Title1, Title2, Title3, Title4, Title5, Title6, Title7, Title8, Title9, Title10, Title11, Title12, Title13, Title14, Title15, Title16, Title17, Title18, Title19, Title20, Title21, Title22, Title23, Title24, Title25, Title26, Title27, Title28, Title29, Title30, Title31, Title32, Title33, Title34, Title35, Title36, Title37, Title38, Title39, Title40, Title41, Title42, Title43, Title44 (A) Line Material., (B) PCC pole 8.5/9/11 Mtr long, (C) STP Pole 9/11 Mtr. long., (D)- T/F 10/16/25/63/100 KVA, (F)ACSR Rabit/Dog/Racoon/weasel/conductor, (G)ABC( 3x120/95/70/25/16) Sqmm., (H)11 KV XLPE Cable (3x35/70/120/185/240), (I) 11kv pilfer resistant metering cubical, (J) 33kv pilfer resistant metering cubical, (K)11 KV Pole mounted CT/PT, (L)DP Box 3 Phase, Fabrication, erection of sub-station type double pole on 8.5 mtr long PCC/11 mtr. Long ST pole along with fixing of necessary hardware of doble pole alongwith necessery pin insulators as per RESPO specification and direction of E/I., Dragging of ST/PCC pole to pit site, digging of pit erection and grouting (As per RESPO norms) of 11KV 9/11/8.5 mtr long ST/PCC pole with fixing of necessary items, such as V-type X-arm, F- bracket, 11KV Pin/Disc insulator, guarding angle(1.8 mm65x65x6) with nut & bolts its ramming as per RESSPO Specification., Dragging of ST/PCC Pole from dump store to pit site, digging of pit erection & grouting (As per RESPO norms) of LT support suitable for laying of ABC line on 8.5mtr long PCC pole by providing of necessary eye hook/LT shackle insulator with clamps and its accessories etc. as per RESPO specification. Only Pole will be provided by the department., erection T-Off pole single section
Loading…