Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance B 10 KRISHNA INDUSTRIAL ESTATE OPP B I D C GORWA ESTATE VADODARA 390016 GUJARAT | VADODARA | GUJARAT | 390016 | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
| 3 | Admitted-Finance 611 B E BLOCK GREATER KAILASH 2 NEW DELHI 110048 | SOUTH EAST | DELHI | 110048 | Admitted-Finance |
Tender Value
Refer Docs
Closing Date
27 Apr 2023, 6:00 pmClosed
CE RND DELHI
HQ CE RND Timarpur, Delhi-110054
CONSULTANCY OF AIR CONDITIONING OF DEAL COMPLEX UNDER GE (I) RND DEHRADUN
2023_MES_589316_1
31000/QTN/05/E3 Dt 13 Apr 2023
Limited
Consultancy Services
Works
45 days
Dehradun
As per NIT
4 documents required · 4 mandatory
₹0
Exempted
17 May 2023
13 Apr 2023
29 Apr 2023
13 Apr 2023
27 Apr 2023
20 Apr 2023
Amount
Design of Central Air Conditioning (HVAC)System for areas to be air conditioned and scope of HVAC along with location is as under:- Capacity Location (a) 30 TR P1 Bldg Second floor - Qty - 01 (b) 40 TR Satcom Bldg - Qty - 01 (c) 50 TR Environmental Lab - Qty - 01 (d) 70 TR P1 Bldg Ground + First floor - Qty - 01 The following inside conditions will be considered as per the scope of work:- (e) Dry Bulb Temperature. (f) Relative Humidity. (g) Occupancy State (Max & Min figures) active & very active person - as per scope of work. (h) If recirculation is permitted, No of air charges per hour to be specified - as per scope of work. (j) Total equipment load in KW inside the A/C Space - as per scope of work. (k) Size of dust particles permissible inside - as per scope of work. (l) Acceptable noise level - < 50dB. (m) No of hours the A/C Plant is required - 24 hrs per day for critical machine area. (n) Whether winter heating and humidification required - as per scope of work. (o) Chiller water required for liquid Nitrogen at 14 degree celsius & 3 m3/hr for rest of the area as per office hours. Outside conditions have to be considered based on local meteorological conditions & NBC 2016 norms. Designs shall meet relevant code requirements as per IS/NBC 2016/ECBC. Individual room wise temperature control, building management systems, automatic humidity & PLC control systems alongwith provision of heat pipes for energy conservator will be considered for incorporation in design. Environment friendly refrigerants will only be considered. Site Plan and Appx 'A' will be provided by GE.
Note:- 1. Rates are inclusive of prevetting of AC plans/drgs from users/HQ CE R&D Delhi. 2. Vetting of AC design from IIT/NIT/Govt Engg College is inclusive of quoted rate. 3. Rates are inclusive of all the design & drgs site/office visits by the consultation order to finalise. 4. Hard copy of site plan if required shall be provided by the GE. Quoted Rates will be inclusive of development of pans & HVAC design on AUTO CAD. 5. Design details included in scope of work are indicative in nature. Final data for incorporation in HVAC design shall be done in consultation with user and GE.
BLANK
Harvex Consultancy Services
Renaissance Arch Consultant Pvt Ltd
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .