Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.7 CrAdmitted-Finance | ₹1.7 Cr | L1 | Admitted-Finance |
| 2 | L2₹1.8 Cr+₹60,728.92 (0.35%)Admitted-Finance | ₹1.8 Cr+₹60,728.92 (0.35%) | L2 | Admitted-Finance |
| 3 | L3₹1.8 Cr+₹1.6 L (0.93%)Admitted-Finance POLICE LINE ROAD KUMOUR PITHORAGARH | ₹1.8 Cr+₹1.6 L (0.93%) | L3 | Admitted-Finance |
| Sl No | Description | Qty | Unit | Saun Engineering and Construction Co P Ltd L3 | Megha Sales L1 | vijay electricals L2 |
|---|---|---|---|---|---|---|
| 1.00SUPPLY OF FOLLOWING NON CENTRALISED MATERIAL | ||||||
| 2.00 | Bracing Clamp SP-72 | 40 | No. | 215 ₹8,600 | 210 ₹8,400 Lowest | 212 ₹8,480 |
| 3.00 | Holding Clamp for ST Pole SP-72 with nut and bolt | 20 | No. | 214 ₹4,280 | 210 ₹4,200 Lowest | 212 ₹4,240 |
| 4.00 | Stay clamp for SP-72 with N/b | 30 | No. | 214 ₹6,420 | 210 ₹6,300 Lowest | 212 ₹6,360 |
| 5.00 | IPC with aluminium bail for earthing | 45 | No. | 7,082 ₹3,18,690 | 7,000 ₹3,15,000 Lowest | 7,100 ₹3,19,500 |
| 6.00 | 11 KV Cable Ties for Pin insulator | 750 | No. | 2,996 ₹22,47,000 | 2,990 ₹22,42,500 Lowest | 2,992 ₹22,44,000 |
| 7.00 | 11 KV IPC for Covered conductor to Covered Conductor | 320 | No. | 2,996 ₹9,58,720 | 2,990 ₹9,56,800 Lowest | 2,992 ₹9,57,440 |
| 8.00 | 11 KV IPC for Covered conductor to Bare Conductor | 250 | No. | 3,587 ₹8,96,750 | 3,580 ₹8,95,000 Lowest | 3,585 ₹8,96,250 |
| 9.00 | 11 KV Mid Span Jointing Kit | 80 | No. | 3,094 ₹2,47,520 | 3,090 ₹2,47,200 Lowest | 3,092 ₹2,47,360 |
| 10.00 | 11 KV AAAC AL-59, 70 Sq mm covered Conductor | 24,680 | Mtr | 408 ₹1,00,69,440 | 405 ₹99,95,400 Lowest | 406 ₹1,00,20,080 |
Tender Value
₹2.1 Cr
EMD Value
₹3.5 L
Closing Date
9 Jul 2026, 4:00 pmClosed
SUPERINTENDING ENGINEER
OFFICE OF THE SUPERINTENDIENGINEER EDC PITHORAGARH
REPLACEMENT OF BARE ACSR CONDUCTOR BY AAAC COVERED CONDUCTOR IN TOWN 3 FEEDER UNDER EDD PITHORAGARH
2026_UPCL3_96980_1
13/EDC(P)/2026-27
Open Tender
Repair and Maintenance Services
Item Wise
365 days
PITHORAGARH
Please refer Tender documents.
2 documents required · 2 mandatory
₹11,800
UPCL PITHORAGARH
₹3.5 L
3 Sept 2026
25 Jun 2026
10 Jul 2026
25 Jun 2026
9 Jul 2026
25 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | SUPPLY OF FOLLOWING NON CENTRALISED MATERIAL | - | - | - | - |
| 2 | Bracing Clamp SP-72 | 40 | No. | - | - |
| 3 | Holding Clamp for ST Pole SP-72 with nut and bolt | 20 | No. | - | - |
| 4 | Stay clamp for SP-72 with N/b | 30 | No. | - | - |
| 5 | IPC with aluminium bail for earthing | 45 | No. | - | - |
| 6 | 11 KV Cable Ties for Pin insulator | 750 | No. | - | - |
| 7 | 11 KV IPC for Covered conductor to Covered Conductor | 320 | No. | - | - |
| 8 | 11 KV IPC for Covered conductor to Bare Conductor | 250 | No. | - | - |
| 9 | 11 KV Mid Span Jointing Kit | 80 | No. | - | - |
| 10 | 11 KV AAAC AL-59, 70 Sq mm covered Conductor | 24,680 | Mtr | - | - |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.64 MB
BOQ_114549.xls
BOQ • 0.33 MB
13AAACTENDERFORM.pdf
Tender Documents • 1.53 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .