| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.4 LAccepted-AOC | L1 | Accepted-AOC Technically Qualified | |
| 2 | Not Admitted-Finance | - | Not Admitted-Finance Not qualified for AOC | |
| 3 | Not Admitted-Finance | - | Not Admitted-Finance Not qualified for AOC | |
| 4 | Not Admitted-Finance | - | Not Admitted-Finance Not qualified for AOC |
Tender Value
Refer Docs
EMD Value
₹30,464
Closing Date
27 Nov 2024, 4:00 pmClosed
The Director, ICAR-CPCRI, Kasaragod
The Director, ICAR-CPCRI, Kasaragod
Providing and fixing additional setting of scaffolding to the coconut palm for inspection of crown of coconut palm at ICAR- CPCRI Kasaragod
2024_DARE_835729_1
Scaffolding to the coconut palm
Open Tender
Civil Works
Lump-sum
45 days
ICAR- Central Plantation Crops Research Institute
As per the tender document
8 documents required · 8 mandatory
₹0
₹30,464
Yes
9 Dec 2024
21 Nov 2024
28 Nov 2024
21 Nov 2024
27 Nov 2024
21 Nov 2024
Amount
Laying and Jointing PVC Pipe. Heading
Providing and fixing Additional double scaffolding system (cup lock type) to the existing Rows of coconut palm 20Mx1.2M and 2 nos of cross raws of 5Mx1.2M for inspection purpose) up to seven story height including hand rails with a height of one Meter made with 40 mm dia M.S. tube 1.5 m centre to centre, horizontal & vertical and cross tubes joining with cup & lock system with M.S. tubes, M.S. tube challies, M.S. clamps in the scaffolding for inspection platform for research work of coconut plam etc. and maintaining it in a serviceable condition for one year duration as directed. The scaffolding system shall be stiffened with bracings, runners, connection etc wherever required for inspection of work at required locations for coconuts palm inspection complete as per directions and approval of Scientist in charge .The elevation area of the scaffolding shall be measured for payment purpose and cost of M.S Pipe clamps and all material related to scaffolding work are included. . detailed lay out is attached as annex -1 ( for foundation ,Earth work And concrete, payment will paid separately excluding clamp
Providing and fixing G.I Work in built up section ( square or rectangular hollow tube etc) platform frame work etc using Approved section The rate shall include cost and conveyance of all materials, fabrication, cutting welding grinding, drilling, hoisting transportation etc. complete as directed G.I tubes
Providing and fixing of 3 mm thick M.S chequered plate in landing plat form by welding revetting or bolting etc
Earth work in excavation in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m All kinds of soil
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level 1:2:4 (1 cement : 2 coarse sand (zone-III) derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources
Finishing with Epoxy paint (two or more coats) at all locations prepared and applied as per manufacturer’s specifications including appropriate priming coat, preparation of surface, etc. complete. On steel work
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .