTRICAL ENGINEERIONG WORKS
M/s Kalyani Marine And Industrial Engineers
SRISAI OILFIELD EQUIPMENTS AND MARINE SERVICES PVT LTD
SRI SRINIVASA ENGINEERING WORKS
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .