| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹21.9 CrAccepted-AOC | ₹21.9 Cr Quoted ₹26.2 Cr | L1 | Accepted-AOC AOC |
| 2 | L2₹26.9 CrRejected-Finance 825 GANDHI CHOWK RANIKHET ALMORA | ₹26.9 Cr | L2 | Rejected-Finance Second Lowest |
Tender Value
₹20 Cr
EMD Value
₹40 L
Closing Date
5 Jan 2022, 5:00 pmClosed
Superintending Engineer
Office of the Superintending Engineer Construction Circle Uttarakhand Peyjal Nigam Gopeshwar
Survey Design and Construction of Kwilakhal Saunda group of village pumping water supply scheme
2021_MDPEY_40670_1
LetterNo4009/Lekha-05/96 Dated 20.12.2021
Open Tender
Composite Works
365 days
Kwilakhal Saunda Distt Rudraprayag
Please refer Tender documents.
3 documents required · 3 mandatory
₹5,900
Executive Engineer Construction Division UKPJN
₹40 L
Gopeshwar
15 Sept 2023
22 Dec 2021
7 Jan 2022
22 Dec 2021
5 Jan 2022
29 Dec 2021
28 Dec 2021
Amount
PART- A ( CIVIL WORKS ):- Survey investigation for possibilites of making Infiltration well from authorised agency and Design, testing bearing capacity of soiI and construction of R.C.C. Infiltartion well cum Pump House having 6.00 m internal Diameter and 19.00 m height (15.00 m height of steening of Intake well and 4.00m height of pump house) with R.C.C. approach bridge of 15.00 m length and 2.50 m width, also fitted with steel Trussed Ladder of 1.00 m width and 15.0 m height inside the well. The well should have 1.20 m wide balcony and projected roof all around at outer face with 1.20 m high G.I. pipe railing in 04 rows at @ 0.40 m c/c. The well should have proper arrangement of beam/girder to rest on floor and wall of pump house for lifting of pumps from well complete including diversion of river. The well should have all provision for Pumps Installation of required capacity in the bank of Mandakini River near by Tilwara nagar panchayat including supply and cartage of all materials, labour, T&P etc. complete excluding protection works but Including internal & external electrification, water level indicator, earthing work, complete painting work with Apex on both inner and outer sides of well etc. complete. (For any increase/decrease in these heights/lengths, rates are shouted below.)
Rate for variation in height of Infiltration well
for increase in height
For decrease in heigh
Rate for variation in length of approach bridge of Infiltration well
for increase in length
For decrease in length
Survey investigation for possibilites of making Infiltration well from authorised agency and if construction of Infiltration well is not possible than design, drawing, testing of bearing capacity, hydrological, geological survey and construction of water tight circular R.C.C. Dry Intake well cum pump house at the bank of river Mandakini near Tilwara nagar Panchayat with R.C.C. approach bridge of approximate 15 m length and 2.5 m width to withstand safely the river current (last 30 year)/ discharge, seismic/wind or all other natural effects and suitable for taking approximate 2.50 MLD raw water discharge(in 16 hours), including supply of all material, labour, T&P etc. required for proper completion of work. Inner diameter of well shall be 6.0 metre. Height of well is approximately 15.0 metre ( from lean water level to 2.0 M above H.F.L. of Mandakini river Near Tilwara nagar Panchayat) and depth of foundation below G. L. is assumed 8.0 M, which is liable to change according to geo-investigation, structural design and site conditions and HFL of river in last 30 year. Height of pump house will be 4.00 m (including space required for Motors, HT Pannels etc.). Atleast six inlets (on different levels/heights) with a common header should be installed at/above intake floor with stainer to tap river water, pipe arrangement for drazzing pump, M. S. girder 350 mm , sluice valves as required, 1.20 metre wide balcony all arround the well shaft above HFL, doors and windows, pump foundations, internal and external electrification work, painting, distempering and snowsem all inside and outside of well, four layer M. S. railing should be on aproach bridge/balcony with hand realing and there should be 1.0 metre wide spiral stair with hand rail from pump house floor to bottom of intake. The rates should be inclusive of river diversion, all excavation required for well and bridge and dewatering etc. The overall height of intake well is taken approximately 19.00 metre from top of raft foundation to pump house roof top, which will change according to conditions mentioned above. (For any increase/decrease in these heights/lengths, rates are shouted below.) The well shoud have all provisions for pumps installation of requaired capacity including all labour material T&P or as directed by Engineer in Charge.
Rate for variation in height of Intak well
for increase in height
For decrease in heigh
Rate for variation in length of approach bridge of Intak well
for increase in length
For decrease in length
If construction of Infiltration well is not possible than Survey, hydraullic/structural design, drawing, testing of soil bearing capacity, site development, boundry wall (with fencing at top) around MPS and construction of water tight R.C.C. 2.50 MLD Capcity (Raw water in 16 hours) rapid gravity filter treatment plant the design of filter plant has to be done on the CPHEEO manual for water supply and treatment. The filter plant consists of raw water inlet chamber with flow measuring device, pre PST, pre sedimentation tank (tube settler) (capable to remove all suspended monsoon impurities of river muddy water for removing maximum turbidity up to 1000 NTU), mixing unit, floculation unit, scondary settling tank, chemical house, laboratory wtih office room, hopper bottom settling tanks ( tube settler), rapid sand filter of four equal units with alum doser, bleaching or chlorine mixing doser & back wash arrangements, operation platform, clear water chamber, approved filter media, 0.60 M wide appron and 15 cm PC drain all around all units, gate/sluice valves and their chambers, discharge measurement at inlet and outlet unit,and all other appurtinent works. Including supply and fixing pipe for proper drainage arrangement upto out side the WTP campus, MSERW pipes for connecting the units, electrification and lighting arrangement inside and outside of operating plateform and filter, tiles flooring, double doors and windows in operating room, painting, distempering and snowsem all inside and outside of WTP, three layer M. S. railing should be on stairs, filter all as required or as directed by Engineer in Charge. The work also include inter connecting RCC inspection path way with hand railing to all unit as per site requirment, MS Jaal to protect water from wild animals and debrish, testing of all supplied maiterials. Including supply of all material, labour, T&P etc. required for proper completion and functioning of WTP. The rates shall be including of running and maintenance for one year including training of Peyjal Nigam staff during running and maintenance period of treatment works including all performance test of clarifier, settler, filters and quality of filtered water as per water supply manual.
Earth work in excavation by mechanical means (Hydraulic Excavator) / manual means in hill side cutting or in foundation, including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. (For all building works works including Site Development, except pipe line trenches)
Confirmatory survey , design, Supply, Carting laying and jointing with welding process with proper grade of electrodes suitable for jointing of water supply pipe line (ador, L&T for equivalent quality of electrodes) by cutting of pipes and making required bends by welding, making necssary conection for pumps and sump cum CWR at MPS & all IPS, fixing of air valve, sluice valve, reflux valve at suitable points including making scouring arrangement by fixing tee and gate valve etc with all appurtenat works with testing of supplied maiterials and completion of work with testing of pipe line etc completed following sizes API 5L Grade- X-56 and X-65 pipe at site of work. (The contractor have to survey the site, take levels with total station, measure the length of pipe with metallic tape on prescribed alignment and submit the design of rising main/supply main & distribution main for checking of thickness of pipe before ordering for supply of pipe). On completion of work the laid length of pipe will be deemed eligible for supply. The respective amount for quantity of surplus supply of pipes (which remained unlaid or unutilized) will be deducted from final bill and surplus quantity of pipes will be the property of contractor.)
150mm dia and 3.2 mm thick (API 5L X-56)
150mm dia and 4.8 mm thick (API 5L X-56)
150mm dia and 6.4 mm thick (API 5L X-56)
150 mm dia and 7.9 mm thick (API 5L X-65)
125 mm dia and 4.8 mm thick (API 5L X-56)
40 mm dia 4.00mm thick (API 5 L X-65)
50 mm dia 4.8 mm thick (API 5 L X-65)
Supply and fixing of the following fitting including cartage of materials labour T&P etc. complete.
125 mm dia CS Sluice Valve (P.N. 1.6).
150 mm dia CS Sluice Valve (P.N. 1.6).
100 mm dia CS Sluice Valve NRV (P.N. 1.0)
125 mm dia CS Sluice Valve NRV (P.N. 1.0)
CI air valve Double acting. 80mm dia
CI air valve (Screwed) 25 mm dia
Constructing masonry Chamber 120x120x100 cm, inside with 75 class designation brick work in cement mortar 1:4 (1 cement :4 coarse) for Reflux/sluice/air valve, with C.I. surface box 100 mm. as per standard design. with locking arrangement.
Painting of following sizes API Pipes with 2 coats of approved quality. (Anti-Corrosive paint over one coat of Primer)supply and cartage of all material, Labour and T&P etc, complete
125 mm dia
150 mm dia
Supply of all materials, labours, T&P etc and construct of 2.0 M wide briddle path along the alignment of rising main for cartage of rising main and later on for effective maintenance including R. R. Dry masonry in Retaining or brest wall (as and where required, as per site requirement) .
Construction of Anchor Block as per requirement of site) in R.C.C. with necessary reinforcement along the alignment of Raw water and Clear Water Rising Main including supply of all materials, labour, T&P etc. complete including cartage of materials
Subsoil Investigation, drawing, design and construction of following capacity RCC semi sunk reservoir, including testing and commissioning for water tightness, cost of all pipes/fittings etc. required for inlet/outlet/washout/byepass, excavation for foundation, 0.60 M wide appron with 15 cm PC drain, required sluice valve chamber, fixing water level indicator, lighening arrester, fixing 03 rowse railing at top dome (20 Kl & above), MS ladder (inside and outside of CWR), MS manhole with locking arrangement, ventilator with mosquito net, two coat snowcem/distemper/painting, including wall writing as per instructions given by E'ngineer In Charge, carting & supply of scafolding & shuttering, making supply and cartage of all material, Labour and T&P etc, complete. (Cap. in KL)
ACTARIS Bulk Water Meters model Woltex Class B magnetically coupled pre equipped for remote reading including supply, fixing, carting of material, labour T & P etc. Complete.
125 mm dia
150 mm dia
Constructing masonry Chamber 120x120x100 cm, inside with 75 class designation brick work in cement mortar 1:4 (1 cement :4 coarse) for Bulk water meter with C.I. surface box 100 mm. as per standard design. with locking arrangement.
Supply & fixing of MS Bucket type chlorinator of 25 liter Capacity including cartage of material, labour T & P etc complete
Confirmatory survey, design, supply carting , laying true to aligment and gradient, jointing and fixing of following pipe lines including all specials fittings, white lead, hemp and other appurtenant works etc. making necessary connections with existing laid pipe line including connecting existing house hold Connections with control plate devices etc complete and proper functioning ,confirming to IS:1239 at site of works. (The contractor have to survey the site, take levels with total station, measure the length of pipe with metallic tape on prescribed alignment and submit the design of rising main/supply main & distribution main for checking of thickness of pipe before ordering for supply of pipe). On completion of work the laid length of pipe will be deemed eligible for supply. The respective amount for quantity of surplus supply of pipes (which remained unlaid or unutilized) will be deducted from final bill and surplus quantity of pipes will be the property of contractor.)
G I PIPE (Medium)
20mm dia
25mm dia
32mm dia
40mm dia
50mm dia
65mm dia
80mm dia
100 mm dia
125 mm dia
Dismentling and relaying of following sizes of G.I. Pipes Medium quality confirming to IS:1239 at site of works including all labour T&P etc. complete for proper complition of work.
20mm dia
25mm dia
32mm dia
40mm dia
50mm dia
Earth work in excavation by mechanical means (Hydraulic Excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. For pipe line in following strata including supply of labour, T&P. etc complete. Assuming that 90% pipe line is laid in trenches, it is estimated that 75% excavation will be in soil mixed with shingle, bajri & boulders and rest 25% will be in medium rock.
Soil mixed with boulder and bajri
Medium rock
Supply and fixing of the following fittings including cartage of materials, labours, T&P etc complete gate/Wheel valves (Class-I) as per I S 788/1997
20mm dia
25mm dia
32mm dia
40mm dia
50mm dia
65mm dia
80mm dia
Constructing masonry Chamber 60x60x75 cm, inside with 75 class designation brick work in cement mortar 1:4 (1 cement :4 coarse sand) for sluice/air valve, with C.I. surface box 100mm. as per standard design. with locking arrangement.
Constructing masonry Chamber 60x60x60 cm, inside with 75 class designation brick work in cement mortar 1:4 (1 cement :4 coarse sand) for sluice/air valve, with C.I. surface box 100mm. as per standard design. with locking arrangement.
Supply of all materials, labour, T&P etc and construct of BPT as per type a design & drawing including fixing of pipe of fitting including cartage of materials etc. complete
Supply of all materials, labour, T&P etc and construct earthquake/vibration resistant, Pump house at having size 7.00 x 5.00 x 4.50 M. Including drawing, design, testing of soil bearing capacity, pump foundation et complete. Also including excavation for foundation, supply & fixing 01 rolling shutters, glazed windows, ventilator, 0.60 M wide sunshades, arrangement to support girders,girders, CC flooring, cable trench, electrification works, 0.60 M wide appron with drain, 0.60 M wide slab projection and two coat .snowcem/distemper/painting and proper drainage system.or as directed by Engineer in Charge. At MPS, IPS-I,
Design, testing bearing capacity of soil for construction of Staff Quarter of following type made up of Brick masonry with R.C.C. flat roof at each pumping station i.e. MPS, IPS and other appurtenant works as per approved design & drawing including proper arrangements of electrification work at inner and outer side, complete sanitory works as per requirements & supply of all materials, labour, T&P etc. complete.
Type I (Plinth Area – 43.00 Sqm)
Provision of 1.5 m high Boundary Wall in brick masonry including supply of all materials, labour, T&P etc. complete at MPS, IPS-I, & Top CWR
Provision of Barbed Wire Fencing through angle iron posts around the water works site including supply of all materials, labour, T&P etc. complete at MPS, IPS-I, & Top CWR
Provision of 3.6 m wide Iron Gate with construction Pillars at MPS, IPS-I & Top CWR
Provision of Drainage System consisting of following works -
Main hole Chamber
Supply & laying of drainage 250 mm dia. RCC NP2 pipe
Supply of all materials and construct 150 mm S.C. drain including supply of all labour T&P etc complete
MS iron work in reinforcement
Providing and laying in position of reinforced cement concrete (R.C.C.) 1:1.5:3 in cement, sand & 20mm gauge stone ballast including cost of design etc if required but excluding cost of reinforcement .
R.R. Stone masonary with 1:6 cement and sand mortar including cartage and supply of all materials,labours,T&P etc. complete for proper completion of work.
R.R.Stone masonry laid in dry including cartage and supply of all materials,labours,T&P etc. required for proper completion of work.
Concrete with 2 Cm gauge stone ballast, local sand and cement in proportion of 1:2:4 in foundation and floors including supply of all materials, labour and T&P etc.required for proper completion of work.
Concrete with 4 Cm gauge stone ballast, local sand and cement in proportion of 1:4:8 in foundation and floors including supply of all materials, labour and T&P etc.required for proper completion of work.
PART B: ELECTRICAL & MECHANICAL WORKS
SITC of pump[ing plant
Split case centrifugal Raw water pump
LT motor for Raw water pump
Automatic starter for Raw water
Control panel for Raw water
Multistage clear water pumps for MPS
HT motors for MPS
HT control panel with all accessories
LT control panel for MPS
Multistage clear water pumps for IPS
LT motors for IPS
Automatic starter for IPS
LT control panel for IPS
Main piping valves & specials for Raw water
Main piping valves & specials for MPS
Main piping valves and specials for IPS
35 sq mmx 3.5 core Al. LT cable
16 sqmm x 3 core Cu. Submersible cable
240 sq mm x 3.5 core Al. LT cable
70 sq mm x 3 core Cu. Submersible cable
Jointing material
GI earthing for pumping plant
Gauges for Raw water
Gauges for MPS
Gauges for IPS
Tools for Raw water
Tools for MPS
Tools for IPS
Rubber resistance sheet
Chainpulley block with travelling trolly for Raw water
H.O.T crane for MPS and IPS
Testing of pumping plant at works
Testing of pumping plant at site
Painting of pumping plant
Transformers 63 KVA for MPS
Transformers 315 KVA for IPS
Testing of transformers at works
50 sq mm x 3 core Al. HT cable
35 sq mm x 3 core Al. HT cable
HT cable jointing kits
Earthing of transformers
Fecncing of transformers at MPS
Fecncing of transformers at IPS
Outdoor HT panel
AUTOMATION WORKS
SITC of MCS/LCS with all accessories as per site requirement
GSM based remote terminal unit
GSM based wireless communication hardware for RTU's
Electromagnetic insertion type flow meter 150 mm
Energy meter
Valve actuators 150 mm
Actuator panel
Hard wire timer circuit
Pressure transmitter
Isolation transformer
Over voltage & under voltage trip protection
Level transmitter
2 core x 1.5 sq mm PVC coated Cu. Cable
4 core x 2.5 sq mm PVC coated Cu. Cable
4 core x 1.5 sq mm PVC coated Cu. Cable
10 core x 1.5 sq mm PVC coated Cu. Cable
Conduit pipe PVC 1"
Conduit pipe PVC 1.5"
Accessories
Customization & Integration of software
ELECTRIFICATION OF PUMP HOUSES
Wiring point for light, fan etc
Submain 2x2.5 sq mm + 1 x 2.5 sq mm
Submain 2x4.0 sq mm + 1 x 4.0 sq mm
Supply & Fixing of metal box
Supply & Fixing of SPN DB
Supply & Fixing of MCB
Supply & Fixing of D.P isolator
Supply & Fixing of LED tubelight
Supply & Fixing of LED external lightening
Operation & Maintenance
O&M of pumping stations in auto mode for 6 months
O&M of pumping stations in auto mode for 6 months
M/s Kashmirilal Constructions Pvt. Ltd.
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid