Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-I₹20.0 LAccepted-AOC VILL CHANDPUR P O KHOUDA SUB TEHSIL TIHRA DISTT MANDI | MANDI | HIMACHAL PRADESH | 175001 | L-I | Accepted-AOC Accept | |
| 2 | L-II₹21.0 LAccepted-AOC CHIEF ENGINEER OP KANGRA ZONE HPSEBL DHARAMSHALA | KANGRA | HIMACHAL PRADESH | 175013 | L-II | Accepted-AOC Accept |
Tender Value
Refer Docs
EMD Value
₹55,265
Closing Date
12 Aug 2021, 11:00 amClosed
SE (OP) Circle HPSEBL Mandi
SE (OP) Circle HPSEBL Mandi
Estimate for Providing SOP to LWSS to Rural Water Supply Scheme Kamlah Mandap Mandap phase at Kandapattan Dharampur under ED HPSEBL Dharampur
2021_HPSEB_50028_2
8/2021-22
Open Tender
Supply and Erection
Turn-key
45 days
SE (OP) Circle HPSEBL Mandi
please refer tender document
4 documents required · 4 mandatory
₹2,950
₹55,265
18 Sept 2021
30 Jul 2021
13 Aug 2021
30 Jul 2021
12 Aug 2021
30 Jul 2021
Amount
A Cost of 11 KV HT Line
Erection of AAAC 7/4.26mm 100 mm sq.) {Includes 3 conductor lengths for 3 phase and additional 3% (sag,Jumpering wastage} (Supplied by HPSEBL).
Prov. Steel Tubular Poles (9 Mtr, working load >220kgf/m sq.)
Prov. RCC Muff with concrete filling
Cross Arm: [Channel Iron (2800x100x50x6 mm)
Angle Iron (50x50x6 mm), Length (2x750) mm
Cross Arm: [Channel Iron (460-100x50x6mm)
11 kV Pin Insulators (Porcelain, 12 kV, 10 KN): 3 No per pole structure
Belt set-MS Angle Iron: 50x50x6, length [1500 mm x 2 No.]
Disc insulators set on dead end structure (comprising 1 No. Disc: ^^(Porcelian, BS, 12 KV, 90 KN,) i/c Dead end clamps etc.) x (3 Nos. conductors) x (2 Nos. sides)
Prov. Stay set complete in all respect
Prov. Stay Wire (7/3.15 mm) (@ 6.0 Kg. Per Stay Set)
Prov. HT earthing set complete
Single continuous earth wire (GI 8 SWG) @ 0.102 kg/mtr
Half Clamps
Full Clamps
Prov. 11 KV Danger Plate (250x200x1.60 mm)
Prov. M.S. Nuts & Bolts of various sizes with flat and spring washers
Prov. Barbed Wire
Prov. Alluminium Paint .
Erection of CT PT Combined Unit 50/5Amp(Supplied by HPSEBL)
Static Energy Meter 50/5Amp ,110Volt HT Type
B ABSTRACT OF COST (630 & 400 KVA DTR Combined)
Erection of Distribution Transformer (Ordinary), 11/0.4 kV, 630 KVA (Supplied by HPSEBL)
Erection of Distribution Transformer (Ordinary), 11/0.4 kV, 400 KVA (Supplied by HPSEBL)
Steel Tubular Poles (10 m, Working Load > 250 kgf/m²)
Muffs with concerete filling
X-Arm: [Channel Iron (100x50x6 mm), Length : 2800 mm X 4 Nos]
X-Arm: [Channel Iron (75x40x6 mm), Length : 2800 mm X 4 Nos] for supporting DO fuse unit & GO switch
MS Angle Iron (50X50x6 mm), Length: 2800 mm x(1 Nos for LA's + 2 No. for Dist Panel Box)
Transformer Bed (civil work as per HPSR)
GO AB Switch Unit (11kV, 400A, 25 KA ) (P-30)
D.O Fuse Unit
Surge Arrester, 9 kV Station Class (Porcelain Type)
Discs insulator sets (comprising 1 No. Disc: ^^(Porcelain, BS, 12 kV, 90 kN) including Dead End Clamps etc.)
Stay set complete
Stay Wire (7/3.15 mm) (6.0 kg Per Stay Set)
Pipe Earthing Set
LT Distribution Panel with MCCB (100A,400K 4P, 1 No.& SFU 500Amp 4No.)
Half Clamp (M.S. Flat 50X6 mm)
Full Clamp (M.S. Flat 50X6 mm)
Nuts and Bolts of Various Sizes with flat and spring washers
Aluminium Thimble
Danger Plate
Chain link fencing, Angle iron, gate etc. for transformer fencing
Erection of XLPE Cable 240mm HT (Supplied by HPSEBL)
LT Cable (3.5 Core) 500 mm²
HS Termination Kit 240mm (Out Door)
Aluminium Paint.
Pin Insulator for bus bar at 4Pole Structure
C ABSTRACT OF COST (for 63 KVA DTR Bahri)
Erection of Distribution Transformer (Ordinary), 11/0.4 kV, 63 KVA (Supplied by HPSEBL)
Steel Tubular Poles (9 m, Working Load > 200 kgf/m²)
Muffs with concerete filling
X-Arm: [Channel Iron (100x50x6 mm), Length : 2800 mm X 4 Nos]
X-Arm: [Channel Iron (75x40x6 mm), Length : 2800 mm X 4 Nos] for supporting DO fuse unit & GO switch
X-Arm: [Channel Iron (100x50x6 mm), Length : 460 mm X 2 Nos] for supporting Main Channel of DTR
MS Angle Iron (50X50x6 mm), Length: 2800 mm x(1 Nos for LA's + 2 No. for Dist Panel Box)
Transformer Belting & Knee Bracing
MS Angle Iron (50x50x5)mm, Length 2800 mm x 4 Nos.
MS Angle Iron (35x35x5)mm, Length 460 mm x 2 Nos.
GO AB Switch Unit (11kV, 400A, 25 KA ) (P-30)
D.O Fuse Unit
Surge Arrester, 9 kV Station Class (Porcelain Type)
Discs insulator sets (comprising 1 No. Disc: ^^(Porcelain, BS, 12 kV, 90 kN) including Dead End Clamps etc.)
Stay set complete
Stay Wire (7/3.15 mm) (6.0 kg Per Stay Set)
Pipe Earthing Set
LT Distribution Panel Box with MCCB (100A, 10KA 4P, 1 No.) & SFU (32A, 4 No. rewirable) (P-8)
Half Clamp (M.S. Flat 50X6 mm)
Full Clamp (M.S. Flat 50X6 mm)
Nuts and Bolts of Various Sizes with flat and spring washers
Aluminium Thimble
Aluminium Thimble
Danger Plate
LT Cable (3.5 Core) 70 mm² (P-1)
Erection of CT/PT Unit 11KV (PT (1Unit, 11KV/110V)CT (3 No. 10-25/5A) Provided by HPSEBL.
Prov. Energy Meter (3-Phase, 4-Wire) CT-PT operated Static Trivector Meter "Category -C" (PT RATIO-/-110V, CT ratio-25/5A)
Aluminium Paint.
D ABSTRACT OF COST (for 25 KVA DTR Bahri)
Erection of Distribution Transformer (Ordinary), 11/0.4 kV, 25 KVA (Supplied by HPSEBL)
Steel Tubular Poles (9 m, Working Load > 200 kgf/m²)
Muffs with concerete filling
X-Arm: [Channel Iron (100x50x6 mm), Length : 2800 mm X 4 Nos]
X-Arm: [Channel Iron (75x40x6 mm), Length : 2800 mm X 4 Nos] for supporting DO fuse unit & GO switch
X-Arm: [Channel Iron (100x50x6 mm), Length : 460 mm X 2 Nos] for supporting Main Channel of DTR
MS Angle Iron (50X50x6 mm), Length: 2800 mm x(1 Nos for LA's + 2 No. for Dist Panel Box)
Transformer Belting & Knee Bracing
MS Angle Iron (50x50x5)mm, Length 2800 mm x 4 Nos.
MS Angle Iron (35x35x5)mm, Length 460 mm x 2 Nos.
GO AB Switch Unit (11kV, 400A, 25 KA ) (P-30)
D.O Fuse Unit
Surge Arrester, 9 kV Station Class (Porcelain Type)
Discs insulator sets (comprising 1 No. Disc: ^^(Porcelain, BS, 12 kV, 90 kN) including Dead End Clamps etc.)
Stay set complete
Stay Wire (7/3.15 mm) (6.0 kg Per Stay Set)
Pipe Earthing Set
LT Distribution Panel Box with MCCB (40A, 10KA 4P, 1 No.) & SFU (25A, 4 No. rewirable) (P-8)
Half Clamp (M.S. Flat 50X6 mm)
Full Clamp (M.S. Flat 50X6 mm)
Nuts and Bolts of Various Sizes with flat and spring washers
Aluminium Thimble
Aluminium Thimble
Danger Plate
LT Cable (3.5 Core) 70 mm² (P-1)
Erection of CT/PT Unit 11KV (PT (1Unit, 11KV/110V)CT (3 No. 10-25/5A) Provided by HPSEBL.
Prov. Energy Meter (3-Phase, 4-Wire) CT-PT operated Static Trivector Meter "Category -C" (PT RATIO-/-110V, CT ratio-25/5A)
Aluminium Paint.
E ABSTRACT OF COST (for 25 KVA DTR Bahri)
AAAC 7/3.15mm
ST Poles (9 m, Working Load > 180 kgf/m²)
Muffs with concerete filling (1800 mm)
AI (75x75x6) (length 1.5 mtr.)
Shackle Insulator (16 kN)
D-Iron (U- Clamps)
Earth Knob
LT Stay Set
Stay Wire (7/3.15 mm) (6.0 kg Per Stay Set)
Full Clamps (2 No. for AI & 1 No. for Stay Set)
Earthing Set complete
Earth wire (GI, 8 SWG) {Additional 1% (Sag and wastage)} @ 0.102 kg/m
Nuts and Bolts of Various Sizes (Galvanised / Coated) [Preferably 16 mm Φ or more (with flat and spring washers)]
Aluminium Paint
Spiral PVC Spacer
LT AB Cable 35
DEEPANSHU GAUTAM GOVT. CONTRACTOR
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .