Demolition of existing RCC ESR at Modsar HW & Demolition of existing RCC ESR of 10.00 Lac. Liter capacity & 15 mt. height @ Rambaug H/w and Demolition of Pump House and Staff Quarters at various Locations Under M & R 2026-27 programme ( Anjar RWSS Scheme and Kandla- Gandhidham RWSS Scheme)
341033
06 /2026-27
Open
Civil Works - Water Works
Works
Kutch
7 documents required · 7 mandatory
₹600
The Executive Engineer, P H Works Division, GWSSB, Anjar – Kutch
₹3,440
1 Sept 2026
1 Sept 2026
1 Sept 2026
16 Sept 2026
1 Sept 2026
Name of Work: “Demolition of existing RCC ESR at Modsar HW & Demolition of existing
RCC ESR of 10.00 Lac. Liter capacity & 15 mt. height @ Rambaug H/w and Demolition of
Pump House and Staff Quarters at various locations “ANJAR REGIONAL WATER SUPPLY
SCHEME & M & R to KANDLA - GANDHIDHAM REGIONAL WATER SUPPLY SCHEME,: “M
Estimated Cost: Rs. 3,43,939.10/-
Executive Engineer
Gujarat Water Supply & Sewerage Board
Public Health Works Division
Anjar - 370110, Gujarat
Volume-III, PRICE BID M&R of NMC Based BK-4 Ph-2A RWSS
Bid Documents for Design, Build & Operate Contract for
BREAK UP FOR INTERIM PAYMENTS .................................................
Volume-III, PRICE BID M&R of NMC Based BK-4 Ph-2A RWSS
Name of Work:- “Demolition of existing RCC ESR at Modsar HW & Demolition of existing
RCC ESR of 10.00 Lac. Liter capacity & 15 mt. height @ Rambaug H/w and Demolition of
Pump House and Staff Quarters at various locations “ANJAR REGIONAL WATER SUPPLY
SCHEME & M & R to KANDLA - GANDHIDHAM REGIONAL WATER SUPPLY SCHEME,: “M
(1) The bidder shall quote his firm and fixed price for the entire work under this
Contract, defined in more details in various sections of this bid document.
(2) The rates and prices shall be submitted in the electronic formats given by n-procure
which is called Schedule-B. Rates and prices received in any other formats will be
rejected and the Bids will be disqualified.
(3) It will be entirely at the discretion of the Employer to accept or reject the bidder’s
proposal, without giving any reasons whatsoever and the bidder shall not be
permitted to withdraw his bid on this account.
supplied from the by client.
(5) In Schedule-B the Bidder shall quote prices for the items on lump sum / unit rate as
called for against the BOQ item.
Schedule-B only will be considered for price evaluation & shall form a part of the
Contract Agreement.
Schedule-B and shall be carried forward to Schedule-B for comparison and
(8) The Bidder shall quote his prices for Operation & Maintenance in Schedule-C.
Bidder shall give year wise break up of cost for 5 years O&M in Schedule-C/1 to
Schedule-C/5 separately for Schedule-C. The total shall be in line to the price quoted
in Schedule-C. The total shall be carried forward to Schedule-B for comparison and
(9) Wherever for a particular item the quantities have been specified payment shall be on
unit rate basis and unit variation in quantity will be paid with pro rata basis.
(10) Each item is to be individually priced online and the amounts shall be added up to
shall be left blank except where the item description requires the item to be priced on
"as applicable” basis. The item shall not be priced if it is “not applicable” to the
bidder’s design, in which case the bidder shall add the words “NOT APPLICABLE”.
The wording in the item description is for subject matter guidance only; clause
references are indicative only and all other relevant clauses shall also be referred to.
The prices shall allow for all the works covered under the bid and all liabilities and
contractual obligations whether separately specified or not. Items against which no
prices are quoted shall not be separately paid for and the bidder shall be deemed to
have covered the cost of execution of such items (according to the requirements of
the bid document) in the prices quoted for other items.
satisfactory working/safety of the system as specified, will not be separately paid for
by the Employer when executed and shall be deemed to be already covered by other
items and rates listed in the price sheets No extra payment shall be given for any item
which is required to complete and perform the project.
Volume-III, PRICE BID M&R of NMC Based BK-4 Ph-2A RWSS
pendency of the Contract. In case of any discrepancy noted in the various price
schedules, those in Schedule B will be considered and binding on the Contractor. The
any will be considered for financial evaluation of the bid.
(13) Schedule ‘D gives the basis of interim payment for construction of works.
(14) The bidder shall be deemed to have allowed in his price for provision, maintenance
and final removal of all temporary works of whatsoever nature required for
construction including temporary bunds, diverting water, pumping, de-watering etc.
for the proper execution of works. The rates shall also be deemed to include any
works and setting out that may be required to be carried out for laying out of all the
works involved.
(15) Prices shall be filled online only.
the Specifications and other sections of these bid documents and these documents are
to be taken as mutually explanatory of one another.
(17) The bidder shall interpret the data furnished and carry out any additional survey
work, or investigation work required at his own cost.
(18) The prices quoted shall also include the cost of materials utilized for testing.
(19) The bidder should acquaint himself with the site conditions including the access to
Work site. The successful bidder shall have to make suitable access to work sites at
his own cost. These accesses will be used by the other contractors working for
prices shall include all the equipments / materials / accessories and services required
(21) The amount to be quoted for O & M / year shall be as per Volume-IB, General
Conditions of Contract, Clause No. 1, Security Deposit.
(22) 1% of the value of work will be deducted from the Running bill against labour cess
which is non-refundable.
(23) Third Party Inspection / CSC agency will be deployed by GWSSB and charges of the
same will be borne by GWSSB.
(24) Any expenditure incurred by inspection/ CSC agency for the work misinformed by
the contractor and charges of inspection/ CSC agency without any work due to
misinformation shall be recovered from the contractor.
(25) The prices shall be quoted inclusive of all taxes, royalties and duties prevailing at the
time of submission of the bids. Statutory variation if any during the currency of
contract shall have to borne by the agency which shall be not reimbursed by the
(26) The rates should be quoted Exclusive of GST and all other taxes as per Volume-I (B),
General Conditions of Contract, Clause No.
(27) The rates quoted shall be inclusive of all other taxes but excluding GST, duties which
shall not be paid extra. The TDS shall be deducted at source as per provision of IT
rules and GWSSB policy.
(28) The Bidders shall have to quote the rates in this tender Excluding GST. The
Complete responsibility of taxes, duties, levies rests with the Contractor/Agency
Volume-III, PRICE BID M&R of NMC Based BK-4 Ph-2A RWSS
(29) The process requires that the bidder shall quote his price for the work components
and fix during the entire period of performance of the contract except price variation
allowed for supply of MS/DI/PVC/GI pipe as per Volume-IB Clause No. 59, General
Conditions of Contract.
(30) Payment shall be made for the components for which lump sump prices are quoted,
as per the schedule of payment. Total cost will be worked out on the basis of work
done of individual items and rates quoted against those particular items only.
(31) Royalties: The contractor shall be liable to pay the royalty of the quarried materials/
minerals used in the construction of works at the rates specified in the Narmada
Water Resources, Water Supply & Kalpsar Dept. Resolution No. GEN-2010-595-
(6)- M.I.Cell ( K-1) Dt. 29-4-2011 ( Gujarati Version Copy enclosed) and shall be
recovered from the running bills of the work from time to time and remaining amount
if any shall be recovered from the final bill before releasing the security deposit of the
work. The contractor shall furnish the statement showing the quantity of quarried
materials / minerals from whom purchased (with full address of the seller) and copies
of the bills for purchase to the Executive Engineer of the in charge of the work. The
contractor shall also furnish such additional information as regards royalty payment
to the competent authority.
(32) Agency shall have to take Insurance policy and intimate to GWSSB along with the
evidence within time limit. In case of noncompliance entire responsibility shall be
rest with the agency and required amount shall be recovered from any due amount of
(33) GWSSB can recover penalty amount from the agency for not taking the insurance.
Though the penalty amount is recovered, responsibility of the agency for taking
insurance shall be continued and will not be escaped from the responsibility.
(34) The contractor shall apply fair means of stock maintenance and shall adopt
accounting standard as may be prescribed under GST Act as applicable in the state of
Gujarat. For arriving at the difference in procurement prices due to introduction of
GST it will be open for the Board to ask for original invoices, lorry receipt, weigh
bridge slips, payment details and such other documents as may be required for the
(35) The claim of contractor regarding GST shall have to be backed by documentary
evidence substantiating the actual payment of tax duly certified by the competent tax
authority. The final decision regarding the quantum of claim amount to be recovered
or reimbursed shall be of the competent authority of the GWSSB and shall be binding
on the contractor.
Signature of contractor Executive Engineer
P. H.W Division Anjar
Volume-III, PRICE BID M&R of NMC Based BK-4 Ph-2A RWSS
Bidders are required to fill up all the blank spaces in this Bid Form.
THE EXECUTIVE ENGINEER,
PUBLIC HEALTH WORKS DIVISION,
SUB: “Demolition of existing RCC ESR at Modsar HW & Demolition of existing RCC ESR of
10.00 Lac. Liter capacity & 15 mt. height @ Rambaug H/w and Demolition of Pump House
and Staff Quarters at various locations “ANJAR REGIONAL WATER SUPPLY SCHEME & M
& R to KANDLA - GANDHIDHAM REGIONAL WATER SUPPLY SCHEME,: “M & R to: 2026-
The bidder shall quote his firm and fixed price for the entire work under this Contract,
defined in more details in various sections of this bid document.
1. Having visited the site and examined the Bid Documents, Drawings, Conditions of
Schedules etc. including Addenda/Amendments to the above, for the execution of
the above Contract, we the undersigned offer to design, Engineer, procure,
construct, complete, commission, operate and maintain the whole of the said works
for 5 years from the date of commissioning including defects liability period as given
in Conditions of Contract and in conformity with the drawings, conditions of
Documents, including Addenda Nos.__________ (insert numbers) for Lump sum fixed
price of Rs._________________.
Rupees_____________________________________________) for Construction
including free trial run for three months or such other sum as may be ascertained in
accordance with the conditions.
2. I/We agree that
a) if we fail to provide required facilities to the Employer’s representative or any
other person/Agency by the Employer to perform on his behalf for carrying out the
inspection and testing of materials and workmanship.
b) if we incorporate into the Works, materials before they are tested and approved
by the Engineer’s representative.
Volume-III, PRICE BID M&R of NMC Based BK-4 Ph-2A RWSS
c) if we fail to deliver pure water of required quantity according to the
conditions/stipulations of the Contract, the Engineer will be at liberty to take any
action including termination of Contract and impose at his absolute discretion any
penalties, and/or reject the work.
3. We undertake, if our Bid is accepted, to complete and deliver the works in
accordance with the Contract within _________ months, inclusive of monsoons,
from the date or receipt of Letter of Acceptance issued to us by you.
4. We agree to abide by this Bid for a period of 180 days from the Last date of
submission of the bill and it shall remain binding upon us and may be accepted at
any time before the expiry of that period.
5. In the event of our Bid being accepted, we agree to enter into a formal Contract
Agreement with you incorporating the conditions of Contract there to annex but
until such agreement is prepared this Bid together with your written acceptance
thereof shall constitute a binding Contract between us.
6. We agree, if our Bid is accepted, to furnish performance /Security in the forms and
of value specified in the Clause 1 of Volume-IB, “General Conditions of Contract”.
7. We have independently considered the amounts of liquidated damages shown in
Appendix to Bid and agree that they represent a fair estimate of the damages likely
to be suffered by you in the event of the work not being completed by us in time.
8. We understand that you are not bound to accept the lowest or any Bid you may
(Name of the Person)
Company Seal _____________________
Duly authorized to sign Bid for and on behalf of (fill in block capitals)
Witness Signature ___________________________
Volume-III, PRICE BID M&R of NMC Based BK-4 Ph-2A RWSS
Name of Work : “Demolition of existing RCC ESR at Modsar HW & Demolition of existing
RCC ESR of 10.00 Lac. Liter capacity & 15 mt. height @ Rambaug H/w and Demolition of
Pump House and Staff Quarters at various locations “ANJAR REGIONAL WATER SUPPLY
SCHEME & M & R to KANDLA - GANDHIDHAM REGIONAL WATER SUPPLY SCHEME,: “M
The bidder shall quote his firm and fixed price for the entire work under this Contract, defined
in more details in various sections of this bid document.
Schedule showing the approximately quantity of materials to be supplied to the contractor
and at the government store for the or to be executed by contractor and rate which way
are to be charge.
Sr. material to Departmental Place of
Particular Quantity
No. be charge Issue Rate Delivery
1. The contractor submitting the Tender shall see that the rate in Schedule-A are filled in by
the Engineer in Charge at the time of issue tender.
2. The contractor while submitting the tender shall provide his own arrangement at his own
cost for loading, unloading, and transporting safety to the site of work the cement
stipulated in Schedule-A
3. Binding wire of 15 gauge of thinner gauge required for placing the reinforcement in position
shall be provided at his own cost.
4. All the materials required for the items other than labour in Schedule-A but available with
the dept. will be issued on request to the contractor. (for use in this contract only) at
prevailing market rates or departmental issue rates whichever is higher.
5. All the surplus materials supplied by the dept. As mentioned in schedule-A should be handed
over to the Department by the contractor at the Govt. stores as directed.
6. The materials mentioned in schedule-A shall have to be checked for their correctness and
soundness by the contractor before taking the delivery of the materials from the
7. Necessary cement will be purchased by the agency at their own cost from open market.
8. The persons of firm submitting the Tender should see that rates in the above schedule are
filled up by the Executive Engineer, on the issue of form prior to the submission of the
Volume-III, PRICE BID M&R of NMC Based BK-4 Ph-2A RWSS
9. Carting of above materials should be done by contractor at his own cost.
10. Contractor should return the balance materials in good and acceptable condition, otherwise
recovery at the double rates will be affected in view of Clause 12.4.
Signature of contractor Deputy Executive Engineer Deputy Executive Engineer
P. H. S. Sub Dn., G.W.S.S.B, P. H. S. Sub Dn., G.W.S.S.B,
Anjar Gandhidham
Executive Engineer
P. H.W Division Anjar
Volume-III, PRICE BID M&R of NMC Based BK-4 Ph-2A RWSS
Name of Work : “Demolition of existing RCC ESR at Modsar HW & Demolition of existing
RCC ESR of 10.00 Lac. Liter capacity & 15 mt. height @ Rambaug H/w and Demolition of
Pump House and Staff Quarters at various locations “ANJAR REGIONAL WATER SUPPLY
SCHEME & M & R to KANDLA - GANDHIDHAM REGIONAL WATER SUPPLY SCHEME,: “M
Qty Unit Item Rate Unit Amount
Demolition & dismentalling of existing RCC ESR
of 10.00 lac. Liter capacity & 15.0 mt. Height
including stacking take away serviceable materials
like steel reinforcement bar, C.I. Pipe, C.I.
Specials, tees, bend, Sluice valve, G.I. 'Pipe
railing, C.I. Manhole frame & cover etc. With free
of cost And disposal of unserviceable materials
like C.C. & brick masonry scrap with all lead and
lift. And cleaning the site as directed by Engineer -
in - charge. Rate including the cost of scrap of all
serviceable materials.
1.00 Job Unserviceable ESR at Rambagh HW 1,45,000.00 Job
Scrap to be taken away
Demolition & dismentalling of existing Pump room
struture of Dismantling a pump room involves
safely isolating electrical power and piping,
draining fluids, and systematically removing
equipment. Key steps include disconnecting the
motor, removing coupling bolts, uncoupling the
pump from the motor, and disassembling the
pump casing, impeller, and mechanical seals, with
all parts labeled and secured. stacking take away.
With free of cost And disposal of unserviceable
materials like C.C. & brick masonry scrap with all
lead and lift. And cleaning the site as directed by
Engineer - in - charge. Rate including the cost of
scrap of all serviceable materials.
568.25 Sq.M. Pump House - Total 7 No's 450.00 Sq.M.
Scrap to be taken away
Volume-III, PRICE BID M&R of NMC Based BK-4 Ph-2A RWSS
The dismantling of staff quarters begins with a
thorough structural survey,followed by the
securing of the site with fencing. The demolition
proceeds in a top-down, storey-by-storey manner,
removing non-structural items, doors, windows,
and roof components first, then tackling load-
bearing walls and beams. Structural stability must
be maintained throughout, often requiring shoring,
with debris removed continuously to prevent
overload. Finally, the site is cleared of debris and
cleaning the site as directed by Engineer-in-
charge.Rate including the cost of scrap of all
serviceable material.
1230.00 Sq.M. Staff Quarter - Total 10 No's 450.00
Scrap to be taken away
Cutting, extracting and disposing off structural
steel & CI D/F pipes
21143.78 Kg a) Steel content -30.00 Kg -634313.40
Demolition including stacking of serviceable
materilas and disposal of unserviceable materials
with all lead and lift.
ESR @ Modsar HW 1.0Lac Capacity 1 nos 5 x 5 x
4m in to in Dimensions
1 Job Unserviceable ESR at Modsar Vadivistar 100000 Job
Cutting, extracting and disposing off structural
steel & CI D/F pipes
2532.00 a) Steel content -30.00 Kg -75,960.00
I / We am / are willing to carry out at % above / below
( Percentage should be written in figures and wors )
Estimated Amount Rs: 3,43,939.10 Estimated Amount Rs:
Tender Amount in Rs. Tender Amount in
Signature of contractor Executive Engineer
P. H.W Division Anjar
Volume-III, PRICE BID M&R of NMC Based BK-4 Ph-2A RWSS
1. As mentioned in the Conditions of contract, the Contract being a lump sum type
turnkey Contract on EPC basis, the provision of measurement will be applicable only
for the assessment of value of work done for inclusion in any interim certificate for
part payment to the Contractor.
2. The Schedule specifies the procedure for all such assessment of the items specified
3. Each item of Schedule-B has been divided into broad components. The Employer's
Representative shall assess the value of each component as indicated in paragraph
4. Percentages are indicated against each component of each items specified in
Schedule B, based on the Employer's best appreciation of the value of the
component as related to the total costs of the concerned item as whole. A head
titled (any other item(s)) is included in each breakdown of schedule and the
tenderer shall at the time of tendering indicate any additional items which he
considers necessary but cannot be covered by any of the heads indicated in the
5. The percentage breakup as indicated in the Schedule may differ from that
corresponding to the tenderer’s scheme and design and he should take this into
account while quoting his lump sum prices for the items specified in Schedule-B.
6. The contractor shall, after approval of his detailed designs and drawings furnish to
the Employer's Representative an initial bill of quantities to all major items, to be
reviewed and updated periodically with the Employer's Representative. This bill of
quantities will be used for assessment of percentage progress of the component at
any stage. By measurement jointly taken by the Employer's Representative and the
Contractor, mutually agreed and entered in the measurement books in the form and
by the method approved by the Employer's Representative, and signed jointly by
both the parties.
Signature of contractor Deputy Executive Engineer Deputy Executive Engineer
P. H. S. Sub Dn., G.W.S.S.B, P. H. S. Sub Dn., G.W.S.S.B,
Anjar Gandhidham
Volume-III, PRICE BID M&R of NMC Based BK-4 Ph-2A RWSS
BREAK UP FOR INTERIM PAYMENTS
(CIVIL, MECHANICAL, INSTRUMENTATION & ELECTRICALWORKS)
Item Description of Items Percentage Payment to
a On receipt of materials at project site 65 % of Quoted rate
b On Excavation, Lowering, laying and Jointing 20 % of Quoted rate
c On Hydraulic testing 5 % of Quoted rate
d On refilling and disposal of surplus stuff 5 % of Quoted rate
e After commissioning 5 % of Quoted rate
g On receipt of materials on site 70 % of Quoted rate
h On erection 20 % of Quoted rate
i On Hydraulic testing 5 % of Quoted rate
j After commissioning 5 % of Quoted rate
3 STAFF QUARTERS / PUMP ROOM
a. On approval of Designs 2.0 % of Quoted rate
b. On completion of Excavation & base slab 18.0 % of Quoted rate
c. On completion of vertical wall up to plinth 20.0 % of Quoted rate
d. Full supporting structure incl. ring beam and top slab 15.0 % of Quoted rate
e. On completion of pump house incl. fixing doors 10.0 % of Quoted rate
f. Plastering inside & outside with epoxy paint etc 10.0 % of Quoted rate
(completed with all respects)
g. Painting of letters, MS ladder pipe, railing and all 15 % of Quoted rate
miscellaneous items such as snowcem paints in three
coats etc. (completed with all respects)
h. After Completion 10 % of Quoted rate
4 GROUND (UNDERGROUND) LEVEL
RESERVOIRS/SUMPS
a. On approval of designs 2 % of Quoted rate
b. On completion of excavation and base slab 18 % of Quoted rate
c. On completion of vertical wall and braces 20 % of Quoted rate
d. Full supporting structure including column, ring 15 % of Quoted rate
and completion of top slab / dome
e. Plastering inside & outside with epoxy etc. complete 10 % of Quoted rate
f. Procurement and fixing of inlet, outlet, washout, 15 % of Quoted rate
overflow pipes, valves, specials, chambers, lighting
arrester conductor and specials at site
g. Water level indictor, painting of letters, M.S ladder, 10 % of Quoted rate
pipes, railing and all miscellaneous items such as
Volume-III, PRICE BID M&R of NMC Based BK-4 Ph-2A RWSS
snowcem paint in three coats etc (Completed with all
respect) including water tightness test
h. On hydraulic testing 10 % of Quoted rate
5 All Electro-mechanical works and
Instrumentation
a. On supply of material at work site in good condition 65% of Quoted rate
b. On erection of Equipment 25% of Quoted rate
c. On completion of Testing & Commissioning of 5% of Quoted rate
d. Satisfactory running of system. 5% of Quoted rate
6 WATER TREATMENT
PLANT(CONVENTIONAL )
(I) Site survey and subsoil investigations 1% of Quoted rate
Completion of field surveys and subsoil 25%
investigations and de-mobilization from site of
Submission of surveys and soil investigation reports 75%
and acceptance by the Engineer
(II) Detailed designs and construction documents 2% of Quoted rate
Substantial completion, submission and approval by 60%
the Engineer of the designs, drawings and
documents for all major items of work
Submission and approval by the Engineer of the 40%
designs and construction documents for all
remaining and miscellaneous construction details
and working drawings
(III) Inlet chamber 4% of Quoted rate
Excavation 5.0%
Works up to Ground Level 10.0%
RCC works up to top including all supply and fixing 60%
related materials
Finishing all surfaces including painting 15.0%
Hydraulic test 5.0%
Commissioning 5.0%
(IV) Raw water channel from inlet chamber To 2%
1 Excavation for supporting structure 5.0%
Works up to G.L. 15.0%
All RCC works including all supply and fixing of 30.0%
related materials upto floor level
Completion of all civil works including all supply 35.0%
Volume-III, PRICE BID M&R of NMC Based BK-4 Ph-2A RWSS
fixing of related materials
Hydraulic test 10.0%
Commissioning 5.0%
V) Flash Mixer 4 % Quoted rate
Excavation 5.0%
Works up to Ground Level 10.0%
R.C.C. works up to top including all supply and 60.0%
fixing of related materials
Finishing all surfaces including painting 15.0%
Hydraulic test 5.0%
Commissioning 5.0%
VI) Clariflocculator Works 2 0 % Quoted rate
RCC wall upto flooring including all supply and 30%
fixing of related materials
RCC wall upto 1st lift (50% of the design height) 5%
RCC wall lupto 2nd lift (100% of the design height) 10%
RCC wall upto top including all supply and fixing of 20%
related materials
Remaining all works including all supply and fixing 15%
of related materials
Hydraulic testing of water retaining structures 5%
Finishing of all surfaces and painting coating etc. 5%
Commissioning 5%
VII) RCC Channel from Clariflocculator to Filter Bed 5% Quoted rate
RCC Works for floor slab including all supply and 40%
fixing of related materials
Completion of all works and finishing all surfaces 50.0%
including painting, supply and fixing of related
Hydraulic test 5.0%
Commissioning 5.0%
VIII ) Filtration Works 40% Quoted rate
RCC wall upto filter floor level including pure water 10%
channel floor slab
Up to operating platform 15%
RCC wall upto top slab including all laboratory and 30%
Completion of all the remaining works including 30%
back wash tank and related arrangements; all supply
and fixing of related materials
Hydraulic testing/liquid retaining structures 5%
Volume-III, PRICE BID M&R of NMC Based BK-4 Ph-2A RWSS
Commissioning 5%
IV ) Chemical Works 15%Quotedrate
Excavation 5.0%
RCC/Masonry work below plinth 15%
RCC work upto 1st floor 30%
RCC works upto roof slab 20.0%
Completion of the remaining works including 30%
painting, finishing; supply and fixing of related
X Miscellaneous Works
THESE WORKS INCLUDES
By pass CI pipeline from Inlet chamber to clear
CI pipeline from flash mixer to clariflocculator.
Pure water CI pipeline from filter beds to clear water
sump. 5% Quoted rate
Bye pass CI pipeline from clariflocculator to clear
CI wash water pipeline from proposed wash water
tank to filter beds.
Wash water CI pipeline from filtration bed to
XI All other related and required works as directed 2% of Quoted rate
Submission of As built drawings and training to staff
10 Valve chambers
A On completion works as per approved drawings 95% of Quoted rate
B After commission of system 5% of Quoted rate
11 Miscellaneous work
A All other items such as encasing, columns support for 80% of quoted rate on
culvert, pipe bridges for Canal /Drain/Khadi crossing, completion of works
internal roads, railway/highway crossing, Anchor/thrust
blocks, steel bridge for pipe crossing, Construction of
Compound Wall & Repairing and Renovation work
B On commissioning of the system 20% of quoted rate
12 Operation and Maintenance
A Every month in equal instalment based on quoted
prices of O & M will be paid
Note: Any Changes to be made in all above Payment Schedule can be decided by
Chief Engineer, Zone-4, Kachchh and it shall be binding to the contractor
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
02.Vol 1 B GCC_compressed.pdf
03. 2 C Itemwise Specification.pdf
04.Vol - 3 Price Bid.pdf
Shedule A.pdf
Shedule B.pdf
01.Vol 1 A Technical Bid.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .