Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | H1₹1Accepted-AOC | ₹1 Quoted ₹4 | H1 | Accepted-AOC H1 |
| 2 | H2₹3.06−₹0.94 (23.5%)Rejected-AOC | ₹3.06−₹0.94 (23.5%) | H2 | Rejected-AOC H2 |
| 3 | Rejected-Technical A 15 PAMPOSH ENCLAVE GREATER KAILASH 1 NEW DELHI 110048 | - | - | Rejected-Technical Not Qualified |
| Sl No | Description | Qty | Unit | INI Design Studio Private Ltd L1 | Edifice Consultants Pvt. Ltd., L2 |
|---|---|---|---|---|---|
| 100.00 | Comprehensive Architectural services (Other than detailed interior and furniture layout)
Fee in percentage (%) of the total cost of construction
(Please note that the cost of construction on which this percentage fee will be calculated will be exclusive of GST.) | 1 | Percentage | 3.06 ₹3.06 Lowest | 4 ₹4 |
| 200.00 | Architectural fees for detailed interior and furniture layout.
Fee in percentage (%) of the total cost of construction
(Please note that the cost of construction on which this percentage fee will be calculated will be exclusive of GST.) | 1 | Percentage | 2.7 ₹2.7 Lowest | 4 ₹4 |
| 300.00Note : 1. The total percentage as per above shall be considered for further evaluation and qualification. 2. IIMA reserves the right to separate the interior design (Furniture and furnishings) work from this scope and award it to a separate agency. | |||||
Tender Value
Refer Docs
EMD Value
₹15 L
Closing Date
6 Nov 2025, 3:00 pmClosed
CAO
IIM Ahmedabad, Sargam Marg, Vastrapur, Ahmedabad-380015
Selection of Architect/Design firm for the comprehensive design and subsequent reconstruction of student housing and allied or ancillary buildings at Main Campus IIM Ahmedabad
2025_IIMA_879116_1
IIMA/Contracts/TS-35/2025-26
Open Tender
Consultancy
Item Rate
IIM Ahmedabad
As per NIT
8 documents required · 8 mandatory
₹0
₹15 L
Offline at IIM Ahmedabad /Online via Zoom platform
9 Jun 2026
25 Sept 2025
7 Nov 2025
25 Sept 2025
6 Nov 2025
10 Oct 2025
25 Sept 2025 - 7 Oct 2025
7 Oct 2025
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 100 | Comprehensive Architectural services (Other than detailed interior and furniture layout)
Fee in percentage (%) of the total cost of construction
(Please note that the cost of construction on which this percentage fee will be calculated will be exclusive of GST.) | 1 | Percentage | 1 | ₹1 |
| 200 | Architectural fees for detailed interior and furniture layout.
Fee in percentage (%) of the total cost of construction
(Please note that the cost of construction on which this percentage fee will be calculated will be exclusive of GST.) | 1 | Percentage | 1 | ₹1 |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
PDF • 0.52 MB
Annexure-A.pdf
Tender Documents • 0.16 MB
Annexure-B.pdf
Tender Documents • 0.22 MB
Annexure-C.pdf
Tender Documents • 0.09 MB
IntegrityPact.pdf
Tender Documents • 0.24 MB
Annexure-H.pdf
Tender Documents • 0.07 MB
Annexure-I.pdf
Tender Documents • 0.08 MB
Annexure-J.pdf
Tender Documents • 0.09 MB
BOQ_924047.xls
BOQ • 0.31 MB
Annexure-D.pdf
Tender Documents • 0.12 MB
Annexure-E.pdf
Tender Documents • 0.65 MB
Annexure-F.pdf
Tender Documents • 0.08 MB
Annexure-G.pdf
Tender Documents • 0.18 MB
Corrigendum-1.pdf
PDF • 0.39 MB
Corrig_Dateextension.pdf
PDF • 0.17 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .