Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical/Finance ADMINISTRATIVE BUILDING SHIPYARD PREMISES SHIPYARD PREMISES M G ROAD PERUMANOOR ERNAKULAM KERALA ERNAKULAM KERALA 682015 | ERNAKULAM | KERALA | 682015 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
Refer Docs
EMD Value
₹1.1 L
Closing Date
5 Sept 2022, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
THE ADMIRAL SUPERINTENDENT
NSRY, KOCHI
DRY DOCKING AND RENEWAL OF DEEP SEA ECHO SOUNDER ONBOARD INS SAGARDHWANI
2022_NAVY_548903_1
PP/06/1130/SAG/DES/OR/22
Single
Marine Services
Item Rate
AT KOCHI
THE SHIPYARD MUST HAVE SUITABLE FACILITY AND SUFFICIENT INFRASTRUCTURE AT KOCHI FOR DRY DOCKING AND RENEWAL OF DEEP SEA ECHO SOUNDER ONBOARD INS SAGARDHWANI
4 documents required · 4 mandatory
₹0
₹1.1 L
Yes
6 Sept 2022
31 Aug 2022
6 Sept 2022
31 Aug 2022
5 Sept 2022
31 Aug 2022
31 Aug 2022 - 31 Aug 2022
Amount
ADMIN SERVICES
PROVISION OF SHORE GALLEY AND DINING HALL
SUPPLY 300 LITERS OF DRINKING WATER (AQUAFINA/ KINLEY/ BISLERY) PER DAY ONBOARD.
QUOTE FOR DAILY MAINTENANCE /UPKEEP/ CLEANSHIP OF ALL ABOVE MENTIONED ROOMS / WASHROOMS
(I) PROVIDE ONE AC SEDAN FIVE (05) SEATER CAR WHITE COLOR FOR PROJECT OFFICERS OF NSRY (15 HRS/150 KMS PER DAY)
(II) PROVIDE TWO 50 SEATER MINI BUS FOR TRANSPORTATION OF SHIP CREW FROM NAVAL BASE TO CSL AND BACK
GENERAL SERVICES
DOCK BLOCK PREPARATION FOR DOCKING OF SHIP IN VERSION - I, BOTH CENTER LINE AND SIDE BLOCKS. SHIPYARD TO ARRANGE FOR THIRD PARTY INSPECTION AND HAND OVER DULY RECOMMENDED CERTIFICATE FOR DOCK BLOCK PREPARATION TO NAVY POST INSPECTION
DOCKING AND UNDOCKING OF THE VESSEL IN VERSION-I. SHIPYARD TO PLAN AND COMPLETE ALL DRY DOCK RELATED WORK WITH IN DRY DOCK TIME. ELSE SHIPYARD TO CONTINUE DOCKING OF SHIP ALONG WITH ALL ALLIED SERVICES TILL COMPLETION OF WORK WITH OUT ANY EXTRA COST. PAYMENT WILL BE RESTRICTED TO ACCEPTED PERIOD OF CONTRACT (A) DOCKING & UNDOCKING (QUOTE AS ONE UNIT)
(B) SUBSEQUENT DAYS IN DOCK.
(C) ASSISTANCE FOR DOCKING & UNDOCKING (QUOTE AS ONE UNIT)
(D) ARRANGE PILOTAGE FOR TAKING THE VESSEL FROM NAVAL JETTY TO THE DOCK, DOCKING, UNDOCKING & DELIVERY OF VESSEL BACK AT NAVAL JETTY. QUOTE UNIT RATE PER DAY
(E) MOORING/UNMOORING AND LINE HANDLING FOR EACH OPERATION ESTIMATED FOR 2OPERATION
(A) PROVISION OF SHORE POWER 3 PHASE, 415V, 50HZ, FOR 15 DAYS IN DRY DOCK & FOR THE DURATION OF STAY FOR COMPLETE REFIT (RATES AS PER ACTUAL READING ON BOARD/ENERGY METER READING INSTALLED BY SHIPYARD) POWER SUPPLY CABLE AND METER TO BE PROVIDED BY SHIPYARD. QUOTE FOR 1000 KWH/DAY PAYMENT AT ACTUALS AS PER FINAL READING. SHIPYARDS TO INSTALL POWER METER/ENERGY METER IN SUPPLY LINE
(B) QUOTE FOR CONNECTION/ DISCONNECTION TAKEN FOR 02 TIMES)
(A) PROVIDE 02 SEA WATER FIRE MAINS WITH 06 BAR PRESSURE FOR ENTIRE DURATION WITH CONTROL VALVES AND NECESSARY SUPPLY HOSES. SHIPYARD TO CONNECT REFERENCE PRESSURE GAUGE AT DISCHARGE LINE. CALIBRATION CERTIFICATE OF PRESSURE GAUGES TO BE SUBMITTED
(B) CONNECTION AND DISCONNECTION OF LINES
SHIPYARD TO PROVIDE 04 PORTABLE AC UNITS (MINIMUM CAPACITY 15 TR EACH) WITH 04 AIR HOSES AND VENT PIPES TO SHIP DURING THE PERIOD OF DRY DOCKING. ADEQUATE FLEXIBLE HOSES TO CARRY CHILLED AIR FROM PORTABLE AC UNITS TO ACCOMMODATION AREAS, IN SHIP'S SUPERSTRUCTURE AND BELOW DECKS AND ELECTRONICS/ CONTROLS/ SENSOR COMPARTMENTS OF THE SHIP TO BE CATERED BY SHIP YARD. PAYMENT AT ACTUALS. RIGGING OF REQUIRED HOSES WIL BE RESPONSIBILITY OF THE SHIPYARD
(A) PROVIDE FRESH WATER 02 TONS PER DAYPAYMENT AT ACTUALS.
CONNECTION AND DISCONNECTION OF FRESH WATER SUPPLY.
PROVIDE FACILITIES FOR GARBAGE COLLECTION AND DISPOSAL ARRANGEMENTS (15 KG EACH) TWICE PER DAY FROM SHIP PAYMENT AT ACTUALS
PROVIDE 04 FIRE FIGHTING TRAINED HOT WORK SENTRIES WITH 02 SUPERVISORS FOR 16 HRS EACH DAY FOR THE DURATION OF REFIT. NUMBER OF SENTRIES REQUIRED WILL BE INTIMATED BASED ON SHIP YARD'S REQUISITION FOR HOT WORK RECEIVED THE PREVIOUS DAY. PAYMENT AT ACTUALS
TEMPORARY LIGHTINGS (20 LIGHT POINTS) AND VENTILATION ONBOARD FOR THE ENTIRE DURATION OF DOCKING
INSTALLATION OF DEEP SEA ECHO SOUNDER (ITEM AND OEM SUPERVISION WILL BE ARRANGED BY NPOL)
REMOVAL OF OLD TRANSDUCER AND CABLES
FITMENT OF NEW TRANSDUCER AND CABLE TO GEOPHYSICAL LAB
FITMENT OF CONTROL UNITS IN RACK MOUNTED ALMARAH
REORIENTTION OF SUB BOTTOM PROFILER TRANSDUCERS
REMOVAL OF OLD TRANSDUCERS AND CONNECTORS
FITMENT OF OLD TRANSDUCERS AND CONNECTORS POST CLEANING (MATERIAL REQUIRED FOR INSTALLATION ALONG WITH OEM SUPERVISION WILL BE ARRANGED BY NPOL)
OTHER JOBS
STEEL RENEWAL
DEGUTTING/REGUTTING
HP WATER WASHING OF UNDERWATER HULL, POST DOCKING OF SHIP.
UNDERWATER PAINTING – 150 SQ MTRS INCLUDING PROVISIONING OF UNDERWATER PAINT SCHEME.
REPLACEMENT / RENEWAL OF SACRIFICIAL ANODES CONSUMED MORE THAN 50 PERCENT (IF ANY) INCLUDING PROVISIONING OF ANODE.
RENEWAL/REPLACEMENT OF FAULTY (IF ANY) ICCP ANODES (BOTH INERT ANODES AND REFERENCE ELECTRODES) INCLUDING PROVISIONING AND INSTALLATION OF ANODES AND GRP COATING THEREAFTER.
SCRAPPING OF MARINE GROWTH ON HULL AND APPENDAGES.
OVERHAULING OF UNDERWATER VALVES (100 MM )
OVERHAULING OF UNDERWATER VALVES (125 MM)
OVERHAULING OF FIRE MAIN VALVES 100 MM
UNDERWATER PAINT TOUCH UP
BUDGETORY COST OF SPARES
stage.html
html • 0.02 MB
finance_613851.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .