Maintenance and Upgradation of Range Office Ganderbal at Waheedpora Nursery in District Ganderbal, Social Forestry Range Ganderbal, SF Division Srinagar. Under Capex 2026-27
2026_FD_326166_1
2026_SFD_ROGBL
Open Tender
Civil Works
Percentage
60 days
Ganderbal
Please refer Tender documents.
2 documents required · 2 mandatory
₹300
0406-Forest
₹18,320
26 Sept 2026
26 Sept 2026
7 Oct 2026
26 Sept 2026
6 Oct 2026
26 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Maintenance & Upgradation of Range Office Ganderbal at Waheedpora Nursery in District Ganderbal, Social Forestry Range Ganderbal | - | - | - | - |
| 2 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed. All kinds of soil | 6.4 | CUM | 479.3 | ₹3,067.52 |
| 3 | Providing & Laying of RCC Rings for Sokage Pit | 9 | NO | 500 | ₹4,500 |
| 4 | Centering and shuttering including strutting, propping etc and removal of form work for. Suspended Floors | 6.41 | SM | 718.2 | ₹4,603.66 |
| 5 | Reinforced cement concrete work in beams, suspended floors, roofs having slope upto 15 degree landings balconies, shelves, chajjas, lintles, bands, plain window sills, staircases and spiral stair cases upto floor five level exculding the cost of centering, shuttering, finishing and reinforcement with 1:2:4 ( 1 cement: 2 coarse sand: 4 graded stone agg 20mm nominal size). | 1.92 | CUM | 7,104.35 | ₹13,640.35 |
| 6 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. (Thermo-Mechanically Treated bars of grade Fe-500D or more). | 153.5 | KG | 123.2 | ₹18,911.2 |
| 7 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 40 mm nominal size) | 1.42 | CUM | 6,540.45 | ₹9,287.44 |
| 8 | Half Brick masonry with FSG bricks of class designaion 75 in foundation & plinth with super structure upto floor V level in cement mortor 1 cement:4 coarse sand. | 1.39 | SM | 947.25 | ₹1,316.68 |
| 9 | Cement concrete flooring 1:2:4 ( 1 cement : 2 coarse sand : 4 graded stone agg.) finished with a floating coat of neat cement including cement slurry. But excluding the cost of nosing of steps etc complete. (50 mm thick with 20 mm nominal size stone. Crushed. | 52.88 | SM | 562.15 | ₹29,726.49 |
| 10 | Making plinth protection 50mm thick of cement concrete 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) over 75mm bed of dry brick ballast 40mm nominal size well rammed and consolidated and grouted with fine sand including finishing the top smooth and curing complete. | 31.37 | SM | 572.8 | ₹17,968.74 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.48 MB
BOQ_1102813.xls
BOQ • 0.45 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .