Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance PLOT NO 4B SURVEY NO 237 3P INDUSTRIAL PARK VAKALAPUDI KAKINADA EAST GODAVARI ANDHRA PRADESH 533005 | KAKINADA | ANDHRA PRADESH | 533005 | Admitted-Finance |
| 3 | Admitted-Finance | Admitted-Finance |
| 4 | Rejected-Technical | Rejected-Technical Technically Unsuitable |
Tender Value
Refer Docs
EMD Value
₹25,000
Closing Date
11 Oct 2021, 11:00 amClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Manager SRC-Com
Hindustan Shipyard Limited Gandhigram SR Complex Visakhapatnam 530 005
Modification works of Stern wedge, Provision of ducktail, Rudder bottom plate, Bilge keel, Sonar Dome on INS KAVARATTI
2021_HSL_87587_1
20/21998/100/2021-22
Open Tender
Miscellaneous Services
Service
25 days
HSL Visakhapatnam
Please refer Tender documents.
8 documents required · 8 mandatory
₹525
Yes
HSL
₹25,000
Yes
13 Oct 2021
30 Sept 2021
11 Oct 2021
30 Sept 2021
11 Oct 2021
30 Sept 2021
120 days
Amount
Modification of Stern Wedge & Provision of Ducktail a) The Existing transom portion of Stern wedge (Fr.83 to Transom; below Dk.3) to be cut and removed and new Ducktail structure as per drawing to be fabricated and fitted (Aprrox. Weight 10 Tons). b) Existing bottom shell sloping downward towards aft. (Stern Wedge) shall be cut and all transverse frames and girders aft of Fr. 83 shall be truncated up to new bottom shell sloping upward at 10 deg from base line. c) The Ducktail shall be fabricated as a separate tank structure and welded to transom such that its bottom plate is flush/co-planer with new bottom shell plating. Skid preparation to be made for the fabrication. d) The Ducktail shall undergo APT post installation. e) Degaussing conduit (MS Pipe, 125 NB, 4.85 mm thickness) shall be degutted aft of Fr. 82 (lying below Dk-3) on both P&S (Aprrox. 10 RMT). The degaussing cables will be removed by HSL beforehand from heat affected area. New conduit of same material of approximately 10 m total length shall be required to be installed in affected area. The fitment of new conduit shall be undertaken 'suit at sight' while maintaining the sufficient clearance from the bottom shell.
Note: Since there is extensive hot work in Aft cut-up area, suitable temporary structural members to be provided to prevent structural distortions. Measuring deflection on account of hot-work to be monitor.
Modification of Rudder bottom plate: a) The existing flat rudder bottom plate to be removed and fitted with new streamlined canopy made up of "cast material" (Approx weight 0.6 Tons). Drain plug provided in the existing flat bottom plate is to provisioned in the cast canopy. Canopy will be welded to rudder shell plates (using backing bar) in place of rudder bottom plate as per drawing. The Casted Canopy will be provided by HSL, however welders are to be qualified for established WPS & PQR. Welders Qualification is under Contractors Scope. b) APT of both the rudders is to be carried out on post fitment of new casted bottom canopy. Suitable Electrodes for Welding Cast Canopy with Existing DMR 249 A Structure is under Contractors Scope; however, electrode specifications will be given by HSL. Modification in Skeg Aft Portion: a) Existing Skeg Aft end is flat and blunt ,which will be degutted from Fr. 71 to Fr.74 and new streamlined /tapering towards aft shall be fitted (Approx. weight 1 Ton). The detail drawing shall be provided for fabrication. b) APT of Skeg and APT of Tanks (06 Nos) i.w.o Skeg to be carried out on post completion of renewal.
Modification in Fwd. Bilge Keel (P&S) Area: a) The existing Fwd. bilge keel fitted on pad plates with the shell shall be cut and removed leaving the pad plate welded to the shell plate intact. The weld remnants in way of cutting and the edge of pad pieces to be faired by grinding flush to ensure smooth out hull surface to the extent possible, in order to minimise flow disturbances. b) New realigned bilge keel and pad plates to be fabricated & installed on shell as per drawings at the revised location at approximately Port: Fr.23 to Fr.39.5 & above BL 0.77-1.93 m and Stbd. Fr.23 to Fr.41.5 & above BL 0.77-1.93 m (Approx weight 03 Tons). The girth/offset/detail drawings shall be provided for fabrication and installation. NDT (DPT/Hose Test) shall be carried out at affected areas. DPT/Hose Test is under Contractors Scope. c) APT of Bilge Keel (P & S) and APT of Tanks (08 Nos) i.w.o of Bilge keel to be carried out post completion of hot works on Bilge Keel structure. New drain plugs are to installed. d) For relocation of ICCP Anode (02 Nos) i.w.o. new Bilge Keel (P&S), Cofferdam is to be relocated above by approximately 1256 mm above along the girth on same frame. APT of ICCP Anode Cofferdam (P&S) (02 Nos) to be undertaken post reinstallation. Blanking of shell opening (Size 300 x 300 mm) and necessary NDT (DPT) & hose test to be done.
Modification in Aft. of Sonar Dome: Hull Structure: a) The existing steel transition structure (Fr. 9 to Fr.12) shall be degutted and renewed with new steel transition structure (Approx weight 06 Tons). Detailed drawing shall be provided for fabrication and fitment. New drain plugs are to be installed. b) APT of Aft Sonar dome structure and APT of tanks (2 Nos) i.w.o Aft of Sonar Dome to be carried out post completion of Transition Piece structure.
VENKATESWARA ENGINEERING WORKS
SRISAI OILFIELD EQUIPMENTS AND MARINE SERVICES PVT LTD
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .