Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.8 LAccepted-Finance | ₹8.8 L | L1 | Accepted-Finance L1 |
| 2 | L2₹11 LRejected-Finance | ₹11 L | L2 | Rejected-Finance L2 |
| 3 | L3₹12 LRejected-Finance | ₹12 L | L3 | Rejected-Finance L3 |
Tender Value
Refer Docs
EMD Value
₹2,000
Closing Date
30 Jun 2025, 11:00 amClosed
The Executive Engineer, CED-III, SDB
Office of The Executive Engineer, Civil Engineering Division No.-III, Sundarban Development Board, Bidhannagar Poura Bhavan 5th Floor, Salt Lake City, Kolkata 700106
Preperation of Detailed project Report in all respect including detailed Topographical Surveying Makhalgacha GP Hasnabad Block 2nd Call
2025_SAD_855160_1
WBSDB/EE/CED-III/ NIT-07(e)/2025-26
Open Tender
Consultancy
60 days
Hasnabad
Please refer Tender documents.
4 documents required · 4 mandatory
₹2,000
Yes
7 Jan 2026
3 Jun 2025
2 Jul 2025
3 Jun 2025
30 Jun 2025
3 Jun 2025
Amount
Preperation of Detailed project Report containing following items of work
1.1 Topographical survey of the proposed bridge over Habaspur Khal Mouza-Ghanashyampur,G.P-Hasnabad covering minimum area of 5 sq. km. 1.2 Hydrographical Survey of the proposed bridge over Habaspur Khal Mouza-Ghanashyampur, G.P-Hasnabad covering minimum area of 5 sq. km. including U/S and D/S side of proposed bridge over Hobgar Canal 1.3 Traffic Survey for a period of One month , at the proposed location of Habaspur Khal Mouza-Ghanashyampur, G.P-Hasnabad 1.4 Detailed Soil Report for determination of pile depth of proposed bridge over Habaspur Khal , Mouza-Ghanashyampur G.P-Hasnabad 1.5 Discharge calculation of Hobgar Canal , at least at two points , one at upstream side & another one at downstream side.of proposed location of Sonatala at Mouza-Ghanashyampur, G.P-Hasnabad 1.6 Vetting of waterways and Hydrological datas by I & WD. 1.7 Structural Design of proposed Bridge along with it's approaches over Habaspur Khal , Mouza-Ghanashyampur, G.P-Hasnabad from reputed Engineering Institute 1.8 Drawing ,Showing details of reinforcement , Sectional views and General arrangement Drawings of Bridge along with it's Approaches at Sonatala in Mouza-Ghanashyampur, G.P-Hasnabad from reputed Engineering Institute 1.9 Preparation of quantity and cost estimate for proposed Bridge along with it's approaches over Habaspur Khal Mouza-Ghanashyampur,G.P-Hasnabad from reputed Engineering Institute 2 Vetting of Analysis of rates for preparing of Estimate cost and quantity for proposed Bridge along with it's approaches over Habaspur Khal Mouza-Ghanashyampur,G.P-Hasnabad from reputed Engineering Institute 3 Cost of preparation of DPR
Fargo COnsultants Pvt. Ltd. (BID ID -6573731)
GLORY ENGINEERS SYNDICATE (BID ID -6583477)
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid