Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.6 CrAccepted-AOC | ₹1.6 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹1.8 Cr+₹13.4 L (8.14%)Rejected-AOC | ₹1.8 Cr+₹13.4 L (8.14%) | L2 | Rejected-AOC L2 |
Tender Value
₹1.6 Cr
EMD Value
₹3.3 L
Closing Date
10 Oct 2022, 5:00 pmClosed
EE Ujs Ghansali
EE Ujs Ghansali
Reorg Work Of Molno GOV Water Supply Scheme
2022_UKJS_49810_1
705/E-tender/JJm/2022-23 Dt 20.09.2022
Open Tender
Civil Works - Water Works
Item Wise
270 days
Molno
Please refer Tender documents.
2 documents required · 2 mandatory
₹4,720
EE UJS Ghansali
₹3.3 L
EE Ujs Ghansali
13 Jun 2023
26 Sept 2022
12 Oct 2022
26 Sept 2022
10 Oct 2022
27 Sept 2022
27 Sept 2022
Rates for Source Reorganization and FHTC Work Molno G.O.V. Water Supply Scheme
SOURCE & TREATMENT WORKS
Construction of R.C.C. Intake chamber having (1.0 m*1.0m*1.5m) Size at tapping point of under existing water supply scheme for collection of water including supply of all materials, labour , T&P etc.
Construction of R.C.C.roughing filter cum screening chamber near by tapping point of under existing water supply scheme for collection of water including supply of all materials, labour , T&P etc.
Construction of a Cross Wall including supply of all material , labour , T&P etc Complete
Protection Works
Earth work in excavation by machanical means (Hydraulic excavator)/ manual means over areas (exceeding 30 cm in dept, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.
Providing and Laying in position cement concrete of speciafied grade excluding the cost of centring and shuttering-- All work upto plinth level 1:4:8 (1 Cement:4 Caorse sand :8 graded stone aggregate 40 mm nominal size).
RR stone masonary with 1:6 cement and sand mortal nearby sources and along the pipe line for proper completion of work.
RR stone masonary laid in dry for proper completion of work along the pipe line.
Belder for site clearance and other unforeseen items
SCHEDULE OF GRAVITY MAIN
Excavation of earth for pipe line in following strata lift upto 30 M including refilling, watering, ramming of excavated earth into the trenches and removal of surplus earth upto a distance of 60 M. from trenches including supply of labour, T&P etc. all complete (Assuming that 90% pipe line is laid in trenches. It is estimated that 75% excavation will be in soil mixed with shigle, bajri and boulders and rest 25% will be in medium rocks. Soil mixed with boulders & bajri
Soft rocks
Providing of all materials,carting from site store to site of wok,laying & Jointing of G.I. screwed pipes (Including supply of all jointing materials like specials, white lead,hemp and oil etc.) in trenches with its cutting, threading and testing of pipe line etc Complete. G.I. Medium quality 20 mm
B) C.I. D/F Sluice Valves Confirming to IS: 14846-2000(Kirloskar or equivalent) Pressure PN 1.0 15 mm (T.P.- 10Kg /Sqcm)
Supply of all materials, labour, T&P etc. and construct gate valve chambers as per type design Complete.
Supply of all materials, labour, T&P etc. and construct air valve chambers as per type design Complete.
Supply of all materials, labour, T&P etc. and construct BPTas per type design Complete.
Protection Works
RR stone masonary with 1:6 cement and sand mortal nearby sources and along the pipe line for proper completion of work.
RR stone masonary laid in dry for proper completion of work along the pipe line.
Belder for site clearance and other unforeseen items
DISTRIBUTION SYSTEM
Excavation of earth for pipe line in following strata lift upto 30 M including refilling, watering, ramming of excavated earth into the trenches and removal of surplus earth upto a distance of 60 M. from trenches including supply of labour, T&P etc. all complete (Assuming that 90% pipe line is laid in trenches. It is estimated that 75% excavation will be in soil mixed with shigle, bajri and boulders and rest 25% will be in medium rocks. Soil mixed with boulders & bajri
Soft rocks
Providing of all materials,carting from site store to site of wok,laying & Jointing of G.I. screwed pipes (Including supply of all jointing materials like specials, white lead,hemp and oil etc.) in trenches with its cutting, threading and testing of pipe line etc Complete. G.I. Medium quality 15 mm
SCHEDULE OF CLEAR WATER RESERVOIR
Supply of all Material,labour,T&P and contruct R.C.C. with MS ladder inside the tank M.S. M.H. cover with locking arangement,supply and fixing of outler,inlet overflow washout pipes,flooring 0.6 m wide apron,painting on tank body,ladder, M.S. M.H. cover etc. Complete with approved water proofing,testing,filling water for testing purpose,incl supply of vertical pipes and specials. 3.00 KL Cap.
12.50 KL Cap.
15.00 KL Cap.
25.00 KL Cap.
Sign board
M/S Jairaj Khanka
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .