Loading…
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹42.4 LAdmitted-Finance | L1 | Admitted-Finance | |
| 2 | L2₹55.1 L+₹12.7 L (29.9%)Admitted-Finance 104 EAST MADHA CHURCH STREET ROYAOURAM CHENNAI TAMIL NADU 600024 | CHENNAI | TAMIL NADU | 600024 | L2 | Admitted-Finance | |
| 3 | L3₹1.1 Cr+₹68.5 L (161.5%)Admitted-Finance | L3 | Admitted-Finance | |
| 4 | L4₹1.4 Cr+₹93.1 L (219.5%)Admitted-Finance | L4 | Admitted-Finance | |
| 5 | Rejected-Technical D NO 11 57 2 BUILDING BARROMAMBA COLONY AGANAMPUDI GAJUWAKA VISAKHAPATNAM VISAKHAPATNAM ANDHRA PRADESH 530046 | VISAKHAPATANAM | ANDHRA PRADESH | 530046 | - | Rejected-Technical Technically Unsuitable |
| Sl No | Description | Qty | Unit | visakhatrades L4 | ST JOSEPH FIBER AND GENERAL ENGINEERING WORKS L1 | RAREFIELD ENGINEERS PVT LTD L2 | G1 OFFSHORE & MARINE PVT. LTD. L3 |
|---|---|---|---|---|---|---|---|
| 1.00Habitability Works of ORV Sindhu Sanklap | |||||||
| 1.01 | Protect the alleyway and other common areas by covering polythene sheets. The polythene sheets to be replaced, If the pld polythene sheets become defective (or) geteriorated. | 100 | M2 | 300 ₹1,50,000 | 24 ₹20,400 | 640 ₹80,000 | 100 ₹18,000 Lowest |
| 1.02 | Deck equipments to be protected from damages due to blasting and other dry dock works.
1) Port holes, Bridge windows, ECR windows, Accommodation door glasses and other openings to be protected from damages due to blasting and other dry dock works with 6 mm Plywood or GI sheet as required before blasting.
S.No: LOCATION QTY REMARKS
i) ship side-port-14 (port hole), ii) ship side -stbd-10 (port holes), iii)accomodation-port-06 (port holes), iv)accomodation-stbd-06 (port holes), v)chart room-04 (port holes), vi)master cabin-fwd-01 (port holes), vii)cheng cabin-fwd-01 (port holes), viii)wheel house-11 (glass windows), ix)wheel house entrance-doors-02 (door with glass) , x)wet lab-01 (glass window), xi)mp lab-stbd-01 (port hole), xii)mp lab-stbd aft-01 (glass window), xiii)accomodation entrance doors-p & s-02 (door with glass), xiv) co2 room-01 (port hole), xv) engine room sky light-02 (port hole)
2) Eco sounder sensor, Speed log sensor & Gondola sensors to be protected from damages due to blasting and other dry dock works with 6 mm Ply before blasting
3) Scientific equipments on Deck-CTD Winch,J-Frame Blocks,J-Frame HPU,Hydrographic winch,Oceanographic winch & HPU,A-Frame Block to be protected from damages due to dry dock repair works
4) Navigational equipments -03 Nos Gyro Repeaters (02 on Bridge wings & 01Nos on Monkey Island) Magnetic Compass o Monkey Island,All Radio & Communication Antennae's to be protected from damages during blsating/ dry dock repair works
5) ER sensors to be protected from damages due to dry dock repair works
6) Protective covering of any other machinery/Equipments in the vicinity should be provided to avoid damage.
7) Covering of all equipments,windows,lights & fittings in ER, deck & superstructure as required.
8) The protective materials to be replaced, If the protective covering material are found deteriorated/damaged. | 100 | M2 | 6,000 ₹30,00,000 | 400 ₹1,30,000 Lowest | 1,600 ₹2,00,000 | 1,200 ₹4,40,000 |
| 1.03 | Remove & Refit of Wooden Sheathings | 150 | M2 | 2,500 ₹18,75,000 | 1,000 ₹1,50,000 | 480 ₹90,000 Lowest | 1,750 ₹29,62,500 |
| 1.04 | Disposal of removed bad wooden sheathings (Final qty will be based on actual qty of bad sheathing) | 30 | M3 | 600 ₹90,000 | 800 ₹24,000 Lowest | 800 ₹30,000 | 1,200 ₹36,000 |
| 1.05 | Studs to be cropped and renewed (Grinder cut and welded). Wood grating securing nuts to be renewed. (M12 x 45) | 1,000 | NO | 40 ₹2,00,000 | 25 ₹35,000 Lowest | 160 ₹2,00,000 | 500 ₹7,50,000 |
| 1.06 | Wasted retaining channel sections will have to be cut and renewed. | 1 | LS | 40,000 ₹2,00,000 | 15,000 ₹35,000 | 9,600 ₹12,000 Lowest | 40,000 ₹40,000 |
| 1.07 | Caulking to be done with Okum and marline rope | 1 | LS | 16,000 ₹80,000 | 12,000 ₹27,000 Lowest | 54,400 ₹68,000 | 50,000 ₹95,000 |
| 1.08 | Removal & Refitment of Panelling(GI Powder coated Insulated Panels/Hylam Sheets/Perforated Panels etc.,) | 150 | M2 | 800 ₹6,00,000 | 470 ₹70,500 Lowest | 960 ₹1,80,000 | 800 ₹7,20,000 |
| 1.09 | Removal of Lagging / Insulation | 150 | M2 | 300 ₹2,25,000 | 100 ₹15,000 Lowest | 512 ₹96,000 | 600 ₹90,000 |
Tender Value
Refer Docs
EMD Value
₹50,000
Closing Date
23 Oct 2025, 11:00 amClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Sr.Manager SRC-OS
HSL Visakhapatnam
HABITABILITY WORKS ON ORV SINDHU SANKLAP
2025_HSL_98320_1
SR COMPLEX/PRODUCTION/OUT SOURCE REQUISITION/2025/447
Open Limited
Man Power Services
Service
45 days
HSL Visakhapatnam
Please refer Tender documents.
6 documents required · 6 mandatory
₹0
₹50,000
Yes
6 Nov 2025
16 Oct 2025
23 Oct 2025
16 Oct 2025
23 Oct 2025
16 Oct 2025
Amount
Habitability Works of ORV Sindhu Sanklap
Protect the alleyway and other common areas by covering polythene sheets. The polythene sheets to be replaced, If the pld polythene sheets become defective (or) geteriorated.
Deck equipments to be protected from damages due to blasting and other dry dock works. 1) Port holes, Bridge windows, ECR windows, Accommodation door glasses and other openings to be protected from damages due to blasting and other dry dock works with 6 mm Plywood or GI sheet as required before blasting. S.No: LOCATION QTY REMARKS i) ship side-port-14 (port hole), ii) ship side -stbd-10 (port holes), iii)accomodation-port-06 (port holes), iv)accomodation-stbd-06 (port holes), v)chart room-04 (port holes), vi)master cabin-fwd-01 (port holes), vii)cheng cabin-fwd-01 (port holes), viii)wheel house-11 (glass windows), ix)wheel house entrance-doors-02 (door with glass) , x)wet lab-01 (glass window), xi)mp lab-stbd-01 (port hole), xii)mp lab-stbd aft-01 (glass window), xiii)accomodation entrance doors-p & s-02 (door with glass), xiv) co2 room-01 (port hole), xv) engine room sky light-02 (port hole) 2) Eco sounder sensor, Speed log sensor & Gondola sensors to be protected from damages due to blasting and other dry dock works with 6 mm Ply before blasting 3) Scientific equipments on Deck-CTD Winch,J-Frame Blocks,J-Frame HPU,Hydrographic winch,Oceanographic winch & HPU,A-Frame Block to be protected from damages due to dry dock repair works 4) Navigational equipments -03 Nos Gyro Repeaters (02 on Bridge wings & 01Nos on Monkey Island) Magnetic Compass o Monkey Island,All Radio & Communication Antennae's to be protected from damages during blsating/ dry dock repair works 5) ER sensors to be protected from damages due to dry dock repair works 6) Protective covering of any other machinery/Equipments in the vicinity should be provided to avoid damage. 7) Covering of all equipments,windows,lights & fittings in ER, deck & superstructure as required. 8) The protective materials to be replaced, If the protective covering material are found deteriorated/damaged.
Remove & Refit of Wooden Sheathings
Disposal of removed bad wooden sheathings (Final qty will be based on actual qty of bad sheathing)
Studs to be cropped and renewed (Grinder cut and welded). Wood grating securing nuts to be renewed. (M12 x 45)
Wasted retaining channel sections will have to be cut and renewed.
Caulking to be done with Okum and marline rope
Removal & Refitment of Panelling(GI Powder coated Insulated Panels/Hylam Sheets/Perforated Panels etc.,)
Removal of Lagging / Insulation
Removal & Refitment of Carpentry Accommodation Items viz., Bunks, Cupboards, Lockers, Tables, Sofas etc., inway of Steel Renewals
Flooring in Crew & Scientist mess room -Scope of the work: i) Supply and Installation of Poly vinyl sheets of 3 mm thick. ii) Premium quality poly vinyl sheet to be supplied. iii) The colour and design will be chosen by NIO representatives/Technical superintendent and ship staff confirmation. iv) No need to remove the existing poly vinyl sheet & New poly vinyl sheet shall be put on the existing one. v) Side wooden skirts to be varnished and polished. vi) Bonding material and consumables, etc.. Required for the above scope of work to be supplied. All Degutting and Regutting inway of this jobs to be done. vii) Crew mess room - 8.8 Sq.m, Scientist Mess - 11.8 Sq.m
Rubber fenders provided on hull iwo CTD operation area to renew with NIO approval, Size of Each D-type Fender : 1500 mm length x 200 mm width
TRU room entrance door to be replaced with new. Type : A60 Insulated Door along with required fittings viz., Handle, Lock, Door closer etc.,
Conduit pipe on Main Deck upper From WET lab to TRU room deck FRP cooating to renew as required.
Wheelhouse ceiling panel to renew. As required.approx 8 m2. Type : Hylam Sheet
Cupboard unit with locking arrangement to be provided in Chart room to store Ships Document’s. All inway jobs to be included.
All wc tiles to check and renew as required
CHIEF SCIENTIST Cabin, SKIRTING TILES TO RENEW-AREA-0.5 sqm
DY CHIEF SCIENTIST Cabin, SKIRTING TILES-0.5 sqm, SIDE PANEL & CEILING TO RENEW-Area-2.0 sqm,
NIO-I (C-6),01 NO CEILING PANEL TO RENEW Size:1900 x 330 mm.
NIO-II (C-7A), Renewal of i) 02 NOS CEILING PANEL (SIZE: 206X30CM); ii) SKIRTING TILES-Area-0.5 sqm, iii) SHOWER HEAD, TOILET FLUSH SET WITH PIPE CLAMP AND BOTTOM DOOR FRAME
NIO-III (C-9), DOOR FRAME, SKIRTING TILES-0.5 sqm & WALL MIXTURE TYPE SANITARY FITTING TO BE PROVIDED FOR SHOWER N TAP
NIO-IV (C-10), BOOK RACK SECURING SIDE HOOK TO BE FIXED 01 NO.
NIO-V (C-12), DOOR FRAME & SKIRTING TILES-0.5 sqm TO RENEW.
NIO-VI (C-14), i) BOTTOM DOOR FRAME to renew ii) 04 NOS CEILING PANEL -2.0 sqm. iii) SKIRTING TILES & FLOOR TILES-2.5 sqm to Renew
SCIENTIST SEAMAN: i) 02 NOS CEILING, SIDE PANEL, TOILET FLUSH SET WITH PIPE CLAMP, SHOWER HEAD TO RENEW with required fittings. ii) SKIRTING TILES & FLOOR TILES-2.5 sqm to Renew
CAPTAIN & CHIEF ENGINEER: CEILING 02 NOS-1.0 sqm, SIDE PANEL AND SKIRTING TILES-0.5 sqm TO RENEW.
CHIEF OFFICER : i) BED DRAWER 01 NO TO REPAIR. ii)DOOR FRAME AND BOTTOM SECTION OF DOOR LOUVERER -(400 x 300mm x 02 Nos) TO RENEW, 02 NOS CEILING PANEL-1.0 sqm, WASH BASIN SECURING ANGLE PLATE & SKIRTING TILES-0.5 sqm TO RENEW. iii) WALL MIXTURE TYPE SANITARY FITTING TO BE PROVIDED FOR SHOWER N TAP
2ND ENGINEER: 04 NOS CEILING PANEL.TO RENEW.
2ND OFFICER: 01 NO CEILING PANEL-1900 x 330mm, 04 NOS CEILING PANEL-2.0 sqm., DOOR FRAME AND DOOR LOCK, SIDE PANEL, FLOOR TILES AND SKIRTING TILES-4.0 sqm, TOILET FLUSH PIPE SECURING CLAMP, WASH BASIN AREA BOTTOM PLATE, CORNER ANGLE FLAT SHEET TO RENEW.
3RD ENGINEER: i) 01 NOS CEILING PANEL TO RENEW.- 1900 x 330mm. ii)DOOR FRAME & DOOR LOWER PORTION LOUVERER -(400 x 300mm x 01 Nos TO RENEW. iii) DOOR FRAME, SIDE PANEL, 02 NOS CEILING PANEL-1.0 sqm, CORNER ANGLE FLAT SHEET, SKIRTING TILES -0.5 sqmTO RENEW.
ETO/COOK: BOTH BUNKS TO BE SHIFTED FURTHER DOWN SO AS TO PROVIDE MORE HEAD ROOM FOR THE UPPER BUNK AREA. (PRESENT UPEER BUNK HEAD CLEARANCE IS 1.5 ft ONLY)
OS/ASST.COOK/STWD: i) 02 NOS CEILING PANEL TO RENEW. ii)03 NO WARDROBE WOOD WORK TO RENEW AND LOCKING ARRANGEMENTS TO BE PROVIDED.
CREW BATH ROOM : i) 01 NO CEILING-1900 x 330mm. ii) WASH BASIN DRAIN PIPE, BATHROOM DOOR FRAME TO BE REPAIRED & LOCKING ARRANGEMENT TO BE PROVIDED. iii) SHOWER HEAD TO RENEW. iv) FLOOR & SKIRTING TILES-6.0 sqm TO RENEW.
CREW TOILET ROOM : i) 06 NOS CEILING-3.0 sqm. ii) WASH BASIN SECURING ANGLE PLATE, ALL DOOR FRAME & DOOR WITH LOCK ARRANGEMENT TO RENEW. iii) CREW TOILET CUMMODE PARTION BOARDS BOTTOM SECURINGS TO FIX.
AB : 01 NO CEILING PANEL TO RENEW.
HOSPITAL: i) SIDE PANEL, SKIRTING TILES-0.5 SQM & 01 NO CEILING-1900 x 330mm TO RENEW.
WET LAB: i) 03 NOS CEILING PANEL-3.0 sqm,SKIRTING TILES-2.0 sqm, 01 NOS DRAWER HANDLE, 03 NOS DRAWER LOCK TO RENEW. Ii) 01 NOS DRAWER WOOD WORK TO REPAIR. Iii) WASH BASIN TAP AND DRAINAGE PIPE TO RENEW.
DRY LAB: i) BOOK RACK LOCKING ARRANGEMENT TO RENEW. Ii) WASH BASIN TAP AND PIPE TO RENEW.
GALLEY: i) WHOLE CEILING PANEL TO RENEW- 6000 X 3500 MM. Material : SS Paneling ii) WASH BASIN DRAIN PIPE TO RENEW.
MP LAB: i) 05 NOS DRAWER LOCK ARRANGEMENT TO RENEW. Ii) 01 NO DRAWER TO REPAIR.
SERVER ROOM: 03 NOS CEILING PANEL-2.0 sqm TO RENEW.
BATTERY ROOM: AC DUCT PIPE LINE IWO BATTERY ROOM CORRODED SAME TO RENEW & INSULATION TO RENEW.
SCIENTIST LAUNDRY: 01 NO CEILING PANEL-1900 x 330mm, SIDE PANEL AND FLOOR TILES & SKIRTING TILES-1.5 sqm, DOOR FRAME BOTTOM SIDE TO RENEW.
CREW LAUNDRY: Ii) SKIRTING TILES-1.0 sqm, 01 NO CEILING PANEL-1900 x 330mm, WASH BASIN DRAIN PIPE TO RENEW.
CREW MESS ROOM: 02 NOS CEILING PANEL 3.0 sqm TO RENEW.
SCIENTIST MESS ROOM: DOOR LOCK HANDLE AND OTHER DOOR PLYWOOD TO RENEW.
SANITARY FITTINGS TOTAL OF:HEALTH FAUCETS-16 NOS / TOILET FLUSH UNITS:16 NOS / WASH BASIN TAPS:19 NOS /WALL MIXER UNITS:14 NOS /SHOWER HEADS:14 NOS to be Renewed.
Renewal of Insulation after Steel Renewals in accommodation areas, Material : Rockwool Insulation with aluminium foil facing, 50 Kg/M3 density, 25mm thickness. Type Approval certificate, Manufacturer's Test certificate to be submitted along with the material.
Renewal of Insulation after Steel Renewals in Engine room and other machinery areas, Material : Rockwool Insulation with aluminium foil facing, 110 Kg/M3 density, 50mm thickness. Type Approval certificate, Manufacturer's Test certificate to be submitted along with the material.
Refitment of old removed Lagging / Insulation
Pin welding / Application of glue as per ships requirement for installation of new Lagging / Insulation. All required items under contractor scope.
Rubber fenders provided on hull iwo CTD operation area to Remove or Modify with NIO approval, Size of Each D-type Fender : 1500 mm length x 200 mm width
ER VARIOUS MACHINERIES LAGGINGS Engine room defective laggings to be identified and renewed. 20 m² material is laminated glass wool out of 25m²
Renewal of WC side Panels in 3rd Engineer Cabin
Supply and Installation of new wooden sheathing (Final qty will be based on actual qty procured) (size in mm: 2500 x 100 x 50)
Meat room door beadings to be renewed.
Meat Room Lower door closer to be made operational.
Meat room insulation to be checked as its temperature escapes fast.
Meat Room Evapourator coil dip tray drain pipe should provided with insulation to avoid freezing water inside or draine line should be provided with heating coil.
All 3 cold rooms insulation must be checked including doors locks necessary repairing to be done
All 3 cold rooms doors locks necessary repairing to be done
RAREFIELD ENGINEERS PVT LTD (BID ID -420835)
G1 OFFSHORE & MARINE PVT. LTD. (BID ID -420839)
visakhatrades (BID ID -420833)
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .