Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹32 LAccepted-AOC AFL HOUSE LOK BHARTI COMPLEX FIFTH FLOOR WEST SIDE MAROL MAROSHI ROAD ANDHERI E MUMBAI MAHARASHTRA 400059 | MUMBAI SUBURBAN | MAHARASHTRA | 400059 | ₹32 L | 1 | Accepted-AOC L-1 accepted |
| 2 | 2₹35.4 LRejected-Finance 10 KIRPAL APARTMENT 44 I P EXTENSION EAST DELHI DELHI 110092 | EAST DELHI | DELHI | 110092 | ₹35.4 L | 2 | Rejected-Finance L-2 |
| 3 | Rejected-Technical NIGEEN HAZRATBAL SRINAGAR | - | - | Rejected-Technical Not-Qualified as per SBD requirement |
| Sl No | Description | Qty | Unit | MULTITECH ENGINEERS L2 | M/S EWAC ALLOYS LTD L1 |
|---|---|---|---|---|---|
| 1.00 | Refurbishment of damaged Runner along with replacement of Upper and Lower rotating labyrinths by new ones including transportation of runner along with its accessories from USHP-II Kangan Power House to factory works and back to site with the following scope:
(i) Repair and refurbishment of existing runner for making good pittings by way of welding, grinding and machining as per approved standards of IS/IEC/OEM.
(ii) Checking of ovalty and bringing same to OEM parameters/tolerance.
(iii) Providing and fitting of new Upper rotating Labyrinth and new Bottom rotating Labyrinth. All clearances as per OEM parameters/standards.
(iv) Providing of High-Velocity Oxygen Fuel (HVOF) Coating for refurbished runner as well as Labyrinths as per standards. The HP-HVOF coating thickness shall be minimum 200 microns. The Contractor shall provide requisite facilities to the JKPDC Inspector for measurement of HP-HVOF Coating thickness during the inspection.
(v) Supply of 12 No runner bolts as per sample.
(vi) Dynamic Balancing of runner at workshop. | 1 | Job | 35,40,000 ₹35.4 L | 32,00,000 ₹32 L |
Tender Value
₹36 L
EMD Value
₹72,000
Closing Date
7 Jan 2025, 3:00 pmClosed
Executive Engineer, GD USHP-II, Kangan
Kangan, Ganderbal
Refurbishment of damaged Runner along with replacement of Upper and Lower rotating labyrinths by new ones including supply of 12 No Runner Bolts at 105 MW (3x35 MWs) USHP-II, Kangan, HEP
2024_SPDC_266042_1
USHP-II/GD/28 of 2024-25
Open Tender
Machineries/ Mechanical Engg Items
90 days
Kangan
As per SBD
5 documents required · 5 mandatory
₹1,000
Yes
CP and AO Kangan, JKPDC
₹72,000
Yes
6 Dec 2025
27 Nov 2024
9 Jan 2025
27 Nov 2024
7 Jan 2025
4 Dec 2024
27 Nov 2024 - 3 Dec 2024
Amount
Refurbishment of damaged Runner along with replacement of Upper and Lower rotating labyrinths by new ones including transportation of runner along with its accessories from USHP-II Kangan Power House to factory works and back to site with the following scope: (i) Repair and refurbishment of existing runner for making good pittings by way of welding, grinding and machining as per approved standards of IS/IEC/OEM. (ii) Checking of ovalty and bringing same to OEM parameters/tolerance. (iii) Providing and fitting of new Upper rotating Labyrinth and new Bottom rotating Labyrinth. All clearances as per OEM parameters/standards. (iv) Providing of High-Velocity Oxygen Fuel (HVOF) Coating for refurbished runner as well as Labyrinths as per standards. The HP-HVOF coating thickness shall be minimum 200 microns. The Contractor shall provide requisite facilities to the JKPDC Inspector for measurement of HP-HVOF Coating thickness during the inspection. (v) Supply of 12 No runner bolts as per sample. (vi) Dynamic Balancing of runner at workshop.
MULTITECH ENGINEERS (BID ID -2285630)
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid