| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹20.3 LAdmitted-Finance | L1 | Admitted-Finance | |
| 2 | L2₹24.3 L+₹4.0 L (20.0%)Admitted-Finance DOOR NO 7 2 30 3 OPP APSEB SUB STATION OLD GAJUWAKA MARRIPALEM VISAKHAPATNAM 530026 | VISAKHAPATANAM | ANDHRA PRADESH | 530026 | L2 | Admitted-Finance | |
| 3 | L3₹34.9 L+₹14.6 L (72.1%)Admitted-Finance 7 32 1 PRASANTHI NAGAR GOPALAPATNAM VISAKHAPATNAM 530 027 | VISAKHAPATANAM | ANDHRA PRADESH | 530027 | L3 | Admitted-Finance | |
| 4 | L4₹51.0 L+₹30.7 L (151.5%)Admitted-Finance 49 41 3 AKKAYYAPALEM VISAKHAPATNAM ANDHRA PRADESH 530016 UDYAM AP 10 0009053 37AAEFF6271C1ZL R M MII STATUS AS VERIFIED | VISAKHAPATANAM | ANDHRA PRADESH | 530016 | L4 | Admitted-Finance | |
| 5 | L5₹54.2 L+₹34.0 L (167.6%)Admitted-Finance | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | POSITIVE CONTROLS L6 | FIELD TECH ENGINEERS AND CONTRACTORS L4 | newton electro technics L2 | ALFATRONIC MARINE AUTOMATION SERVICES L5 | sowmya enterprises L1 | MVV Prasad L3 |
|---|---|---|---|---|---|---|---|---|---|
| 1.00Laying and Jointing PVC Pipe. Heading | |||||||||
| 1.01 | AMC of the Fire Alarm and Detection system at Slipway, DS Department
Location: - DRY DOCK AND SLIPWAY Dept.-Slipway -02
Microprocessor based networking type Fire alarm control panel with supply unit heavy duty Battery charger, Tested and proved functionally. Unit confirm to IS: 2189.
Periodicity: Monthly | 1 | Nos. | 15,000 ₹17,700 | 6,000 ₹7,080 | 3,000 ₹3,540 | 35,000 ₹41,300 | 850 ₹1,003 Lowest | 5,000 ₹5,900 |
| 1.02 | 02 Nos. batteries (12V 07AH) check the termination and connections Periodicity: Weekly | 2 | Nos. | 1,200 ₹1,416 | 1,600 ₹1,888 | 584 ₹689.12 Lowest | 1,900 ₹2,242 | 1,700 ₹2,006 | 1,200 ₹1,416 |
| 1.03 | Manual call points
Push buttons to be replaced with new ones along with frames and civil works.
Broken glasses to be replaced
Functional tests to be carried out and proved.
Periodicity: Monthly | 3 | Nos. | 1,200 ₹1,416 | 900 ₹1,062 | 405 ₹477.9 Lowest | 3,000 ₹3,540 | 2,700 ₹3,186 | 750 ₹885 |
| 1.04 | Electronic hooters (Buzzers /Alarm)
Repaired by replacement if defective components.
To be proved for functionally.
Periodicity: Monthly | 1 | Nos. | 1,200 ₹1,416 | 450 ₹531 | 135 ₹159.3 Lowest | 500 ₹590 | 197 ₹232.46 | 300 ₹354 |
| 1.05 | Cables: Entire electrical cabling is to be checked for continuity and repair or replacement to be under taken wherever necessary. Mat 2x1.5 sq.mm copper PVC cable conforming to IS: 1554 specification. Periodicity: Yearly | 600 | Mtrs | 12,000 ₹14,160 | 2,400 ₹2,832 | 1,200 ₹1,416 Lowest | 6,000 ₹7,080 | 6,000 ₹7,080 | 3,000 ₹3,540 |
| 1.06 | AMC of the Fire Alarm and Detection system at Slipway 7 & 14, DS Department
Location: - DRY DOCK AND SLIPWAY Dept.-Slipway -01
Microprocessor based networking type Fire alarm control panel with supply unit heavy duty Battery charger, Tested and proved functionally.
Unit confirm to IS: 2189
Periodicity: Monthly | 1 | Nos. | 15,000 ₹17,700 | 6,000 ₹7,080 | 3,000 ₹3,540 | 35,000 ₹41,300 | 967 ₹1,141.06 Lowest | 5,000 ₹5,900 |
| 1.07 | 02 Nos. batteries (12V 07AH) check the termination and connections Periodicity: Weekly | 2 | Nos. | 1,200 ₹1,416 | 1,600 ₹1,888 | 584 ₹689.12 Lowest | 1,900 ₹2,242 | 1,934 ₹2,282.12 | 1,200 ₹1,416 |
| 1.08 | Manual call points
Push buttons to be replaced with new ones along with frames and civil works.
Broken glasses to be replaced
Functional tests to be carried out and proved.
Periodicity: Monthly | 9 | Nos. | 3,600 ₹4,248 | 2,700 ₹3,186 | 1,215 ₹1,433.7 Lowest | 4,500 ₹5,310 | 8,100 ₹9,558 | 2,250 ₹2,655 |
| 1.09 | Electronic hooters (Buzzers /Alarm)
Repaired by replacement if defective components.
To be proved for functionally.
Periodicity: Monthly | 3 | Nos. | 9,000 ₹10,620 | 1,350 ₹1,593 | 405 ₹477.9 Lowest | 2,250 ₹2,655 | 591 ₹697.38 | 900 ₹1,062 |
Tender Value
Refer Docs
EMD Value
₹1.1 L
Closing Date
3 Oct 2020, 6:30 pmClosed
MYP
The Admiral Superintendent (for MYP) Naval Dockyard Visakhapatnam 530014
E Tender for Comprehensive AMC of firefighting / detection/ alarms / sprinkling system of various departments at ND(V).
2020_NAVY_375728_1
RPYP/AMC/20-21/042
Open Tender
Miscellaneous Services
Supply
365 days
Naval Dockyard at Visakhapatnam
Pre bid meeting on dated 22 Sep 2020 on 1030Hrs at CSFO department in NDV. contact details.0891-2816624
4 documents required · 4 mandatory
₹0
₹1.1 L
Yes
CSFO department at ND(V)
24 Nov 2020
10 Sept 2020
5 Oct 2020
10 Sept 2020
3 Oct 2020
22 Sept 2020
22 Sept 2020
Laying and Jointing PVC Pipe. Heading
AMC of the Fire Alarm and Detection system at Slipway, DS Department Location: - DRY DOCK AND SLIPWAY Dept.-Slipway -02 Microprocessor based networking type Fire alarm control panel with supply unit heavy duty Battery charger, Tested and proved functionally. Unit confirm to IS: 2189. Periodicity: Monthly
02 Nos. batteries (12V 07AH) check the termination and connections Periodicity: Weekly
Manual call points Push buttons to be replaced with new ones along with frames and civil works. Broken glasses to be replaced Functional tests to be carried out and proved. Periodicity: Monthly
Electronic hooters (Buzzers /Alarm) Repaired by replacement if defective components. To be proved for functionally. Periodicity: Monthly
Cables: Entire electrical cabling is to be checked for continuity and repair or replacement to be under taken wherever necessary. Mat 2x1.5 sq.mm copper PVC cable conforming to IS: 1554 specification. Periodicity: Yearly
AMC of the Fire Alarm and Detection system at Slipway 7 & 14, DS Department Location: - DRY DOCK AND SLIPWAY Dept.-Slipway -01 Microprocessor based networking type Fire alarm control panel with supply unit heavy duty Battery charger, Tested and proved functionally. Unit confirm to IS: 2189 Periodicity: Monthly
02 Nos. batteries (12V 07AH) check the termination and connections Periodicity: Weekly
Manual call points Push buttons to be replaced with new ones along with frames and civil works. Broken glasses to be replaced Functional tests to be carried out and proved. Periodicity: Monthly
Electronic hooters (Buzzers /Alarm) Repaired by replacement if defective components. To be proved for functionally. Periodicity: Monthly
Cables: Entire electrical cabling is to be checked for continuity and repair or replacement to be under taken wherever necessary. Mat 2x1.5 sq.mm copper PVC cable conforming to IS: 1554 specification. Periodicity: Yearly
AMC of the Fire Alarm and Detection system and Water Sprinkler System at Wood storage area Building 21.Ds Department. Location: - DRY DOCK AND SLIPWAY Dept. -21Bldg Microprocessor based networking type Fire alarm control panel with supply unit heavy duty Battery charger, Tested and proved functionally. Unit confirm to IS: 2189. Periodicity: Monthly
Ionization / Photo electric / Heat detectors of Apollo make along with mounting base and junction boxes. (a) Testing of Smoke/heat sensors for functional performance. (b) De dusting / cleaning of all sensors. Periodicity: Yearly Monthly
Manual Call Points with LED indications. Painted signal red. All the manual call points are to be examined for proper functioning. Periodicity: Monthly
24Volt Dc Electronic hooter. All the electronic hooters are to be tested for proper functioning, along with fire along control panel Periodicity: Monthly
Cu.Ar. cables 2 core x 1.5 Sq.mm Checking of cables for proper termination and continuity. Replace damaged cables due to any mechanical or electrical short circuit. Periodicity: Six month
Water Sprinkler, in Brass material ½” BSPT end connection, Pendent type with UL and C UL listed, FM, LPCB and NYC approved maximum working pressure 175psi. Periodicity: Monthly
Deluge valve model – A, UL listed for Vertical inlet to Horizontal outlet mounting, Cast iron material flanged end to ANSI B16.1, Class 125, without any trim, Size 80NB. Periodicity: Monthly
24 Volt solenoid valves of ½” port. Periodicity: Monthly
Pressure Gauge and allied accessories. Periodicity: Monthly
Revisioning of Sluice valves / Globe valves a) 80mm Periodicity: Monthly
b) 32mm Periodicity: Monthly
Cleaning of “Y” Type Strainers 80 NB Periodicity: Monthly
Painting of the entire system with one coat of Red oxide and two coats of red enamel paint. Periodicity: Yearly
AMC of the Fire Alarm and Detection system at DSC Block-01, Naval Dockyard, Visakhapatnam Location: - DSC Block Building -01 Microprocessor based networking type Fire alarm control panel with supply unit heavy duty Battery charger, Tested and proved functionally. Unit confirm to IS: 2189. Periodicity: Monthly
02 Nos. batteries (12V 07AH) check the termination and connections Periodicity: Weekly
Manual call points Push buttons to be replaced with new ones along with frames and civil works. Broken glasses to be replaced Functional tests to be carried out and proved. Periodicity: Monthly
Electronic hooters (Buzzers /Alarm) Repaired by replacement if defective components. To be proved for functionally. Periodicity: Monthly
Cables: Entire electrical cabling is to be checked for continuity and repair or replacement to be under taken wherever necessary. Mat 2x1.5 sq.mm copper PVC cable conforming to IS: 1554 specification. Periodicity: Yearly
AMC of the Fire Alarm and Detection system at DSC Block-02, Naval Dockyard, Visakhapatnam Location: - DSC Block Building -02 Microprocessor based networking type Fire alarm control panel with supply unit heavy duty Battery charger, Tested and proved functionally. Unit confirm to IS: 2189. Periodicity: Monthly
02 Nos. batteries (12V 07AH) check the termination and connections Periodicity: Weekly
Manual call points Push buttons to be replaced with new ones along with frames and civil works. Broken glasses to be replaced Functional tests to be carried out and proved. Periodicity: Monthly
Electronic hooters (Buzzers /Alarm) Repaired by replacement if defective components. To be proved for functionally. Periodicity: Monthly
Cables: Entire electrical cabling is to be checked for continuity and repair or replacement to be under taken wherever necessary. Mat 2x1.5 sq.mm copper PVC cable conforming to IS: 1554 specification. Periodicity: Six monthly
AMC of the Fire Alarm and Detection system at HULL FAB, Naval Dockyard, Visakhapatnam Location: - HULL FAB Microprocessor based networking type Fire alarm control panel with supply unit heavy duty Battery charger, Tested and proved functionally. Unit confirm to IS: 2189. Periodicity: Monthly
02 Nos. batteries (12V 07AH) check the termination and connections Periodicity: Weekly
Manual call points Push buttons to be replaced with new ones along with frames and civil works. Broken glasses to be replaced Functional tests to be carried out and proved. Periodicity: Monthly
Electronic hooters (Buzzers /Alarm) Repaired by replacement if defective components. To be proved for functionally. Periodicity: Monthly
Cables: Entire electrical cabling is to be checked for continuity and repair or replacement to be under taken wherever necessary. Mat 2x1.5 sq.mm copper PVC cable conforming to IS: 1554 specification. Periodicity: Yearly
AMC of the Fire Alarm and Detection system at FAB 18-A, Naval Dockyard, Visakhapatnam Location: - 18 A Building, FAB Department Microprocessor based networking type Fire alarm control panel with supply unit heavy duty Battery charger, Tested and proved functionally. Unit confirm to IS: 2189. Periodicity: Monthly
02 Nos. batteries (12V 07AH) check the termination and connections Periodicity: Weekly
Ionization / Photo electric / Heat detectors of Apollo make along with mounting base and junction boxes. (a) Testing of Smoke/heat sensors for functional performance. (b) De dusting / cleaning of all sensors. Periodicity: Yearly Monthly.
Manual call points Push buttons to be replaced with new ones along with frames and civil works. Broken glasses to be replaced Functional tests to be carried out and proved. Periodicity: Monthly
Electronic hooters (Buzzers /Alarm) Repaired by replacement if defective components. To be proved for functionally. Periodicity: Monthly
Cables: Entire electrical cabling is to be checked for continuity and repair or replacement to be under taken wherever necessary. Mat 2x1.5 sq.mm copper PVC cable conforming to IS: 1554 specification. Periodicity: Yearly
AMC of the Fire Alarm and Detection system at FAB 18 Building, 1st Floor, Naval Dockyard, Visakhapatnam Location: - 18 Building, 1st Floor, FAB Department Microprocessor based networking type Fire alarm control panel with supply unit heavy duty Battery charger, Tested and proved functionally. Unit confirm to IS: 2189. Periodicity: Monthly
02 Nos. batteries (12V 07AH) check the termination and connections. Periodicity: Weekly
Ionization / Photo electric / Heat detectors of Apollo make along with mounting base and junction boxes. (a) Testing of Smoke/heat sensors for functional performance. (b) De dusting / cleaning of all sensors. Periodicity: Yearly Monthly.
Manual call points Push buttons to be replaced with new ones along with frames and civil works. Broken glasses to be replaced Functional tests to be carried out and proved. Periodicity: Monthly
Electronic hooters (Buzzers /Alarm) Repaired by replacement if defective components. To be proved for functionally. Periodicity: Monthly
Cables: Entire electrical cabling is to be checked for continuity and repair or replacement to be under taken wherever necessary. Mat 2x1.5 sq.mm copper PVC cable conforming to IS: 1554 specification. Periodicity: Yearly
AMC of the Fire Alarm and Detection system at FAB 18 Building, Naval Dockyard, Visakhapatnam Location: - 18 Building, FAB Department Microprocessor based networking type Fire alarm control panel with supply unit heavy duty Battery charger, Tested and proved functionally. Unit confirm to IS: 2189. Periodicity: Monthly
02 Nos. batteries (12V 07AH) check the termination and connections Periodicity: Weekly
Ionization / Photo electric / Heat detectors of Apollo make along with mounting base and junction boxes. (a) Testing of Smoke/heat sensors for functional performance. (b) De dusting / cleaning of all sensors. Periodicity: Yearly Monthly.
Manual call points Push buttons to be replaced with new ones along with frames and civil works. Broken glasses to be replaced Functional tests to be carried out and proved. Periodicity: Monthly
Electronic hooters (Buzzers /Alarm) Repaired by replacement if defective components. To be proved for functionally. Periodicity: Monthly
Cables: Entire electrical cabling is to be checked for continuity and repair or replacement to be under taken wherever necessary. Mat 2x1.5 sq.mm copper PVC cable conforming to IS: 1554 specification. Periodicity: Yearly
AMC of the Fire Alarm and Detection system at 37 Building OUT FITTING Department Location: - OUT Dept-Bldg-37, Paint store Microprocessor based networking type Fire alarm control panel with supply unit heavy duty Battery charger, Tested and proved functionally. Unit confirm to IS: 2189. Periodicity: Monthly
02 Nos. batteries (12V 07AH) check the termination and connections Periodicity: Weekly
Ionization / Photo electric / Heat detectors of Apollo make along with mounting base and junction boxes. Testing of Smoke/heat sensors for functional performance. De dusting / cleaning of all sensors. Periodicity: Yearly Monthly.
Manual call points Push buttons to be replaced with new ones along with frames and civil works. Broken glasses to be replaced Functional tests to be carried out and proved. Periodicity: Monthly
Electronic hooters (Buzzers /Alarm) Repaired by replacement if defective components. To be proved for functionally. Periodicity: Monthly
Cables: Entire electrical cabling is to be checked for continuity and repair or replacement to be under taken wherever necessary. Mat 2x1.5 sq.mm copper PVC cable conforming to IS: 1554 specification. Periodicity: Yearly
AMC of the Fire Alarm and Detection system at Wood Work Shop & Painting OUT FITTING Department Location: - OUT Dept- Wood Work Shop & Painting Microprocessor based networking type Fire alarm control panel with supply unit heavy duty Battery charger, Tested and proved functionally. Unit confirm to IS: 2189. Periodicity: Monthly
02 Nos. batteries (12V 07AH) check the termination and connections Periodicity: Weekly
Ionization / Photo electric / Heat detectors of Apollo make along with mounting base and junction boxes. Testing of Smoke/heat sensors for functional performance. De dusting / cleaning of all sensors. Periodicity: Yearly Monthly.
Manual call points Push buttons to be replaced with new ones along with frames and civil works. Broken glasses to be replaced Functional tests to be carried out and proved. Periodicity: Monthly
Electronic hooters (Buzzers /Alarm) Repaired by replacement if defective components. To be proved for functionally. Periodicity: Monthly
Cables: Entire electrical cabling is to be checked for continuity and repair or replacement to be under taken wherever necessary. Mat 2x1.5 sq.mm copper PVC cable conforming to IS: 1554 specification. Periodicity: Yearly
AMC of the Fire Alarm and Detection system at Wood Work Shop, OUT FITTING Department Location: - OUT Dept.- Wood Work Shop Microprocessor based networking type Fire alarm control panel with supply unit heavy duty Battery charger, Tested and proved functionally. Unit confirm to IS: 2189. Periodicity: Monthly
02 Nos. batteries (12V 07AH) check the termination and connections Periodicity: Weekly
Manual call points Push buttons to be replaced with new ones along with frames and civil works. Broken glasses to be replaced Functional tests to be carried out and proved. Periodicity: Monthly
Electronic hooters (Buzzers /Alarm) Repaired by replacement if defective components. To be proved for functionally. Periodicity: Monthly
Cables: Entire electrical cabling is to be checked for continuity and repair or replacement to be under taken wherever necessary. Mat 2x1.5 sq.mm copper PVC cable conforming to IS: 1554 specification. Periodicity: Yearly
AMC of the Fire Alarm and Detection system at Building 25-A Weapon Department Location: - Building 25-A Weapon Department Microprocessor based networking type Fire alarm control panel with supply unit heavy duty Battery charger, Tested and proved functionally. Unit confirm to IS: 2189 Periodicity: Monthly
02 Nos. batteries (12V 07AH) check the termination and connections Periodicity: Weekly
Ionization / Photo electric / Heat detectors of Apollo make along with mounting base and junction boxes. Testing of Smoke/heat sensors for functional performance. De dusting / cleaning of all sensors. Periodicity: Yearly Monthly.
Manual call points Push buttons to be replaced with new ones along with frames and civil works. Broken glasses to be replaced Functional tests to be carried out and proved. Periodicity: Monthly
Electronic hooters (Buzzers /Alarm) Repaired by replacement if defective components. To be proved for functionally. Periodicity: Monthly
Cables: Entire electrical cabling is to be checked for continuity and repair or replacement to be under taken wherever necessary. Mat 2x1.5 sq.mm copper PVC cable conforming to IS: 1554 specification. Periodicity: Yearly
AMC of the Fire Alarm and Detection system at Building 25-B Weapon Department Location: - Building 25-B Weapon Department Microprocessor based networking type Fire alarm control panel with supply unit heavy duty Battery charger, Tested and proved functionally. Unit confirm to IS: 2189. Periodicity: Monthly
02 Nos. batteries (12V 07AH) check the termination and connections Periodicity: Weekly
Ionization / Photo electric / Heat detectors of Apollo make along with mounting base and junction boxes. Testing of Smoke/heat sensors for functional performance. De dusting / cleaning of all sensors. Periodicity: Yearly Monthly.
Manual call points Push buttons to be replaced with new ones along with frames and civil works. Broken glasses to be replaced Functional tests to be carried out and proved. Periodicity: Monthly
Electronic hooters (Buzzers /Alarm) Repaired by replacement if defective components. To be proved for functionally. Periodicity: Monthly
Cables: Entire electrical cabling is to be checked for continuity and repair or replacement to be under taken wherever necessary. Mat 2x1.5 sq.mm copper PVC cable conforming to IS: 1554 specification. Periodicity: Yearly
AMC of the Fire Alarm and Detection system at Building 25-C Weapon Department Location: - Building 25-C Weapon Department Microprocessor based networking type Fire alarm control panel with supply unit heavy duty Battery charger, Tested and proved functionally. Unit confirm to IS: 2189. Periodicity: Monthly
02 Nos. batteries (12V 07AH) check the termination and connections Periodicity: Weekly
Ionization / Photo electric / Heat detectors of Apollo make along with mounting base and junction boxes. Testing of Smoke/heat sensors for functional performance. De dusting / cleaning of all sensors. Periodicity: Yearly Monthly
Manual call points Push buttons to be replaced with new ones along with frames and civil works. Broken glasses to be replaced Functional tests to be carried out and proved. Periodicity: Monthly.
Electronic hooters (Buzzers /Alarm) Repaired by replacement if defective components. To be proved for functionally. Periodicity: Monthly
Cables: Entire electrical cabling is to be checked for continuity and repair or replacement to be under taken wherever necessary. Mat 2x1.5 sq.mm copper PVC cable conforming to IS: 1554 specification. Periodicity: Yearly
AMC of the Fire Alarm and Detection system at Building 25-D Weapon Department Location: - Building 25-D Weapon Department Microprocessor based networking type Fire alarm control panel with supply unit heavy duty Battery charger, Tested and proved functionally. Unit confirm to IS: 2189. Periodicity: Monthly
02 Nos. batteries (12V 07AH) check the termination and connections Periodicity: Weekly
Ionization / Photo electric / Heat detectors of Apollo make along with mounting base and junction boxes. Testing of Smoke/heat sensors for functional performance. De dusting / cleaning of all sensors. Periodicity: Yearly Monthly
Manual call points Push buttons to be replaced with new ones along with frames and civil works. Broken glasses to be replaced Functional tests to be carried out and proved. Periodicity: Monthly
Electronic hooters (Buzzers /Alarm) Repaired by replacement if defective components. To be proved for functionally. Periodicity: Monthly
Cables: Entire electrical cabling is to be checked for continuity and repair or replacement to be under taken wherever necessary. Mat 2x1.5 sq.mm copper PVC cable conforming to IS: 1554 specification. Periodicity: Yearly
AMC of the Fire Alarm and Detection system at Building 25-E Weapon Department Location: - Building 25-E Weapon Department Microprocessor based networking type Fire alarm control panel with supply unit heavy duty Battery charger, Tested and proved functionally. Unit confirm to IS: 2189. Periodicity: Monthly
02 Nos. batteries (12V 07AH) check the termination and connections Periodicity: Weekly
Ionization / Photo electric / Heat detectors of Apollo make along with mounting base and junction boxes. Testing of Smoke/heat sensors for functional performance. De dusting / cleaning of all sensors. Periodicity: Yearly Monthly
Manual call points Push buttons to be replaced with new ones along with frames and civil works. Broken glasses to be replaced Functional tests to be carried out and proved. Periodicity: Monthly
Electronic hooters (Buzzers /Alarm) Repaired by replacement if defective components. To be proved for functionally. Periodicity: Monthly
Cables: Entire electrical cabling is to be checked for continuity and repair or replacement to be under taken wherever necessary. Mat 2x1.5 sq.mm copper PVC cable conforming to IS: 1554 specification. Periodicity: Yearly
AMC of the Fire Alarm and Detection system at Building 25-E, PCB Centre, 2nd Floor Weapon Department Location: - Building 25-E Floor, 2nd Floor Weapon Department Microprocessor based networking type Fire alarm control panel with supply unit heavy duty Battery charger, Tested and proved functionally. Unit confirm to IS: 2189. Periodicity: Monthly
02 Nos. batteries (12V 07AH) check the termination and connections Periodicity: Weekly
Ionization / Photo electric / Heat detectors of Apollo make along with mounting base and junction boxes. Testing of Smoke/heat sensors for functional performance. De dusting / cleaning of all sensors. Periodicity: Yearly Monthly
Manual call points Push buttons to be replaced with new ones along with frames and civil works. Broken glasses to be replaced Functional tests to be carried out and proved. Periodicity: Monthly
Electronic hooters (Buzzers /Alarm) Repaired by replacement if defective components. To be proved for functionally. Periodicity: Monthly
Cables: Entire electrical cabling is to be checked for continuity and repair or replacement to be under taken wherever necessary. Mat 2x1.5 sq.mm copper PVC cable conforming to IS: 1554 specification. Periodicity: Yearly
AMC of the Fire Alarm and Detection system at SRGM -1, Weapon Department Location: - SRGM-1, Weapon Department Microprocessor based networking type Fire alarm control panel with supply unit heavy duty Battery charger, Tested and proved functionally. Unit confirm to IS: 2189. Periodicity: Monthly
02 Nos. batteries (12V 07AH) check the termination and connections Periodicity: Weekly
Ionization / Photo electric / Heat detectors of Apollo make along with mounting base and junction boxes. Testing of Smoke/heat sensors for functional performance. De dusting / cleaning of all sensors. Periodicity: Yearly Monthly
Manual call points Push buttons to be replaced with new ones along with frames and civil works. Broken glasses to be replaced Functional tests to be carried out and proved. Periodicity: Monthly
Electronic hooters (Buzzers /Alarm) Repaired by replacement if defective components. To be proved for functionally. Periodicity: Monthly
Cables: Entire electrical cabling is to be checked for continuity and repair or replacement to be under taken wherever necessary. Mat 2x1.5 sq.mm copper PVC cable conforming to IS:1554 specification. Periodicity: Yearly
AMC of the Fire Alarm and Detection system at SRGM –II (Bldg A Annx), Weapon Department Location: - SRGM-II (Bldg A Annx), Weapon Department Microprocessor based networking type Fire alarm control panel with supply unit heavy duty Battery charger, Tested and proved functionally. Unit confirm to IS: 2189. Periodicity: Monthly
02 Nos. batteries (12V 07AH) check the termination and connections Periodicity: Weekly
Ionization / Photo electric / Heat detectors of Apollo make along with mounting base and junction boxes. Testing of Smoke/heat sensors for functional performance. De dusting / cleaning of all sensors. Periodicity: Yearly Monthly
Manual call points Push buttons to be replaced with new ones along with frames and civil works. Broken glasses to be replaced Functional tests to be carried out and proved. Periodicity: Monthly
Electronic hooters (Buzzers /Alarm) Repaired by replacement if defective components. To be proved for functionally. Periodicity: Monthly
Cables: Entire electrical cabling is to be checked for continuity and repair or replacement to be under taken wherever necessary. Mat 2x1.5 sq.mm copper PVC cable conforming to IS: 1554 specification. Periodicity: Yearly
AMC of the Fire Alarm and Detection system at Building 42, IT Department Location: - Building 42, IT Department Microprocessor based networking type Fire alarm control panel with supply unit heavy duty Battery charger, Tested and proved functionally along with auto dialer. Unit confirm to IS: 2189. Periodicity: Monthly
02 Nos. batteries (12V 07AH) check the termination and connections Periodicity: Weekly
Ionization / Photo electric / Heat detectors of Apollo make along with mounting base and junction boxes. (a) Testing of Smoke/heat sensors for functional performance. (b) De dusting / cleaning of all sensors. Periodicity: Yearly Monthly
Manual call points Push buttons to be replaced with new ones along with frames and civil works. Broken glasses to be replaced Functional tests to be carried out and proved. Periodicity: Monthly
Electronic hooters (Buzzers /Alarm) Repaired by replacement if defective components. To be proved for functionally. Periodicity: Monthly
Cables: Entire electrical cabling is to be checked for continuity and repair or replacement to be under taken wherever necessary. Mat 2x1.5 sq.mm copper PVC cable conforming to IS: 1554 specification. Periodicity: Yearly
AMC of the Fire Alarm and Detection system at COY Department Location: - COY Department Microprocessor based networking type Fire alarm control panel with supply unit heavy duty Battery charger, Tested and proved functionally along with auto dialer. Unit confirm to IS: 2189. Periodicity: Monthly
02 Nos. batteries (12V 07AH) check the termination and connections Periodicity: Weekly
Ionization / Photo electric / Heat detectors of Apollo make along with mounting base and junction boxes. Testing of Smoke/heat sensors for functional performance. De dusting / cleaning of all sensors. Periodicity: Yearly Monthly
Manual call points Push buttons to be replaced with new ones along with frames and civil works. Broken glasses to be replaced Functional tests to be carried out and proved. Periodicity: Monthly
Electronic hooters (Buzzers /Alarm) Repaired by replacement if defective components. To be proved for functionally. Periodicity: Monthly
Cables: Entire electrical cabling is to be checked for continuity and repair or replacement to be under taken wherever necessary. Mat 2x1.5 sq.mm copper PVC cable conforming to IS: 1554 specification. Periodicity: Six monthly
AMC of the Fire Alarm and Detection system at AMBA Store, MAT Department Location: - AMBA Store, MAT Department Microprocessor based networking type Fire alarm control panel with supply unit heavy duty Battery charger, Tested and proved functionally along with auto dialer. Unit confirm to IS: 2189. Periodicity: Monthly
02 Nos. batteries (12V 07AH) check the termination and connections Periodicity: Weekly
Ionization / Photo electric / Heat detectors of Apollo make along with mounting base and junction boxes. (a) Testing of Smoke/heat sensors for functional performance. (b) De dusting / cleaning of all sensors. Periodicity: Yearly Monthly
Manual call points Push buttons to be replaced with new ones along with frames and civil works. Broken glasses to be replaced Functional tests to be carried out and proved. Periodicity: Monthly
Electronic hooters (Buzzers /Alarm) Repaired by replacement if defective components. To be proved for functionally. Periodicity: Monthly
Cables: Entire electrical cabling is to be checked for continuity and repair or replacement to be under taken wherever necessary. Mat 2x1.5 sq.mm copper PVC cable conforming to IS: 1554 specification. Periodicity: Yearly
CAMC of the Fire Alarm and Detection system and CO2 firefighting system at Building 29 –Sub -station, TEST HOUSE Department. Location: - Building 29 –Sub -station, TEST HOUSE Department Microprocessor based networking type Fire alarm control panel with supply unit heavy duty Battery charger, Tested and proved functionally. Unit confirm to IS: 2189. Periodicity: Monthly
02 Nos. batteries (12V 07AH) check the termination and connections Periodicity: Weekly
Ionization / Photo electric / Heat detectors of Apollo make along with mounting base and junction boxes. (a) Testing of Smoke/heat sensors for functional performance. (b) De dusting / cleaning of all sensors Periodicity: Monthly Yearly Monthly
Cu.Ar.cables 2 core x 1.5 Sq.mm, Checking of cables for proper termination and continuity. Replace damaged cables due to any mechanical or electrical short circuit. Periodicity: Yearly
Manual pull boxes, All the manual pull boxes are to be examined for proper functioning. All the manual pull boxes are to be tested. Periodicity: Monthly
24 Volt Dc Electronic hooters. All the electronic hooters are to be tested for proper functioning, along with fire along control panel. Periodicity: Monthly
Electrical trip to release CO2, ,All the electrical trip mechanisms are to be tested for proper functioning. All the 24Volt high Ampere coils are to be checked for proper function. Periodicity: Monthly
Mechanical trip, All the mechanical trip mechanisms are to be checked for free movement and lock pin arrangement. Carry out greasing and cleaning as required for all the opening mechanisms. Periodicity: Monthly
Manual call points, Push buttons to be replaced with new ones and Broken glasses to be replaced, Functional tests to be carried out and proved. Periodicity: Monthly
Directional valves (NRV), All the directional valves is to be cleaned with high-pressure air to remove any choking. Periodicity: Monthly
CO2 Nozzle, All the CO2 discharge nozzles are to be blow in with compressed air to remove any foreign deposits. Periodicity: Yearly
High pressure braided hose, Interconnection hoses are to be checked for proper connection and if found damaged, the same one to be replaced with new one. Periodicity: Monthly
Pipe network, Entire pipe network is to be scrapped with one coat of red oxide and two coats of signal red. Periodicity: Yearly
45 Kg CO2 cylinders, CO2 cylinders are to be disconnected from the cylinder bank and weighed, and if found any weight difference to an extend of 10% it is to be refilled with 99% pure CO2. All the cylinder release valves are to be tested for proper functioning after isolating the CO2 cylinder (Dummy test). Periodicity: Yearly
CO2 cylinder valves, All the cylinder valves are to be visually checked for proper connections. Periodicity: Yearly
CAMC of the Fire Alarm and Detection system and CO2 firefighting system at Building 29, TEST HOUSE Department. Location: - Building 29, TEST HOUSE Department. Microprocessor based networking type Fire alarm control panel with supply unit heavy duty Battery charger, Tested and proved functionally. Unit confirm to IS: 2189. Periodicity: Monthly
02 Nos. batteries (12V 07AH) check the termination and connections Periodicity: Weekly
Ionization / Photo electric / Heat detectors of Apollo make along with mounting base and junction boxes. (a) Testing of Smoke/heat sensors for functional performance. (b) De dusting / cleaning of all sensors Periodicity: Monthly Yearly Monthly
Cu.Ar.cables 2 core x 1.5 Sq.mm, Checking of cables for proper termination and continuity. Replace damaged cables due to any mechanical or electrical short circuit. Periodicity: Yearly
Manual pull boxes, All the manual pull boxes are to be examined for proper functioning. All the manual pull boxes are to be tested. Periodicity: Monthly
24 Volt Dc Electronic hooters. All the electronic hooters are to be tested for proper functioning, along with fire along control panel. Periodicity: Monthly
Electrical trip to release CO2, All the electrical trip mechanisms are to be tested for proper functioning. All the 24Volt high Ampere coils are to be checked for proper function. Periodicity: Monthly
Mechanical trip, All the mechanical trip mechanisms are to be checked for free movement and lock pin arrangement. Carry out greasing and cleaning as required for all the opening mechanisms. Periodicity: Monthly
Manual call points, Push buttons to be replaced with new ones and Broken glasses to be replaced, Functional tests to be carried out and proved. Periodicity: Monthly
Directional valves (NRV), All the directional valves is to be cleaned with high-pressure air to remove any choking. Periodicity: Monthly
CO2 Nozzle, All the CO2 discharge nozzles are to be blow in with compressed air to remove any foreign deposits. Periodicity: Yearly
High pressure braided hose, Interconnection hoses are to be checked for proper connection and if found damaged, the same one to be replaced with new one. Periodicity: Monthly
Pipe network, Entire pipe network is to be scrapped with one coat of red oxide and two coats of signal red. Periodicity: Yearly
22.5 Kg CO2 cylinders, CO2 cylinders are to be disconnected from the cylinder bank and weighed, and if found any weight difference to an extend of 10% it is to be refilled with 99% pure CO2. All the cylinder release valves are to be tested for proper functioning after isolating the CO2 cylinder (Dummy test). Periodicity: Yearly
CO2 cylinder valves, All the cylinder valves are to be visually checked for proper connections. Periodicity: Yearly
CAMC of the Fire Alarm and Detection system and CO2 firefighting system at Building 21, TEST HOUSE Department. Location: - Building 21, TEST HOUSE Department. Microprocessor based networking type Fire alarm control panel with supply unit heavy duty Battery charger, Tested and proved functionally. Unit confirm to IS: 2189. Periodicity: Monthly
02 Nos. batteries (12V 07AH) check the termination and connections Periodicity: Weekly
Ionization / Photo electric / Heat detectors of Apollo make along with mounting base and junction boxes. (a) Testing of Smoke/heat sensors for functional performance. (b) De dusting / cleaning of all sensors Periodicity: Monthly Yearly Monthly
Cu.Ar.cables 2 core x 1.5 Sq.mm, Checking of cables for proper termination and continuity. Replace damaged cables due to any mechanical or electrical short circuit. Periodicity: Yearly
Manual pull boxes, All the manual pull boxes are to be examined for proper functioning. All the manual pull boxes are to be tested. Periodicity: Monthly
24 Volt Dc Electronic hooters. All the electronic hooters are to be tested for proper functioning, along with fire along control panel. Periodicity: Monthly
Electrical trip to release CO2, all the electrical trip mechanisms are to be tested for proper functioning. All the 24Volt high Ampere coils are to be checked for proper function. Periodicity: Monthly
Mechanical trip, All the mechanical trip mechanisms are to be checked for free movement and lock pin arrangement. Carry out greasing and cleaning as required for all the opening mechanisms. Periodicity: Monthly
Manual call points, Push buttons to be replaced with new ones and Broken glasses to be replaced, Functional tests to be carried out and proved. Periodicity: Monthly
Directional valves (NRV), All the directional valves is to be cleaned with high-pressure air to remove any choking. Periodicity: Monthly
CO2 Nozzle, All the CO2 discharge nozzles are to be blow in with compressed air to remove any foreign deposits. Periodicity: Yearly
High pressure braided hose, Interconnection hoses are to be checked for proper connection and if found damaged, the same one to be replaced with new one. Periodicity: Monthly
Pipe network, Entire pipe network is to be scrapped with one coat of red oxide and two coats of signal red. Periodicity: Yearly
45 Kg CO2 cylinders, CO2 cylinders are to be disconnected from the cylinder bank and weighed, and if found any weight difference to an extend of 10% it is to be refilled with 99% pure CO2. All the cylinder release valves are to be tested for proper functioning after isolating the CO2 cylinder (Dummy test). Periodicity: Yearly
CO2 cylinder valves, All the cylinder valves are to be visually checked for proper connections. Periodicity: Yearly
CAMC of the Fire Alarm and Detection system and CO2 firefighting system at Building 23 –EDG, YARD UTILITY Department. Location: - Building 23 –EDG, YARD UTILITY Department. Microprocessor based networking type Fire alarm control panel with supply unit heavy duty Battery charger, Tested and proved functionally. Unit confirm to IS: 2189. Periodicity: Monthly
02 Nos. batteries (12V 07AH) check the termination and connections Periodicity: Weekly
Ionization / Photo electric / Heat detectors of Apollo make along with mounting base and junction boxes. (a) Testing of Smoke/heat sensors for functional performance. (b) De dusting / cleaning of all sensors Periodicity: Yearly Monthly
Cu.Ar.cables 2 core x 1.5 Sq.mm, Checking of cables for proper termination and continuity. Replace damaged cables due to any mechanical or electrical short circuit. Periodicity: Yearly
Manual pull boxes, All the manual pull boxes are to be examined for proper functioning. All the manual pull boxes are to be tested. Periodicity: Monthly
24 Volt Dc Electronic hooters. All the electronic hooters are to be tested for proper functioning, along with fire along control panel. Periodicity: Monthly
Electrical trip to release CO2, All the electrical trip mechanisms are to be tested for proper functioning. All the 24Volt high Ampere coils are to be checked for proper function. Periodicity: Monthly
Mechanical trip, All the mechanical trip mechanisms are to be checked for free movement and lock pin arrangement. Carry out greasing and cleaning as required for all the opening mechanisms. Periodicity: Monthly.
Manual call points, Push buttons to be replaced with new ones and Broken glasses to be replaced, Functional tests to be carried out and proved. Periodicity: Monthly
Directional valves (NRV), All the directional valves is to be cleaned with high-pressure air to remove any choking. Periodicity: Monthly
CO2 Nozzle, All the CO2 discharge nozzles are to be blow in with compressed air to remove any foreign deposits. Periodicity: Monthly
High pressure braided hose, Interconnection hoses are to be checked for proper connection and if found damaged, the same one to be replaced with new one. Periodicity: Monthly
Pipe network, Entire pipe network is to be scrapped with one coat of red oxide and two coats of signal red. Periodicity: Yearly
45 Kg CO2 cylinders, CO2 cylinders are to be disconnected from the cylinder bank and weighed, and if found any weight difference to an extend of 10% it is to be refilled with 99% pure CO2. All the cylinder release valves are to be tested for proper functioning after isolating the CO2 cylinder (Dummy test). Periodicity: Yearly
CO2 cylinder valves, All the cylinder valves are to be visually checked for proper connections. Periodicity: Yearly
CAMC of the Fire Alarm and Detection system and CO2 firefighting system at Building 62 (440V, 60Hz Converter network), YARD UTILITY Department. Location: - Building 62 (440V, 60Hz Converter network), YARD UTILITY Department. Microprocessor based networking type Fire alarm control panel with supply unit heavy duty Battery charger, Tested and proved functionally. Unit confirm to IS: 2189. Periodicity: Monthly
02 Nos. batteries (12V 07AH) check the termination and connections Periodicity: Weekly
Ionization / Photo electric / Heat detectors of Apollo make along with mounting base and junction boxes. (a) Testing of Smoke/heat sensors for functional performance. (b) De dusting / cleaning of all sensors Periodicity: Yearly Monthly
Cu.Ar.cables 2 core x 1.5 Sq.mm, Checking of cables for proper termination and continuity. Replace damaged cables due to any mechanical or electrical short circuit. Periodicity: Yearly
24 Volt Dc Electronic hooters. All the electronic hooters are to be tested for proper functioning, along with fire along control panel. Periodicity: Monthly
Electrical trip to release CO2, all the electrical trip mechanisms are to be tested for proper functioning. All the 24Volt high Ampere coils are to be checked for proper function. Periodicity: Monthly
Mechanical trip, All the mechanical trip mechanisms are to be checked for free movement and lock pin arrangement. Carry out greasing and cleaning as required for all the opening mechanisms. Periodicity: Monthly
Manual call points, Push buttons to be replaced with new ones and Broken glasses to be replaced, Functional tests to be carried out and proved. Periodicity: Monthly
Directional valves (NRV), All the directional valves is to be cleaned with high-pressure air to remove any choking. Periodicity: Monthly
CO2 Nozzle, All the CO2 discharge nozzles are to be blow in with compressed air to remove any foreign deposits. Periodicity: Monthly
High pressure braided hose, Interconnection hoses are to be checked for proper connection and if found damaged, the same one to be replaced with new one. Periodicity: Monthly
Pipe network, Entire pipe network is to be scrapped with one coat of red oxide and two coats of signal red. Periodicity: Yearly
45 Kg CO2 cylinders, CO2 cylinders are to be disconnected from the cylinder bank and weighed, and if found any weight difference to an extend of 10% it is to be refilled with 99% pure CO2. All the cylinder release valves are to be tested for proper functioning after isolating the CO2 cylinder (Dummy test). Periodicity: Six monthly
CO2 cylinder valves, All the cylinder valves are to be visually checked for proper connections. Periodicity: Yearly
CAMC of the Fire Alarm and Detection system at Telephone exchange, YARD UTILITY Department. Location: - Telephone exchange, YARD UTILITY Department. Microprocessor based networking type Fire alarm control panel with supply unit heavy duty Battery charger, Tested and proved functionally along with auto dialer. Unit confirm to IS: 2189. Periodicity: Monthly
02 Nos. batteries (12V 07AH) check the termination and connections Periodicity: Weekly
Ionization / Photo electric / Heat detectors along with mounting base and junction boxes. Testing of Smoke/heat sensors for functional performance. De dusting / cleaning of all sensors. Periodicity: Yearly Monthly
Manual call points Push buttons to be replaced with new ones along with frames and civil works. Broken glasses to be replaced Functional tests to be carried out and proved. Periodicity: Monthly
Electronic hooters (Buzzers /Alarm) Repaired by replacement if defective components. To be proved for functionally. Periodicity: Monthly
Cables: Entire electrical cabling is to be checked for continuity and repair or replacement to be under taken wherever necessary. Mat 2x1.5 sq.mm copper PVC cable conforming to IS:1554 specification. Periodicity: Yearly
CAMC of the Fire Alarm and Detection system and CO2 firefighting system at Building 07 –ECE Department. Location: - Building 07 –ECE Department. Microprocessor based networking type Fire alarm control panel with supply unit heavy duty Battery charger, Tested and proved functionally. Unit confirm to IS: 2189. Periodicity: Monthly
02 Nos. batteries (12V 07AH) check the termination and connections Periodicity: Weekly
Ionization / Photo electric / Heat detectors along with mounting base and junction boxes. (a) Testing of Smoke/heat sensors for functional performance. (b) De dusting / cleaning of all sensors Periodicity: Yearly Monthly
Cu.Ar.cables 2 core x 1.5 Sq.mm, Checking of cables for proper termination and continuity. Replace damaged cables due to any mechanical or electrical short circuit. Periodicity: Yearly
Manual pull boxes, All the manual pull boxes are to be examined for proper functioning. All the manual pull boxes are to be tested. Periodicity: Monthly
24 Volt Dc Electronic hooters. All the electronic hooters are to be tested for proper functioning, along with fire along control panel Periodicity: Monthly
Electrical trip to release CO2, all the electrical trip mechanisms are to be tested for proper functioning. All the 24Volt high Ampere coils are to be checked for proper function. Periodicity: Monthly
Mechanical trip, All the mechanical trip mechanisms are to be checked for free movement and lock pin arrangement. Carry out greasing and cleaning as required for all the opening mechanisms. Periodicity: Monthly
Manual call points, Push buttons to be replaced with new ones and Broken glasses to be replaced, Functional tests to be carried out and proved. Periodicity: Monthly
Directional valves (NRV), All the directional valves is to be cleaned with high-pressure air to remove any choking. Periodicity: Monthly
CO2 Nozzle, All the CO2 discharge nozzles are to be blow in with compressed air to remove any foreign deposits. Periodicity: Monthly
High pressure braided hose, Interconnection hoses are to be checked for proper connection and if found damaged, the same one to be replaced with new one. Periodicity: Monthly
Pipe network, Entire pipe network is to be scrapped with one coat of red oxide and two coats of signal red. Periodicity: Yearly
45 Kg CO2 cylinders, CO2 cylinders are to be disconnected from the cylinder bank and weighed, and if found any weight difference to an extend of 10% it is to be refilled with 99% pure CO2. All the cylinder release valves are to be tested for proper functioning after isolating the CO2 cylinder (Dummy test). Periodicity: Six monthly
CO2 cylinder valves, All the cylinder valves are to be visually checked for proper connections. Periodicity: Yearly
CAMC of the Fire Alarm and Detection system at Thyristor panel room, ECE Department. Location: - Thyristor panel room, ECE Department. Microprocessor based networking type Fire alarm control panel with supply unit heavy duty Battery charger, Tested and proved functionally along with auto dialer. Unit confirm to IS: 2189. Periodicity: Monthly
02 Nos. batteries (12V 07AH) check the termination and connections Periodicity: Weekly
IR/Beam detectors along with mounting base and junction boxes. Testing of Smoke/heat sensors for functional performance. De dusting / cleaning of all sensors. Periodicity: Yearly Monthly
Manual call points Push buttons to be replaced with new ones along with frames and civil works. Broken glasses to be replaced Functional tests to be carried out and proved. Periodicity: Monthly
Electronic hooters (Buzzers /Alarm) Repaired by replacement if defective components. To be proved for functionally. Periodicity: Monthly
Cables: Entire electrical cabling is to be checked for continuity and repair or replacement to be under taken wherever necessary. Mat 2x1.5 sq.mm copper PVC cable conforming to IS: 1554 specification. Periodicity: Yearly
AMC of the Fire Alarm and Detection system at Building 43, DB Department Location: - Building 43, DB Department Microprocessor based networking type Fire alarm control panel with supply unit heavy duty Battery charger, Tested and proved functionally along with auto dialer. Unit confirm to IS: 2189. Periodicity: Monthly
02 Nos. batteries (12V 07AH) check the termination and connections Periodicity: Weekly
Smoke / Heat detectors along with mounting base and junction boxes. Testing of Smoke/heat sensors for functional performance. De dusting / cleaning of all sensors. Periodicity: Yearly Monthly
Manual call points Push buttons to be replaced with new ones along with frames and civil works. Broken glasses to be replaced Functional tests to be carried out and proved. Periodicity: Monthly
Electronic hooters (Buzzers /Alarm) Repaired by replacement if defective components. To be proved for functionally. Periodicity: Monthly
Cables: Entire electrical cabling is to be checked for continuity and repair or replacement to be under taken wherever necessary. Mat 2x1.5 sq.mm copper PVC cable conforming to IS: 1554 specification. Periodicity: Yearly
CAMC of the Fire Alarm and Detection system and CO2 firefighting system at GTR Department. Location: - GTR Department. Microprocessor based networking type Fire alarm control panel with supply unit heavy duty Battery charger, Tested and proved functionally. Unit confirm to IS: 2189. Periodicity: Monthly
02 Nos. batteries (12V 07AH) check the termination and connections Periodicity: Weekly
Smoke / Heat detectors along with mounting base and junction boxes. (a) Testing of Smoke/heat sensors for functional performance. (b) De dusting / cleaning of all sensors Periodicity: Yearly Monthly
Cu.Ar.cables 2 core x 1.5 Sq.mm, Checking of cables for proper termination and continuity. Replace damaged cables due to any mechanical or electrical short circuit. Periodicity: Yearly
Manual pull boxes, All the manual pull boxes are to be examined for proper functioning. All the manual pull boxes are to be tested. Periodicity: Monthly
24 Volt Dc Electronic hooters. All the electronic hooters are to be tested for proper functioning, along with fire along control panel. Periodicity: Monthly
Electrical trip to release CO2, all the electrical trip mechanisms are to be tested for proper functioning. All the 24Volt high Ampere coils are to be checked for proper function. Periodicity: Monthly
Pilot cylinders are to be disconnected from the cylinder bank and weighed, and if found any weight difference to an extend of 10% it is to be refilled with 99% pure CO2. All the cylinder release valves are to be tested for proper functioning after isolating the CO2 cylinder. Periodicity: Monthly
Manual call points, Push buttons to be replaced with new ones and Broken glasses to be replaced, Functional tests to be carried out and proved. Periodicity: Monthly
Directional valves (NRV), All the directional valves is to be cleaned with high-pressure air to remove any choking. Periodicity: Monthly
CO2 Nozzle, All the CO2 discharge nozzles are to be blow in with compressed air to remove any foreign deposits. Periodicity: Monthly
High pressure braided hose, Interconnection hoses are to be checked for proper connection and if found damaged, the same one to be replaced with new one. Periodicity: Monthly.
Pipe network, Entire pipe network is to be scrapped with one coat of red oxide and two coats of signal red. Periodicity: Yearly
45 Kg CO2 cylinders, CO2 cylinders are to be disconnected from the cylinder bank and weighed, and if found any weight difference to an extend of 10% it is to be refilled with 99% pure CO2.at extra cost. All the cylinder release valves are to be tested for proper functioning after isolating the CO2 cylinder (Dummy test). Periodicity: Six monthly
CO2 cylinder valves, All the cylinder valves are to be visually checked for proper connections. Periodicity: Yearly
CAMC of the Fire Alarm and Detection system at RAC Department. Location: - RAC Department Microprocessor based networking type Fire alarm control panel with supply unit heavy duty Battery charger, Tested and proved functionally. Unit confirm to IS: 2189. Periodicity: Monthly
02 Nos. batteries (12V 07AH) check the termination and connections Periodicity: Weekly
Smoke / Heat detectors along with mounting base and junction boxes. Testing of Smoke/heat sensors for functional performance. De dusting / cleaning of all sensors. Periodicity: Yearly Monthly
Manual call points Push buttons to be replaced with new ones along with frames and civil works. Broken glasses to be replaced Functional tests to be carried out and proved. Periodicity: Monthly
Electronic hooters (Buzzers /Alarm) Repaired by replacement if defective components. To be proved for functionally. Periodicity: Monthly
Cables: Entire electrical cabling is to be checked for continuity and repair or replacement to be under taken wherever necessary. Mat 2x1.5 sq.mm copper PVC cable conforming to IS: 1554 specification. Periodicity: Yearly
CAMC of the Fire Alarm and Detection system at MCD Department Location: - MCD Department Microprocessor based addressable networking type Fire alarm control panel with supply unit heavy duty Battery charger, Tested and proved functionally. Unit confirm to IS: 2189. Periodicity: Monthly
02 Nos. batteries (12V 07AH) check the termination and connections Periodicity: Weekly
Addressable Ionization / Photo electric / Heat detectors of Apollo make along with mounting base and junction boxes. Testing of Smoke/heat sensors for functional performance. De dusting / cleaning of all sensors. Periodicity: Yearly Monthly
Addressable Manual call points Push buttons to be replaced with new ones along with frames and civil works. Broken glasses to be replaced Functional tests to be carried out and proved. Periodicity: Monthly
Addressable Electronic hooters (Buzzers /Alarm) Repaired by replacement if defective components. To be proved for functionally. Periodicity: Monthly
Cables: Entire electrical cabling is to be checked for continuity and repair or replacement to be under taken wherever necessary. Mat 2x1.5 sq.mm copper PVC cable conforming to IS: 1554 specification. Periodicity: Yearly
AMC of the Fire Alarm and Detection system at Fuel complex, MMAT Department Location: - Fuel complex –Pump house Microprocessor based Addressable type Fire alarm control panel with supply unit heavy duty Battery charger, Tested and proved functionally. Unit confirm to IS: 2189. Periodicity: Monthly
02 Nos. batteries (12V 07AH) check the termination and connections Periodicity: Weekly
Addressable Ionization / Photo electric / Heat detectors of Apollo make along with mounting base and junction boxes. (a) Testing of Smoke/heat sensors for functional performance. (b) De dusting / cleaning of all sensors. Periodicity: Yearly Monthly
Addressable Manual call points Push buttons to be replaced with new ones along with frames and civil works. Broken glasses to be replaced Functional tests to be carried out and proved. Periodicity: Monthly
Addressable Electronic hooters (Buzzers /Alarm) Repaired by replacement if defective components. To be proved for functionally. Periodicity: Monthly
Addressable Electronic hooters (Buzzers /Alarm) Repaired by replacement if defective components. To be proved for functionally. Periodicity: Monthly
Cables: Entire electrical cabling is to be checked for continuity and repair or replacement to be under taken wherever necessary. Mat 2x1.5 sq.mm copper PVC cable conforming to IS: 1554 specification. Periodicity: Yearly
CAMC of the Fire Alarm and Detection system at SDD Pump house, DS Department Location: - DS Department Microprocessor based networking type Fire alarm control panel with supply unit heavy duty Battery charger, Tested and proved functionally. Unit confirm to IS: 2189. Periodicity: Monthly
02 Nos. batteries (12V 07AH) check the termination and connections Periodicity: Weekly
Smoke / Heat detectors along with mounting base and junction boxes. (a) Testing of Smoke/heat sensors for functional performance. (b) De dusting / cleaning of all sensors. Periodicity: Yearly Monthly
Manual call points Push buttons to be replaced with new ones along with frames and civil works. Broken glasses to be replaced Functional tests to be carried out and proved. Periodicity: Monthly
Electronic hooters (Buzzers /Alarm) Repaired by replacement if defective components. To be proved for functionally. Periodicity: Monthly
Cables: Entire electrical cabling is to be checked for continuity and repair or replacement to be under taken wherever necessary. Mat 2x1.5 sq.mm copper PVC cable conforming to IS: 1554 specification. Periodicity: Yearly
CAMC of the Fire Alarm and Detection system at NDD pump house, DS Department Location: - DS Department Microprocessor based networking type Fire alarm control panel with supply unit heavy duty Battery charger, Tested and proved functionally. Unit confirm to IS: 2189. Periodicity: Monthly
02 Nos. batteries (12V 07AH) check the termination and connections Periodicity: Weekly
Smoke / Heat detectors along with mounting base and junction boxes. Testing of Smoke/heat sensors for functional performance. De dusting / cleaning of all sensors. Periodicity: Yearly Monthly
Manual call points Push buttons to be replaced with new ones along with frames and civil works. Broken glasses to be replaced Functional tests to be carried out and proved. Periodicity: Monthly
Electronic hooters (Buzzers /Alarm) Repaired by replacement if defective components. To be proved for functionally. Periodicity: Monthly
Cables: Entire electrical cabling is to be checked for continuity and repair or replacement to be under taken wherever necessary. Mat 2x1.5 sq.mm copper PVC cable conforming to IS: 1554 specification. Periodicity: Yearly
CAMC of the Fire Alarm and Detection system and clean agent firefighting ststem at DERF, PGS department. Location: - MPGS Department Microprocessor based networking type Fire alarm control panel with supply unit heavy duty Battery charger, Tested and proved functionally. Unit confirm to IS: 2189. Periodicity: Monthly
02 Nos. batteries (12V 07AH) check the termination and connections Periodicity: Weekly
Smoke / Heat detectors along with mounting base and junction boxes. (a) Testing of Smoke/heat sensors for functional performance. (b) De dusting / cleaning of all sensors Periodicity: Yearly Monthly
IR/UV detectors along with mounting base and junction boxes. Testing of IR /UV sensors for functional performance. De dusting / cleaning of all sensors
Cu.Ar.cables 2 core x 1.5 Sq.mm, Checking of cables for proper termination and continuity. Replace damaged cables due to any mechanical or electrical short circuit. Periodicity: Yearly
24 Volt Dc Electronic hooters. All the electronic hooters are to be tested for proper functioning, along with fire along control panel Periodicity: Monthly
Manual call points, Push buttons to be replaced with new ones and Broken glasses to be replaced, Functional tests to be carried out and proved. Periodicity: Monthly
Directional valves (NRV), All the directional valves is to be cleaned with high-pressure air to remove any choking. Periodicity: Monthly
HFC-227e Nozzle, All the HFC-227e discharge nozzles are to be blow in with compressed air to remove any foreign deposits. Periodicity: Monthly
High pressure braided hose, Interconnection hoses are to be checked for proper connection and if found damaged, the same one to be replaced with new one. Periodicity: Monthly
Pipe network, Entire pipe network is to be scrapped with one coat of red oxide and two coats of signal red. Periodicity: Yearly
80Ltr cylinders, HFC-227e cylinders are to be disconnected from the cylinder bank and weighed, and if found any weight difference to an extend of 10% it is to be refilled with 99% pure HFC-227e. All the cylinder release valves are to be tested for proper functioning after isolating the HFC-227e cylinder (Dummy test). Periodicity: Six monthly
HFC-227e cylinder valves, All the cylinder valves are to be visually checked for proper connections. Periodicity: Yearly
AMC Of The Fire Alarm and Detection system and Water Sprinkler System at Wood storage area Building 21.Ds Department.(New) Location: - DRY DOCK AND SLIPWAY Dept. -21Bldg, (New) Addressable type Microprocessor based networking type Fire alarm control panel with supply unit heavy duty Battery charger, Tested and proved functionally. Unit confirm to IS: 2189. Periodicity: Monthly
Addressable Ionization / Photo electric / Heat detectors of Apollo make along with mounting base and junction boxes. Testing of Smoke/heat sensors for functional performance. De dusting / cleaning of all sensors. Periodicity: Yearly Monthly
Addressable Manual Call Points with LED indications. Painted signal red. All the manual call points are to be examined for proper functioning. Periodicity: Monthly
Addressable type 24Volt Dc Electronic hooter. All the electronic hooters are to be tested for proper functioning, along with fire along control panel. Periodicity: Monthly
Cu.Ar.cables 2 core x 1.5 Sq.mm Checking of cables for proper termination and continuity. Replace damaged cables due to any mechanical or electrical short circuit. Periodicity: Six monthly
Water Sprinkler, in Brass material ½” BSPT end connection, Pendent type with UL and C UL listed, FM, LPCB and NYC approved maximum working pressure 175psi. Periodicity: Monthly
Alarm valve model – A, UL listed for Vertical inlet to Horizontal outlet mounting, Cast iron material flanged end to ANSI B16.1, Class 125, without any trim, Size 80NB. Periodicity: Monthly
24 Volt solenoid valves of ½” port. Periodicity: Monthly
Pressure Gauge and allied accessories. Periodicity: Monthly
Revisioning of Sluice valves / Globe valves (a) 80mm Periodicity: Monthly
b) 32mm Periodicity: Monthly
Cleaning of “Y” Type Strainers 80 NB Periodicity: Monthly
Painting of the entire system with one coat of Red oxide and two coats of red enamel paint. Periodicity: Yearly
newton electro technics
MVV Prasad
FIELD TECH ENGINEERS AND CONTRACTORS
ALFATRONIC MARINE AUTOMATION SERVICES
POSITIVE CONTROLS
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .