Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance 00 ARJUN NAGAR COLONY GOLA LAKHIMPUR ROAD GOLA KHERI UTTAR PRADESH 262802 | KHERI | UTTAR PRADESH | 262802 | Admitted-Finance |
| 2 | Admitted-Finance GRAM POST LAGUCHA DISTRICT LAKHIMPUR KHERI UTTAR PRADESH | KHERI | UTTAR PRADESH | 261501 | Admitted-Finance |
| 3 | Admitted-Finance NEAR GURU NANAK I C RAJGARH PUNJABY COLONY GATE KHERI UTTAR PRADESH 262701 | KHERI | UTTAR PRADESH | 262701 | Admitted-Finance |
Tender Value
₹2 L
EMD Value
₹2,000
Closing Date
25 Apr 2022, 1:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
SE EDC GOLA
Hydel Colony Near Block Office Lakhimpur Road Gola, Kheri.
TENDER NO 03/EDCG/2022-23
2022_MVVNL_686384_2
03/EDCG/2022-23
Open Tender
Miscellaneous Works
Item Rate
30 days
GOLA KHERI
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,180
SE EDC GOLA
₹2,000
26 Apr 2022
18 Apr 2022
25 Apr 2022
18 Apr 2022
25 Apr 2022
18 Apr 2022
30 days
Amount
fo|qr forj.k e.My xksyk ds vUrxZr fo|qr forj.k [k.M&xksyk [khjh ls izkIr fctusl Iyku ds vUrxZr forj.k ifjorZd dh {kerko`f) ¼dsUnzh;d`r lkexzh foHkkx }kjk ns; gksxk½ dk dk;ZA
Loading, carriage & unloading of 25kVA New TF from centre store to work site 11 kv feeder Sansarpur with its stacking.Dismounting & carriage of old TF of 16kVA from site to DTC centre and Proper connection at HT/LT of New T/F and successfully energization Under work area of EDD-Gola Kheri.
Loading, carriage & unloading of Droper Channel 01 Nos., 11kV disk insulator 03 Nos., MS angle 24kg., ABC cable (3X50) 200 Mtr., Stay Set complete 02 Nos., Earthing rod 02 Nos., Stay wire 10 kg., Wiesel conductor 30 Mtr., GI wire 5 kg., T-off chaneel 01 Nos., PCC pole 8.5 mtr 02 Nos. and Top channel 01 Nos. (for 16kVA to 25 kVA T/F working area of EDD-Gola Kheri.
Dragging of PCC pole to pit site, digging of pit erection and grouting (As per RESPO norms) of 11KV 9/11/8.5 mtr long PCC pole with fixing of necessary items, such as V-type X-arm, F-bracket, 11KV Pin/Disc insulator, guarding angle(1.8 mm65x65x6) with nut & bolts its ramming as per RESSPO Specification.
Erection of pole on 8.5 mtr long PCC/11 mtr. Long ST pole along with fixing of necessary hardware of doble pole alongwith necessery pin insulators as per RESPO specification and direction of E/I.
Laying of ABC cable (3X50 Sq mm)
Supply and fixing of suspension Eye Clamp with hook.
Supply and fixing of stay Clamp.
Supply and fixing of Holding clamp.
fo|qr forj.k e.My xksyk ds vUrxZr fo|qr forj.k [k.M&xksyk y[kheiqj ls izkIr fctusl Iyku ds vUrxZr forj.k ifjorZd dh {kerko`f) ¼dsUnzh;d`r lkexzh foHkkx }kjk ns; gksxk½ dk ¼dfczLrku½A
Loading, carriage & unloading of 63kVA New TF from centre store to work site 11 kv feeder Sansarpur with its stacking.Dismounting & carriage of old TF of 25kVA from site to DTC centre and Proper connection at HT/LT of New T/F and successfully energization Under work area of EDD-Gola Kheri.
Loading, carriage & unloading of Droper Channel 01 Nos., ABC cable (3X120) 20 Mtr., ABC cable (3X95) 150 Mtr.Earthing rod 02 Nos., GI wire 5 kg., PCC pole 8.5 mtr 07 Nos. (for 25kVA to 63 kVA T/F working area of EDD-Gola Kheri.
Dragging of PCC pole to pit site, digging of pit erection and grouting (As per RESPO norms) of 11KV 9/11/8.5 mtr long PCC pole with fixing of necessary items, such as V-type X-arm, F-bracket, 11KV Pin/Disc insulator, guarding angle(1.8 mm65x65x6) with nut & bolts its ramming as per RESSPO Specification.
Erection of pole on 8.5 mtr long PCC/11 mtr. Long ST pole along with fixing of necessary hardware of doble pole alongwith necessery pin insulators as per RESPO specification and direction of E/I.
Laying of ABC cable (3X50 Sq mm)
Supply and fixing of LT Clamp.
Supply and fixing of suspension Eye Clamp with hook.
Supply and fixing of Lug.
Laying of ABC cable (3X50 Sq mm)
fo|qr forj.k e.My xksyk ds vUrxZr fo|qr forj.k [k.M&eksgEenh [khjh ls izkIr fctusl Iyku ds vUrxZr forj.k ifjorZd dh {kerko`f) ¼dsUnzh;d`r lkexzh foHkkx }kjk ns; gksxk½ dk ¼dfczLrku½A
Loading, carriage & unloading of 100kVA New TF from centre store to work site 11 kv feeder J.B Ganj, Vill. UChauliya with its stacking.Dismounting & carriage of old TF of 63kVA from site to DTC centre and Proper connection at HT/LT of New T/F and successfully energization Under work area of EDD-Mohammadi Kheri.
Loading, carriage & unloading of 63kVA New TF from centre store to work site 11 kv feeder Khajuriya, Vill. Dehuwa with its stacking.Dismounting & carriage of old TF of 25kVA from site to DTC centre and Proper connection at HT/LT of New T/F and successfully energization Under work area of EDD-Mohammadi Kheri.
Loading, carriage & unloading of 100kVA New TF from centre store to work site 11 kv feeder Majhejha gokan, Vill. UChauliya with its stacking.Dismounting & carriage of old TF of 63kVA from site to DTC centre and Proper connection at HT/LT of New T/F and successfully energization Under work area of EDD-Mohammadi Kheri.
Loading, carriage & unloading of 63kVA New TF from centre store to work site 11 kv feeder Rajepur, Vill.Makrena with its stacking.Dismounting & carriage of old TF of 25kVA from site to DTC centre and Proper connection at HT/LT of New T/F and successfully energization Under work area of EDD-Mohammadi Kheri.
Loading, carriage & unloading of 25kVA New TF from centre store to work site 11 kv feeder Ameer Nagar, Vill. Ameer Nagar with its stacking.Dismounting & carriage of old TF of 10kVA from site to DTC centre and Proper connection at HT/LT of New T/F and successfully energization Under work area of EDD-Mohammadi Kheri.
Loading, carriage & unloading of 25kVA New TF from centre store to work site 11 kv feeder Barkhera, Vill.Pilyari with its stacking.Dismounting & carriage of old TF of 16kVA from site to DTC centre and Proper connection at HT/LT of New T/F and successfully energization Under work area of EDD-Mohammadi Kheri.
Carriage of PCC Double Pole complete.
Errection of PCC Double Pole complete.
Stay Complete
GST Extra
A K MISHRA CONTRACTOR
M/S JAISWAL INTERPRISES
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .