Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹11.1 LAccepted-AOC | ₹11.1 L | L1 | Accepted-AOC L1 IS CONSIDERED FOR ORDER PLACEMENT |
| Sl No | Description | Qty | Unit | Tetra Dynamic Infrastructure L1 |
|---|---|---|---|---|
| 1.00Description of work | ||||
| 1.01 | Providing and fixing double layer pipe scaffolding for Guniting work, using 50mm pipes & clamps with horizontals and verticals @ 1.5m c/c with suitable bracings. MS platform shall be laid at required level. After completion of work same shall be removed all complete as per the instructions of Engineer in charge.
Providing and fixing double layer pipe scaffolding for Guniting work, using 50mm pipes & clamps with horizontals and verticals @ 1.5m c/c with suitable bracings. MS platform shall be laid at required level. After completion of work same shall be removed all complete as per the instructions of Engineer in charge. | 291 | M2 | 735 ₹2,13,885 Lowest |
| 1.02 | Gunniting of RCC Structures at Plant including the cost Material , labour, equipment hire and supervision charges for Guniting, after chipping and removing loose concrete particles, cleaning the surface dust free, Anti corrosive zinc rich primer ReArm Coar ZP mfd by M/s. MYK Arment shall be applied of exposed reinforcement, fixing 60mm X 60mm X 2.8mm welded mesh (or nearby size available in market and applying tack coat of Epoxy bonding agent ReArm bond EBA mfd by M/s. MYK arment. Guniting dry mix shall be (1cement : 4 M. Sand : 1 6mm down aggregate) and average thickness of shotcrete layer shall be 32mm. Water curing shall be provided on treated surface, all complete as per the instructions of Engineer in charge. (Cement will be supplied free of cost by M/s Malabar
Cement ) | 190 | M2 | 3,000 ₹5,70,000 Lowest |
| 1.03 | Providing Labour, Equipment hire and supervision charges for chipping and removing loose concrete layer for RCC Colums Jacketting / Encasement from beams and columns, in order to expose the existing reinforcement and cleaning the surface dust free, all complete as per the instructions of Engineers in charge | 27 | M2 | 350 ₹9,450 Lowest |
| 1.04 | Providing, cutting, bending, fixing and tying approved grade reinforcement,for RCC Colums Jacketting / Encasement, all complete as per the instructions of Engineer in Charge | 200 | Kg | 120 ₹24,000 Lowest |
| 1.05 | Supply and application of anti corrosive zinc rich primer ReArm Coat ZP Mfd by M/s. MYK Arment over the exposed steel reinforcement as per the manufactures specification and as directed by Engineer in charge | 195 | RM | 40 ₹7,800 Lowest |
| 1.06 | Providing and fixing reinforcement to concrete (rebar) using Polyester resin grout ArmGrout HF 66 mfd by M/s. MYK arment, after drilling sufficient holes and cleaning the holes dust free, all complete as per the instructions of Engineer in charge | 20 | Nos | 130 ₹2,600 Lowest |
| 1.07 | Supply and application of tack coat of Epoxy bonding agent Rearm Bond EBA mfd by M/s. MYK Arment on Existing concrete surface, after cleaning the surface dust free, all complete as per instruction of Engineer in
charge. | 27 | M2 | 565 ₹15,255 Lowest |
| 1.08 | Providing & fixing water tight shutters by allowing 60mm clear cover from existing concrete surface with necessary support, for RCC Colums Jacketting / Encasement, all complete as per the instructions of Engineer in charge | 37 | M2 | 1,150 ₹42,550 Lowest |
| 1.09 | Providing, mixing and Pouring free flow micro concrete for RCC Colums Jacketting / Encasement- ReArm crete MC mfd by M/s MYK Arment,After mixing the same with water and 6mm down aggregate @ 10% by weight of micro concrete. water base curing compound shall be applied immediately after shutter removal, all complete as per the instructions of Engineers in charge | 37 | M2 | 6,790 ₹2,51,230 Lowest |
Tender Value
Refer Docs
EMD Value
₹30,320
Closing Date
9 Jun 2026, 5:00 pmClosed
MANAGING DIRECTOR
MALABAR CEMENTS LTD, WALAYAR PO, PALAKKAD
Rehabilitation of RCC Structures at Various Buildings at Plant-Phase-I
2026_MCL_847626_3
MCL/S/E/PCE/04/2025-26
Open Tender
Miscellaneous Services
Item Rate
180 days
MALABAR CEMENTS LTD, WALAYAR PO
Please refer to tender document
5 documents required · 5 mandatory
₹2,950
₹30,320
15 Jul 2026
15 May 2026
11 Jun 2026
15 May 2026
9 Jun 2026
15 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Description of work | |||||
| 1.01 | Providing and fixing double layer pipe scaffolding for Guniting work, using 50mm pipes & clamps with horizontals and verticals @ 1.5m c/c with suitable bracings. MS platform shall be laid at required level. After completion of work same shall be removed all complete as per the instructions of Engineer in charge.
Providing and fixing double layer pipe scaffolding for Guniting work, using 50mm pipes & clamps with horizontals and verticals @ 1.5m c/c with suitable bracings. MS platform shall be laid at required level. After completion of work same shall be removed all complete as per the instructions of Engineer in charge. | 291 | M2 | - | - |
| 1.02 | Gunniting of RCC Structures at Plant including the cost Material , labour, equipment hire and supervision charges for Guniting, after chipping and removing loose concrete particles, cleaning the surface dust free, Anti corrosive zinc rich primer ReArm Coar ZP mfd by M/s. MYK Arment shall be applied of exposed reinforcement, fixing 60mm X 60mm X 2.8mm welded mesh (or nearby size available in market and applying tack coat of Epoxy bonding agent ReArm bond EBA mfd by M/s. MYK arment. Guniting dry mix shall be (1cement : 4 M. Sand : 1 6mm down aggregate) and average thickness of shotcrete layer shall be 32mm. Water curing shall be provided on treated surface, all complete as per the instructions of Engineer in charge. (Cement will be supplied free of cost by M/s Malabar
Cement ) | 190 | M2 | - | - |
| 1.03 | Providing Labour, Equipment hire and supervision charges for chipping and removing loose concrete layer for RCC Colums Jacketting / Encasement from beams and columns, in order to expose the existing reinforcement and cleaning the surface dust free, all complete as per the instructions of Engineers in charge | 27 | M2 | - | - |
| 1.04 | Providing, cutting, bending, fixing and tying approved grade reinforcement,for RCC Colums Jacketting / Encasement, all complete as per the instructions of Engineer in Charge | 200 | Kg | - | - |
| 1.05 | Supply and application of anti corrosive zinc rich primer ReArm Coat ZP Mfd by M/s. MYK Arment over the exposed steel reinforcement as per the manufactures specification and as directed by Engineer in charge | 195 | RM | - | - |
| 1.06 | Providing and fixing reinforcement to concrete (rebar) using Polyester resin grout ArmGrout HF 66 mfd by M/s. MYK arment, after drilling sufficient holes and cleaning the holes dust free, all complete as per the instructions of Engineer in charge | 20 | Nos | - | - |
| 1.07 | Supply and application of tack coat of Epoxy bonding agent Rearm Bond EBA mfd by M/s. MYK Arment on Existing concrete surface, after cleaning the surface dust free, all complete as per instruction of Engineer in
charge. | 27 | M2 | - | - |
| 1.08 | Providing & fixing water tight shutters by allowing 60mm clear cover from existing concrete surface with necessary support, for RCC Colums Jacketting / Encasement, all complete as per the instructions of Engineer in charge | 37 | M2 | - | - |
| 1.09 | Providing, mixing and Pouring free flow micro concrete for RCC Colums Jacketting / Encasement- ReArm crete MC mfd by M/s MYK Arment,After mixing the same with water and 6mm down aggregate @ 10% by weight of micro concrete. water base curing compound shall be applied immediately after shutter removal, all complete as per the instructions of Engineers in charge | 37 | M2 | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.08 MB
DOCUMENT.pdf
Tender Documents • 0.18 MB
BOQ_1438143.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .