Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical/Finance 13 L K ROAD KOEL OFF BOMBAY POONA ROAD KIRKEE PUNE MAHARASHTRA 411003 INDIA | PUNE | MAHARASHTRA | 411003 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | Admitted-Fee/PreQual/Technical/Finance PLOT NO 18 G I D C INDUSTRIAL ESTATE SAVLI ALINDRA VADODARA GUJARAT 391775 | VADODARA | GUJARAT | 391775 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
Refer Docs
EMD Value
₹3.8 L
Closing Date
10 Sept 2020, 10:00 amClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
ASD
NAVAL DOCKYARD VISAKHAPATNAM, PIN 530014
TENDER ENQUIRY FOR REPAIR / RENEWAL / ROUTINES AND DEFECT RECTIFICATION OF MAIN ENGINE/GEAR BOX AND CPP CONTROLS SYSTEM- IN SHIP
2020_NAVY_368658_1
COM/OFF/MCD/19-20/745
Limited
Marine Services
Turn-key
140 days
NAVAL DOCKYARD VISAKHAPATNAM
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹3.8 L
Yes
11 Sept 2020
13 Aug 2020
11 Sept 2020
13 Aug 2020
10 Sept 2020
13 Aug 2020
13 Aug 2020 - 27 Aug 2020
180 days
REPAIR / RENEWAL / ROUTINES AND DEFECT RECTIFICATION OF MAIN ENGINE/GEAR BOX AND CPP CONTROLS SYSTEM.Reducers in pneumatic circuit malfunctioning. Reducers to be overhauled and proved. Set pressure 30 to 07 bar.
REPAIR / RENEWAL / ROUTINES AND DEFECT RECTIFICATION OF MAIN ENGINE/GEAR BOX AND CPP CONTROLS SYSTEM.Overhauling of ME 7 bar supply air pressure panel
REPAIR / RENEWAL / ROUTINES AND DEFECT RECTIFICATION OF MAIN ENGINE/GEAR BOX AND CPP CONTROLS SYSTEM.ME Local pressure gauges calibration
REPAIR / RENEWAL / ROUTINES AND DEFECT RECTIFICATION OF MAIN ENGINE/GEAR BOX AND CPP CONTROLS SYSTEM.Following instrumentation to be calibrated along with sensors and to be replaced if found defective : (a) RPM gauges with pick up sensors. Range 0 to 35000 rpm (b) Engine RPM gauges with pick up sensors, Range 0 to 1250 rpm (c) Shaft RPM gauges with pick up sensors, Range 0 to 350 rpm (d) Fuel rack gauges, Range 0 to 35 mm (e)Temperature gauges - 20, Range 0 to 150 deg c (f)Pressure transmitters with sensors 0 - 10 bar (g) Pressure transmitters with sensors 0 - 6 bar (h) Pressure transmitters with sensors 0 - 4 bar (i) Pressure transmitters with sensors 0 - 40 bar (j) Pressure transmitters with sensors 0 - 50 bar (k) Pressure trnsmitters with sensors 0 - 160 bar (l) Temperature Indicators with transmitter 0 - 100 deg C (m) Temperature transmitter 0 - 150 deg C (n) Temperature gauges 0 - 120 deg C (o) Temperature scanners with 16 thermocouples each. (p) Level Switches with floats. (q) Engine bearing temperature indication panel 4-20 mA (r) Pressure gauges (Bourdon type), Range 0 to 160 bar (s) Suction Gauges -1 to 3 bar (t) PT 100 sensors (u) Pneumatic air distributors in LCP Pneumatic Engraved circuit
REPAIR / RENEWAL / ROUTINES AND DEFECT RECTIFICATION OF MAIN ENGINE/GEAR BOX AND CPP CONTROLS SYSTEM.Both Main Engines Sensors, Cards and safeties Calibration of Main Engine Safeties. ME Safeties:- 1. Emergency Stop 2. Over speed 3. ME Lube oil pressure very low 4. ME FW temp very high 4. ME LO temp. very high 5. GB LO pressure very low 7. ME FW tank level very Low Check & Calibrate ME PMS Rack PCB's 1. ICM1 & ICM 2 card 2. RGM card 3. ACM card 4. SVAE Card 5. SEUIL Card 6. SPH card 7. FRM card 8. VTM Card 9. 24-24 VDC & 24-15VDC PCB
REPAIR / RENEWAL / ROUTINES AND DEFECT RECTIFICATION OF MAIN ENGINE/GEAR BOX AND CPP CONTROLS SYSTEM.Checking of ME Starting Interlocks Checking of ME /GB Clutching interlocks
REPAIR / RENEWAL / ROUTINES AND DEFECT RECTIFICATION OF MAIN ENGINE/GEAR BOX AND CPP CONTROLS SYSTEM.Checking of MCR Signalizations 1. Fresh Water Low temperature 2. Emergency Stop 3. Lube oil priming pump ON 4. Engine Clutched 5. Engine Declutched 6. Turning gear Disengaged 7. Safeties OFF 8. Manual Handle to Zero 9. Local Control 10. MCR Control 11. Bridge Control 12. Engine Starting permitted 13. Permission to Clutch 14. Engine Running 15. Supply ON on Safety Circuit
REPAIR / RENEWAL / ROUTINES AND DEFECT RECTIFICATION OF MAIN ENGINE/GEAR BOX AND CPP CONTROLS SYSTEM.Checking of Bridge Signalizations 1. Engine Clutched 2. Bridge Control 3. MCR Control 4. Local Control 5. Zero Pitch 6. Shaft Break ON 7. Engine Running 8. Safeties OFF
REPAIR / RENEWAL / ROUTINES AND DEFECT RECTIFICATION OF MAIN ENGINE/GEAR BOX AND CPP CONTROLS SYSTEM.Checking of ME MCR Alarm system:- (a) AM-1, (b) AM-2, (c) AM-3, (d) AM-4, (e) AMB ( Bridge common port and stbd alarm)
REPAIR / RENEWAL / ROUTINES AND DEFECT RECTIFICATION OF MAIN ENGINE/GEAR BOX AND CPP CONTROLS SYSTEM.Overhauling of ME pneumatic control items. (a) ME fuel pneumatic valve – 02 nos (b) ME Staring air diaphragm valve – 02 nos (c) ME Over Speed electro-pneumatic valve. – 02 nos (d) ME Turning gear pneumatic switch. – 02 nos (e)Start/Stop Jack- 02 nos (f) Over Speed Safety slide valve ( Gestra Valve)- 02 nos
REPAIR / RENEWAL / ROUTINES AND DEFECT RECTIFICATION OF MAIN ENGINE/GEAR BOX AND CPP CONTROLS SYSTEM.Synchronisation of remote fuel rack with engine fuel rack observed mismatch. Error to be rectified.
REPAIR / RENEWAL / ROUTINES AND DEFECT RECTIFICATION OF MAIN ENGINE/GEAR BOX AND CPP CONTROLS SYSTEM."Serviceability checks of following PRV to be carried out:- (a) Main engine pneumatic system (specs - input pressure 7 bar output pressure 0 - 4 bar, qty 04) "
REPAIR / RENEWAL / ROUTINES AND DEFECT RECTIFICATION OF MAIN ENGINE/GEAR BOX AND CPP CONTROLS SYSTEM."Following components of engraved circuit board to be overhauled / calibrated for both main engines description, qty and range as specified :- (a) Solenoid (jocomatic) valve 24 v dc, qty - 16,0 - 16 bar (b) OR module qty - 04 , 0 - 10 bar (c) Pressure switches qty - 02, 0 - 10 bar (d) Needle valve qty - 04, 0 - 10 bar (e) Tank (04 litres) cleaning / pressure testing) qty - 02, wp: 07 bar, tp: 15 bar"
REPAIR / RENEWAL / ROUTINES AND DEFECT RECTIFICATION OF MAIN ENGINE/GEAR BOX AND CPP CONTROLS SYSTEM." The following to be undertaken on components of pneumatic supply frame of main engines:- (a) Overhauling of cocks, qty - 04, dia - 10 mm (b) Renewal of 02 nos filters as per sample. (c) Renewal / ultrasonic cleaning of cock with filters as per sample - qty : 04 nos (d) Overhauling / calibration / serviceability checks of or module qty 02, wp 1 -10 bar (e) Overhauling / calibration / serviceability checks of 02 nos pressure switches, range 06 bar (f) Overhauling of safety valves, qty - 02, testing pressure 10 bar (g) Overhauling of non return valves, qty - 02 (h) Cleaning and pressure testing of 02 in nos"
REPAIR / RENEWAL / ROUTINES AND DEFECT RECTIFICATION OF MAIN ENGINE/GEAR BOX AND CPP CONTROLS SYSTEM." Following to be undertaken the clutch panel (a) cleaning and pressure testing of air reservoir, qty 02, wp 8.5 bar, testing pressure 15 bar (b) Overhauling of pressure reducing station qty 01, (specs input pressure 30 bar, output pressure 805 bar) (c) Overhauling of 04 nos cocks size 15 mm (d) Overhauling of 02 nos nrv qty 02 nos (e) Overhauling and calibration of 02 nos pressure regulators.(wp 08 bar) (f) Overhauling of air distributor qty 02,wp 2 - 10 bar (g) Overhauling / calibration of pneumatic"
REPAIR / RENEWAL / ROUTINES AND DEFECT RECTIFICATION OF MAIN ENGINE/GEAR BOX AND CPP CONTROLS SYSTEM.Check all safety device checks for both main engine as per DTTT(V) check list. Ii) Offer cold and hot SDC's on BME to trials teams and QC team and prove the control circuits during FPT(sea trails).
Mandatory Spares.PRESSURE REGULATOR (5).EX.027.00.1.02
Mandatory Spares.CONVERTER MODULE (T452,T458), CHARGING AIRTEMP, F.W.TEMP.(0-100).EX.039.00.1.02
Mandatory Spares.CONVERTER MODULE (T454,T458), LUB OIL TEMP. (0-150 DEF.C).EX.040.00.1.02
Mandatory Spares.MANOMETER.EX.055.00.1.02
Mandatory Spares.PRESSURE SWITCH, SET AT 19 BAR, PF-40-W-BB-1X00-21B-10B-DB-N MAKEVERMA TRAFAG.EX..036.03.0.99
Mandatory Spares.MAGNETIC PICK UP FOR TURBOCHARGER, M12 X 1.25.E9.013.02.0.99
Mandatory Spares.PYROMETRIC DUCT.72.320.15.0.00
Mandatory Spares.FUEL RACK SENSOR 19121.74.404.02.0.00
Mandatory Spares.PNEUMATIC DISTRIBUTOR (7/1,7/2,7/3) FUEL RACK.EX.024.00.1.02
Mandatory Spares.PNEUMATIC DISTRIBUTOR (8/1,8/2,8/3,8/4) STOP, BRIDGE MCR CTRL, LOCAL REM.EX.025.00.1.02
Mandatory Spares.LEVEL SWITCH.74.272.51.0.00
Mandatory Spares.ONE WAY RESTRICTION (6/1,6/2).EX.028.00.1.02
Mandatory Spares.FLITERS (10).EX.029.00.1.02
Mandatory Spares.SENSOR.75.320.04.0.00
Mandatory Spares.SENSOR.75.320.06.0.00
Mandatory Spares.SENSOR FOR BEARING TEMP.75.352.01.0.00
MAGNETICF PICKUP SENSOR (19050).81.025.15.0.00
MAN ENERGY SOLUTIONS INDIA PRIVATE LIMITED
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .