| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.1 LAccepted-AOC LSGD VALLIKKUNNU TIRURANGADI | KANNUR | KERALA | 670612 | L1 | Accepted-AOC L1 | |
| 2 | L2₹5.2 L+₹10,168 (2.00%)Rejected-Finance | L2 | Rejected-Finance L2 |
Tender Value
₹5.1 L
EMD Value
₹12,711
Closing Date
6 Mar 2025, 5:00 pmClosed
AE,LID AND EW, PERUMANNA GP, KOZHIKODE
AE,LID AND EW, PERUMANNA GP, KOZHIKODE
159/24-25 WELL FOR PERUMANNA SUBCENTRE AT PERUMANNA GP
2025_LSGD_742474_1
AE/LSGD/PMN/24-25/T11
Open Tender
Civil Works - Others
Item Rate
240 days
PERUMANNA GP, KOZHIKODE
Please refer Tender documents.
10 documents required · 10 mandatory
₹1,125
Yes
₹12,711
Yes
23 Mar 2025
27 Feb 2025
7 Mar 2025
27 Feb 2025
6 Mar 2025
27 Feb 2025
Amount
well construction
2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil
OD259457/2024-2025:Earth work excaation &Extra for every additional lift 1.5m or part there of in excavation/nanking excavated or stacked materials.All kind of soil(first depth)
OD259458/2024-2025:Earth work excaation & Extra for every additional lift 1.5m or part there of in excavation/nanking excavated or stacked materials.All kind of soil(second depth)
OD259408/2024-2025:Earth work excaation & Extra for every additional lift 1.5m or part there of in excavation/nanking excavated or stacked materials.All kind of soil(third depth)
OD259407/2024-2025:Earth work excaation & Extra for every additional lift 1.5m or part there of in excavation/nanking excavated or stacked materials.All kind of soil(fourth depth)
OD259422/2024-2025:Earth work excaation & Extra for every additional lift 1.5m or part there of in excavation/nanking excavated or stacked materials.All kind of soil(fifth depth)
OD259436/2024-2025:Earth work excaation & Extra for every additional lift 1.5m or part there of in excavation/nanking excavated or stacked materials.All kind of soil(sixth depth)
OD259453/2024-2025:Earth work excaation & Extra for every additional lift 1.5m or part there of in excavation/nanking excavated or stacked materials.All kind of soil(seventh depth)
5.9.12:Centering and shuttering including strutting, etc. and removal of form for:Well steining
5.7:Reinforced cement concrete work in well - steining excluding the cost of centering, shuttering, finishing and reinforcement, with 1:1.5:3 (1 cement : 1.5 coarse sand (Zone - III) : 3 graded stone aggregate 20 mm nominal size)
OD308055/2024-2025:Well steining:Laterite masonry with neatly dressed laterite stone of size 40X20X15cm or nearest size in cement mortar 1:6 for foundation and basement including all cost of materials, labour charges etc.(MODIFIED OD 50.6.7.1)
2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil
50.6.7.2:Laterate masonry with neatly dressed laterate stone of size 40x20x15cm or nearest size in cement mortar 1:6 for super structure above plinth level up to floor two level including all cost of materials, labour charges etc.
50.2.3.1:Pumping or Bailing out water and removing slush etc by using pump set including cost of labour, oil hire charges of pumpset, etc complete
5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more
4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 20 mm nominal size)
50.10.2:Steel work for purlin/single section with G I pipes including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer, including welding and bolted with special shaped washers etc. complete
13.4.1:12 mm cement plaster of mix:1:4 ( 1 cement : 4 coarse sand)
OD308744/2024-2025:Supplying and fixing pulley 100mm diameter
10.25.2:Item Shifted to Sub head 14 as item 14.73 Item Shifted to head 14 as item 14.74 Steel work welded in built up sections/framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required.In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works
K.P UDAYAKUMAR (BID ID -2141523)
Bidder Name
K.P UDAYAKUMAR
VYSHAKH K
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .