This is an item rate tender and the scope of work covers the various operation and maintenance activities including, cleaning of solar PV modules, vegetation control etc., for the 12.6MWp and 5.6MWP solar PV installations.
2026_CIL_869562_1
CIL/SPV/OM/2026-27/04
Open Tender
Facility Management Services
Item Rate
Cochin International Airport
Please refer Tender documents.
8 documents required · 8 mandatory
₹1,180
₹1.5 L
Office of CIAL Infrastructures Limited
14 Sept 2026
14 Sept 2026
6 Oct 2026
14 Sept 2026
5 Oct 2026
22 Sept 2026
14 Sept 2026 - 20 Sept 2026
21 Sept 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1For Plant- A (12.6MWp) Operation and Maintenance of the Solar PV Installations including plant components such as solar PV modules, connectors, DC string cables, String Monitoring Boxes, Solar PV Inverters, Inverter isolation box, DC feeder cables, LT/HT cables, Compact sub-stations/Transformers, LT/HT panels, etc. (excluding the breakdown maintenance of the plant components under the scope of the employer as detailed in the technical specifications), by deploying sufficient technical and non-technical manpower and tools / equipment / spares etc., as per tender specifications and following the Standard Operating Procedures issued by the Employer. The rate shall also include: 1. Deployment of adequate number of technical and non-technical manpower for the efficient operation and maintenance of the Solar Installation as per Technical Specifications of Contract. 2. DC restoration works such as MC4 connectors, laying DC cables, terminations, conduits and all other components including excavation and refilling etc., for laying the cables as per Technical Specifications of Contract. 3. Routine maintenance of all plant components including periodic scanning / testing. 4. Cleaning of solar PV modules as per technical specifications. (Refer Clause No. 5 of TSC) 5. Vegetation control and grass cutting, as per technical specifications. (Refer Clause No. 5 and 6 of TSC) 6. Replacement of any spare components including labour, consumables, etc., as per requirements (Refer Clause No. 1.2 of TSC) 7. Any other activities as per tender conditions and also for maximising energy generation by maintaining high Performance Ratios. The rate has to be quoted on a per month basis for each year, commencing from the date of handing over of the plants for 2 (two) years. | |||||
| 1.01 | First Year | 12 | Months | 2,66,161 | ₹31,93,932 |
| 1.02 | Second Year | 12 | Months | 2,82,131 | ₹33,85,572 |
| 2For Plant- B (5.6MWp) Operation and Maintenance of the Solar PV Installations including plant components such as solar PV modules, connectors, DC string cables, String Monitoring Boxes, Solar PV Inverters, Inverter isolation box, DC feeder cables, LT/HT cables, Compact sub-stations/Transformers, LT/HT panels, etc. (excluding the breakdown maintenance of the plant components under the scope of the employer as detailed in the technical specifications), by deploying sufficient technical and non-technical manpower and tools / equipment / spares etc., as per tender specifications and following the Standard Operating Procedures issued by the Employer. The rate shall also include: 1. Deployment of adequate number of technical and non-technical manpower for the efficient operation and maintenance of the Solar Installation as per Technical Specifications of Contract. 2. DC restoration works such as MC4 connectors, laying DC cables, terminations, conduits and all other components including excavation and refilling etc., for laying the cables as per Technical Specifications of Contract. 3. Routine maintenance of all plant components including periodic scanning / testing. 4. Cleaning of solar PV modules as per technical specifications. (Refer Clause No. 5 of TSC) 5. Vegetation control and grass cutting, as per technical specifications. (Refer Clause No. 5 and 6 of TSC) 6. Replacement of any spare components including labour, consumables, etc., as per requirements (Refer Clause No. 1.2 of TSC) 7. Any other activities as per tender conditions and also for maximising energy generation by maintaining high Performance Ratios. The rate has to be quoted on a per month basis for each year, commencing from the date of handing over of the plants for 2 (two) years. | |||||
| 2.01 | First Year | 12 | Months | 1,19,021 | ₹14,28,252 |
| 2.02 | Second Year | 12 | Months | 1,26,162 | ₹15,13,944 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.26 MB
Tender.pdf
Tender Documents • 1.40 MB
BOQ_1473475.xls
BOQ • 0.39 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .